急救常识培训(中英对照)

2024-09-06

急救常识培训(中英对照)(精选4篇)

1.急救常识培训(中英对照) 篇一

Abstract 提要

With the rapid development of GWDC Drilling Branch’s overseas market and business, more and more new employees are getting to be engaged with international drilling activities who know little about HSE or even never get in touch with HSE basic knowledge before they enter into GWDC.As the consistent recognition and acknowledgement of all of us, GWDC, being an IADC important member, always pay extreme emphasis to its HSE performance and HSE training to its Chinese and overseas staff.随着长城公司钻井分公司海外市场和业务的迅速发展,越来越多的新员工在加入长城公司时,对从事国际钻井作业相关的 HSE 知识了解甚少,甚至从未接触。随着长城公司的声誉不断扩大,并且作为国际钻井承包商协会的重要成员,长城公司对公司旗下中国员工和海外员工 HSE 实践和 HSE 培训格外重视。

On the basis of being brief, easily-understandable, effective and capable of self-teaching, this manual aims at these new employees with the purpose of helping them to grasp HSE fundamental idea and being equipped with HSE common practices in order to meet HSE requirement from GWDC clients.It is a supplement to GWDC HSE Procedure Manual and Operation Manual.Those two manuals cover the other HSE documents and information whereas not being introduced in this manual.本着简明、易懂、实用和便于自学的原则,这本手册针对那些新员工,帮助他们领会HSE 的基本要点,掌握 HSE 一般实践内容,从而满足长城公司客户的要求。本手册还是对长城公司已有的 HSE 实用手册的补充。前面已有的两本 HSE 手册涉及的内容,本手册不再介绍。

SECTION ONE – HEALTH SAFETY AND ENVIRONMENT PROGRAMS 第一部分:健康、安全与环境方案 1.0 HSE Meetings HSE 会议

1.1 Safety Inspections and Logbooks 安全检查与记录 1.2 Job Safety Analysis 岗位风险识别 1.3 Incident Investigation 事故调查

1.4 Visitor / Service Personnel Orientation 外来人员指导培训

SECTION TWO – GENERAL GUIDELINES AND HEALTH CONTROL 第二部分: 一般指导和健康预防

2.0 General Housekeeping 物品摆放一般要求 2.1 Sanitation 卫生

2.2 Personal Hygiene 个人卫生 2.3 Drugs 毒品和药品

2.4 Fitness for Duty 岗位对健康的要求 2.5 Smoking 吸烟

2.6 Horseplay 打斗、玩耍与开玩笑 2.7 Proper Lifting Techniques 拿举重物技巧

2.8 Naturally Occurring Radioactive Material(NORM)遭遇天然放射性物质 2.9 Heat Stress and Heat Related Conditions 受热和与高温环境 SECTION THREE – EQUIPMENT SAFETY 第三部分: 设备安全

3.0 Electrical Equipment 电气设备

3.1 Control of Hazardous Energy – Lockout / Tag-out 危险源的控制 –

锁死(安全保险)/ 警示标志 3.2 Hand Tools 各种手用工具

3.3 Drill Pipe / Collar Slips and Elevators 钻杆 / 钻铤卡瓦和吊卡 3.4 Hoists(Winches / Tuggers)提升设备(各种绞车 / 各种卷扬机)3.5 Pipe Tongs and Lines 管钳和绳索 3.6 Rotary Table Area 转盘区域 3.7 Equipment Guarding 设备防护

3.8 Derricks and Masts 井架(塔形井架与 A 形井架)3.9 Pipe Racks and Bins 管子架和储存盒 3.10 Derrickman’s Escape Device 井架工逃生装置

3.11 Drilling Line, Crown Block and Traveling Block 大绳、天车和游车 3.12 Drawworks, Brakes, Clutches 绞车、刹车、离合器 3.13 Mud Pumps and Equipment 泥浆泵与设备 3.14 Mud Pits and Equipment 泥浆池与设备

3.15 High-Pressure Lines and Fittings 高压管汇与配件 3.16 Engines 动力设备

3.17 Air-Operated Equipment 气动气控设备 3.18 Blowout Prevention Equipment 防喷器设备

3.19 BOP Accumulators, Pulsation and Suction Dampeners 防喷器蓄能器、蓄能器胶囊(空气包)

3.20 Stabbing Board(套管)扶正对扣台 3.21 Handling Tubulars 操作各种管子

SECTION FOUR – FIRE PREVENTION, FIRE FIGHTING AND FIRE CONTROL 第四部分:火灾预防、灭火和控制 4.0 Fire Prevention 火灾预防 4.1 Fire Protection 火灾预防 4.2 Fire Control 火灾控制

SECTION FIVE – WELDING, CUTTING AND COMPRESSED GAS & OXYGEN CYLINDERS 第五部分:焊接、切割和压缩空气 / 氧气瓶

5.0 General Precautions – Welding, Cutting and Other Spark/Flame Producing Operations 一般预防:电焊、气焊切割、其它遭遇火花/火焰的作业 5.1 Protective Equipment 预防设备

5.2 Preparatory – Precautions 事先预防:提示警告 5.3 Specific Precautions – Arc Welding 特殊提示:电弧焊

5.4 Specific Precautions – Gas Welding and Burning 特殊提示:气焊与燃烧 5.5 Compressed Gas and Oxygen Cylinders – Storage 压缩空气瓶和氧气瓶:存放 5.6 Cylinder Handling 气瓶搬运与安放 5.7 Cylinder Usage 气瓶使用 SECTION SIX – FLEET SAFETY 第六部分:机动车辆驾驶安全 6.0 General Rules 一般规则

6.1 Safe Driving Concepts for Accident Prevention 事故预防、安全驾驶原则 SECTION SEVEN – CRANE OPERATIONS 第七部分:吊车作业

7.0 General Operation Requirements 一般操作要求 7.1 Slings and Shackles 吊索 和 各种钩环

7.2 Standard Hand Signals for Crane Operations

起吊作业时使用的标准手势信号 SECTION EIGHT – FORKLIFT OPERATIONS 第八部分:叉车操作

8.0 General Operation Requirements 一般操作要求

8.1 General Training Requirements 一般培训要求

SECTION NINE – CONFINED SPACE ENTRY GUIDELINES 第九部分:进入危险区域指导 9.0 Procedures 步骤 9.1 Entry 进入危险区域 9.2 Exit 退出危险区域

SECTION TEN – HYDROGEN SULFIDE 第十部分:硫化氢

10.0 Properties of H2S 硫化氢的特点

10.1 H2S Exposure Limits 接触硫化氢的极限指标

10.2 Rescue/First Aid Procedures – Hydrogen Sulfide 遭遇硫化氢后 抢救/急救步骤 10.3 Detection 硫化氢检测

10.4 Breathing Equipment(SCBA)呼吸设备(自给式呼吸器)

SECTION ELEVEN – PROTECTION OF THE ENVIRONMENT 第十一部分:环境保护

11.0 Spills Prevention and Control 泄漏的预防与控制

11.1 Drilling Site Environmental Considerations 钻井井场环境保护要考虑的因素 11.2 Material Storage 各种材料的存放 11.3 Waste Management 废物的管理 11.4 Camp Expectations 营地的管理

SECTION TWELVE – EMERGENCY ACTION PLAN(S)第十二部分:各种紧急预案

12.0 Medical Emergency Action Plan 医疗紧急预案 12.1 Media Crisis Communication 媒体危机时的沟通交流 12.2 Emergency First Aid 紧急急救

12.3 Emergency Procedure on Blow-out 井喷时的紧急预案 12.4 Emergency Procedure Against H2S 遭遇硫化氢时的紧急预案 12.5 Emergency plan against fire扑灭火灾时的紧急预案 SECTION THIRTEEN – DROPPED OBJECT PREVENTION 第十三部分:预防落物

13.0 Equipment Inventory 设备清单

13.1 Derrick/Mast Equipment Guidelines 井架设备安全指导 SECTION FOURTEEN – AIR AND GAS DRILLING 第十四部分:空气钻井

SECTION FIFTEEN – PERSONNEL HOISTING OPERATIONS 第十五部分:起吊人员作业 15.0 General 一般要求

15.1 Job Safety Analysis / Pre-Job Checklist 岗位风险识别 / 上岗前检查内容表15.2 Pre-Job Safety Meeting 上岗前安全会议 15.3 Personnel Lifting Operations 起吊人员操作

15.4 Winch Operator(s)绞车操作人员 SECTION SIXTEEN – FALL PROTECTION 第十六部分:预防坠落

16.0 General Fall Prevention 坠落的一般预防 16.1 Key Requirements for Fall Arrest Systems 对坠落预防设施的要求重点 16.2 Work at a Height 高空作业

16.3 Fall Restraint System and Equipment 预防坠落设施 SECTION SEVENTEEN – RIG PERSONNEL OBLIGATIONS 第十七部分:井队人员职责

17.0 rig manager obligations平台经理职责 17.1 toolpusher obligations 队长职责职责 17.2 camp manager obligations 营地经理职责 17.3 mechanical engineer obligations 机械工程师职责 17.4 electric engineer obligations 电气工程师职责 17.5 driller obligations 司钻职责

17.6 assistant driller obligations 副司钻职责 17.7 derrickman obligations 井架工职责 17.8 floorman obligations钻工职责 17.9 roustabout obligations场地工职责 17.10 mudman obligations泥浆工职责 17.11 motorman obligations机工职责 17.12 welder obligations电焊工职责 17.13 cleaner obligations清洁工职责 17.14 laundryman obligations洗衣工职责 17.15 cook obligations厨师职责

17.16 security guard obligations安全保卫人员职责 17.17 radio operator obligations无线电操作员职责 17.18 rig nurse obligation井队医护人员职责 17.19 driver obligations司机职责

17.20 crane operator obligations 吊车司机职责

SECTION ONE – HEALTH SAFETY AND ENVIRONMENT PROGRAMS 第一部分:健康、安全与环境方案 1.0 HSE Meetings HSE 会议

One of the most important parts of any company’s Health Safety and Environment Program should be regular HSE meetings.Safety meeting should include: 对于任何公司的HSE方案而言,定期的HSE会议是非常重要的,安全会议应该包括:

A.Weekly Safety Meeting Report 周安全会议记录 B.Information from equipment manufacturers 设备生产产家提供的情况

C.Information from the well operator 井上操作人员提供的情况 D.Recent company communications 最近公司交流讨论的情况

E.Recent incident investigations, their causes, and corrections 最近的安全事故调查,它们的发生原因和整改措施

F.Safety equipment operating procedures 设备安全操作步骤 G.Employee suggestions 来自员工的建议

H.Job Safety Analysis(JSA)Program 岗位风险识别方案

I.IADC HSE Committee Safety Alerts 国际钻井承包商协会 HSE 协会的安全提示

1.1 Safety Inspections and Logbooks 安全检查与纪录

Regular inspections should be made to determine if the equipment is safe to operate.Although a supervisor or other designated company representative should perform inspections, all employees are responsible to report any unsafe conditions they observe.The rig should be inspected from every viewpoint.Unsafe conditions and acts should be reported to the supervisor.定期检查设备的安全使用情况,虽然监督和其有关人员会检查,但是所有的员工有义务通报他们看到的不安全隐患。全面检查钻机设备,有不安全的情况和操作随时通报监督。

1.2 Job Safety Analysis 岗位风险识别

The Rig Manager(Tool pusher)will have the primary responsibility for training and/or retraining rig crews in the following processes:平台经理(队长)在对井队员工培训和指导上,负有主要责任 1.Job selection 岗位选择 2.Hazard identification 危险识别 3.Safe job procedures 安全作业步骤

4.Documentation on the JSA form 岗位风险识别相关材料

A.All injuries, no matter how minor, should be reported immediately to the supervisor and treated.所有的损伤,无论多轻,都应该及时通报监督并及时治疗。

B.All injuries, which occur during the course of employment, must be reported on the appropriate Incident/Injury form.在本公司就职期间,所有的损伤,都应该在事故和损伤表格中记录。C.The employer should contact the appropriate agencies to ensure that all regulatory reports are completed and submitted.公司有关领导应该及时和有关部门联系,确保完成定期的报告,并及时送达。1.3 Incident Investigation 事故调查

Incident investigations should be conducted ASAP after the incident occurs.Facts are clearer, more details remembered, and the conditions are nearest those at the time of the incident.The incident investigation may be conducted in the following manner: 事故一旦发生,就必须尽快分析调查。事实尽量清晰,细节尽量详实。与事故相关的各种情况都要分析到。事故分析应该按下面的方式进行:

A.Interview the worker(s)who had the incident, medical considerations permitting.如果医疗条件允许,应该与事故有关人员见面。

B.Interview all the witnesses and other personnel who may have been involved in the incident.与事故目击者和其他有关人员见面。

C.E.Review the JSA for the task involved in the incident(if applicable).重新论证酿成事故岗位,回顾其岗位风险识别(如果可行的话)

D.F.Review maintenance or manufacturers records for the equipment involved(if applicable).重新检查相关设备的维护纪录或者制造纪录(如果可行的话)E.G.Determine the facts, based on all information gathered.根据收集到的情况,确定事实真相

F.H.Document names and addresses of all witnesses, personnel who did not witness the incident, 纪录目击者的姓名和地址,记录那些没有目击事故的人员

G.but may have knowledge that is pertinent to the investigation, and other personnel on location 这些人员与事故的调查也相关,以及现场的其他人员。H.who did not witness the incident.谁还没有目击(看到)事故

I.Determine how the incident happened.确定事故是如何发生的

J.Document the facts of the investigation.纪录分析调查的细节与事实

K.Develop an action plan to prevent the incident from occurring again, 拿出防止类似事故再发生的行动方案

L.Share the results of the investigation and action plan with other personnel in the company so that they are aware of what happened and can take efforts to avoid a similar situation on their rig.将调查结果和措施方案通报公司其他人员,这样他们对事故也能认识,并且采取措施避免类似事故的发生。

1.4 Visitor / Service Personnel Orientation 外来人员指导培训

Visitors and service personnel who are new to the location should be met upon arrival, given an orientation immediately and be assigned muster stations.外来人员和外来服务人员初次来到井场,必须立即对这些人员进行指导和培训。

SECTION TWO – GENERAL GUIDELINES AND HEALTH CONTROL 第二部分 一般要指导和健康预防

2.0 General Housekeeping 物品摆放一般要求

A.Good housekeeping, cleanliness and order are first steps in safety.工作现场房间干净,整齐有序是安全的第一步。

B.All walkways and steps, rig floors etc., should be kept clear of tools, trash, boards, barrels, hoses and slipping hazards such as oil or grease.所有的步行通道,梯子和钻台等活动区域,不能有各种工具、废物、挡板、桶、软管以及容易让人滑倒的油脂等。

C Each work area should have a storage space or locker for tools and equipment used in that area.Rig floors should have a tool board or locker for hand tools and good storage racks for subs and other rig floor equipment.每一个工作区域,都应该有储存或者固定该地点常用工具的地方。钻台上应该有存放和固定各种工具、各种接头和其它常用设备的地点。

D.To protect slings, shackles, pipe hooks, etc., each rig should have a storage locker.Boards used on pipe or casing racks should be neatly stored.为了保管各种绳索、钩环、管子钩等,每一台钻机都应该配备专用存放箱,管子上使用的各种挡板,套管上使用的托架等必须洁净后存放。

E.Workshops should have proper storage areas for tools and equipment.All tools and equipment should be cleaned, inspected for damage, repaired if necessary and stored in the proper place after use.工房内必须有妥当的区域来存放工具和设备。所有的工具和设备应该保持干净,经常检查其破损情况,必要时维修,使用后放在适当位置。

F.Trash and disposal containers should be placed in different areas around the rig.垃圾箱和废物箱必须安置在钻机周围不同的区域。

G.Combustible materials such as oil, oil filters or oily rags should be kept in cans designed specifically for such materials.易燃材料比如:油品、滤油纸、带油抹布必须放置在专用容器内。H Guardrails or other suitable means should properly guard all temporary or permanent openings in the floor.钻台上的孔洞必须有护栏或其它设施来临时或者永久遮挡。

I.Drilling fluid should be cleaned off of the rig floor after making a connection and regularly during trips, or as quickly as the operation allows.在起下钻和接单根作业完毕后,钻台上的泥浆要及时清理干净。

J Masts/derricks should be kept free of loose items such as tools, shackles, etc.Any item used above a work area should be secured to prevent it from falling.10 井架上避免摆放没有固定的各种工具、链钳等,工作区域上方的任何物品,必须安全固定,避免坠落。

K Spills from sack or bulk chemicals should be cleaned up as soon as possible.袋装或者散装各种处理剂一旦散漏,必须立即清理。

L All rig waste should be disposed of in a proper manner.Non-deteriorating waste such as plastic bags, wrappers, wood, etc., may require special disposal procedures.所有的井场废物废料都必须妥善处理,一些不容易处理的材料塑料袋、包装袋、废木料等需要经过专门的处理。

M.Mix only enough paint to accomplish the task at hand.当需要使用油漆时,要估算好需要的量。

N Dispose of paint and thinner properly.Do not mix with other waste.妥善处理油漆和稀释剂,不要与其废料混合。

O Scrap metal should be kept separate from all other waste(hot metal could cause a fire if mixed with other waste).废金属料应该与其它废料分开(因为与其它废料混合容易引发火灾)。2.1 Sanitation 卫生

A.Galley personnel(personnel preparing food)should wear clean clothes and other proper attire, including shoes.A hat or hair net should be worn at all times by galley personnel while preparing meals.厨房工作人员(准备食品人员)应该服装干净,穿着得体,包括鞋。在准备食品时,厨房工作人员应该带帽子或者将头发罩住。

B.Galley personnel should keep all abrasions or cuts covered with a clean dressing.厨房工作人员必须将清洗或者切过的食品用干净物品覆盖。

C.Hand cleanliness is essential for galley personnel.Keep fingernails trimmed and hands clean.厨房工作人员必须注意手上卫生,经常修理手指甲,保持手干净。D.Galley personnel should be in good health.厨房工作人员必须身体健康。

E.Smoking and use of tobacco should be allowed only in designated areas.在指定区域吸烟。

F.Leftover food should be covered, dated and properly stored at the appropriate 11 temperature.剩下的食品必须遮盖,注明日期,在适宜的温度下存放。G.Careful attention should be made to the expiration date.注意食品的有效期。

H.Shelves and racks should be used to store food with stored items rotated so that the oldest is used first.存放食品的货架,在摆放食品时,要做到存放久的食品先食用。I.Insects and vermin should be controlled and kept out of food area.食品区域不能有各种害虫和寄生虫。

J.The dining area should be cleaned after each meal.每顿饭后,就餐区域应清理干净

L.The galley should be cleaned on a continual basis.Floors should be disinfected frequently.厨房要随时保持干净,地面要经常清洗消毒。L.Dishes should be sanitized before re-use.盘子下次使用前要消毒。

M.Toilet facilities should be kept clean and sanitized.卫生间设施保持干净,并消毒。

N.All potable and non-potable water should be labeled.饮用水和非饮用水要注明。

O.Dirty towels and clothes should be laundered after each use.每次使用后的脏毛巾和桌布都应该清洗。

P.Garbage and waste should be segregated for proper disposal of after each meal.每顿饭以后,各种垃圾和废物要做到分类收集处理。

Q.Changing rooms should be kept clean and orderly.Work clothes should be properly stored.更衣间应该保持干净、整齐。工作服妥善存放。R.Beds should be made daily.每天要整理床铺。

S.Personnel should not lie on beds in dirty work clothes and boots.工作人员不允许穿着脏的工作服和靴子躺在床上。2.2 Personal Hygiene 个人卫生 A.Personnel should bathe daily and start each day with a clean change of clothes.工作人员必须每天洗澡,穿戴干净。

B.Personnel should have an extra set of clean clothing at the rig to change into should their work clothes get contaminated with oil, diesel or other material that could cause skin irritation.工作人员还应该在井场多预备一套衣服,衣服一旦被油、柴油和其它物品污染,及时更换,避免伤害皮肤。

C.Consideration should be given to the prevention and spread of colds, influenza and/or other infectious diseases.注意及时预防感冒、流感和其它疾病的传染。

D.When air breathing apparatus, dust or organic vapor respirators are required, facial hair should be removed to facilitate a proper face seal.在使用呼吸用具,灰尘或者有气体呼吸过滤用具时,要将面部头发移开,确保呼吸用具与面部门密封紧密。

E.Hair should be maintained in a manner that does not create a safety hazard.头发不宜过长,避免不必要的危险。

F.Rig personnel should wash hands and face before eating.井队工作人员吃饭前应洗手、洗脸。

G.Using solvents to clean the skin is never a good practice.Workers who use a solvent to clean their hands may develop dermatitis or possibly becoming sensitized to the chemical or solvent.用碱水等来洗手不妥当,经常用碱水来洗手会引发皮肤疾病,或者对化学品和溶剂敏感。

2.3 Drugs 毒品和药品 A.Illegal drugs, intoxicating beverages, firearms, weapons or other contraband should not be allowed on the rig or location.非法毒品、麻醉性饮料、枪炮、武器或者其它禁止携带的物品不允许带到井场和营地。

B.Prescription drugs should be taken in strict accordance with the drug’s label and doctor’s guidance.Personnel who are taking prescription drugs should inform their supervisor.各种处方药品应该按照说明和医生的要求服用。个人开处方药应该向他们的责任 13 监督汇报。

C.Any medications brought to the rig should be in the original container in which they were dispensed or purchased.擅自带到井场上的各种药品,要退回原处。2.4 Fitness for Duty 岗位对健康的要求

The physical fitness of employees can affect their job performance and safety at the rig.In addition to being physically fit to carry out the physical requirements of the job, fitness includes being rested, and free of chemicals that could affect the employee’s performance.Employees should arrive at the work site fit for duty.This includes: Rested, Free from drugs or alcohol , Illness ,Injury.员工的身体健康状况会影响到工作和钻井作业现场的安全,保持身体健康,方能胜任工作。健康包括良好的休息,不随意服用药品,因为这些药品有时会影响工作。员工一到达现场,身体就应该胜任工作。它包括:良好的休息,不服用药品和酒类,无病、无伤残。2.5 Smoking 吸烟

A.Smoking areas should be designated and identified on the rig site.指定井场上的吸烟场所,并标注说明。B.Smoking is permitted only in designated areas.只能在指定区域吸烟。

C.Smoking should not be allowed in food preparation areas.在准备饭菜区域,不允许吸烟。2.6 Horseplay 打斗、玩耍与开玩笑

A.Horseplay should not be allowed at any time.工作时,任何时候都不允许打斗、玩耍。

B.Wrestling, mock fights, practical jokes, etc., are examples of horseplay.打斗、玩耍包括:摔跤、打斗、各类玩笑等。2.7 Proper Lifting Techniques 拿举重物技巧

A.Avoid manual lifting of heavy or awkward objects.Mechanical advantage or lifting devices should be used or assistance should be requested.避免人工提升笨重的物品,必要时要使用机械或者专用提升设备。B.When lifting an object with another person, coordinate the lift by using good 14 communication.(For example: “One, Two, Three, Lift”)与他人一起提升搬运物品时,要注意配合。(比如喊一、二、三、起!)C.Check for proper footing before lifting or carrying an object.Make sure the area is clear of slip or trip hazards.高举和搬运物品时,要注意脚下,避免绊倒或者各种危险。D.Proper lifting techniques should be followed when lifting any object.举提各种物品时,要按照正确技巧来做。

B.Over-reaching, lifting over shoulder height, or body twisting should be avoided while lifting or moving an object.高举和搬运物品时,要免远距离取拿,举过肩部,身体扭曲等不良行动 F.Carrying objects up or down stairs or steps with two hands should be avoided.避免用双手搬运重物上下梯子。

2.8 Naturally Occurring Radioactive Material(NORM)遭遇天然放射物质 Radiation is a natural component in our environment.There are two natural radiation sources: Cosmic rays external to the earth, and radiation from naturally occurring radioactive materials(NORM)found in the earth’s crust.The following are precautions all company employees, contractors, and visitors should take: 放射物质是自然界的产物。一般有两种放射源。从宇宙到地球的放射,来自地壳的天然放射物质。所有公司员工、承包商和外来人员都要遵守下面的要求。A.Wear proper protective equipment, including respiratory or breathing air apparatus, when entering contaminated vessels and when handling equipment or materials with exposed NORM.在进入放射污染的容器和处理暴露在放射物质下的设备的时候,要穿戴合适的防护设备,包括呼吸设备。

B.Avoid direct skin contact with radioactive scale and solids to the extent reasonably possible.尽可能地避免皮肤与放射场,放射物质接触。

C.Thoroughly wash hands and face immediately following any skin contact with contaminated materials, especially before eating, drinking, smoking or otherwise using tobacco.在与放射物质接触以后,要认真洗手、洗脸。尤其是在吃饭、喝水和吸烟之前。D.Keep the number of personnel in the work area to a minimum.将在放射区域工作的人员控制在最少。

E.Any contaminated equipment or vessels that are to be worked on should be isolated, ventilated and left standing idle for 4 hours, before work commences.任何受过放射污染的设备在重新使用以前,必须隔离、通风,闲置4小时以上。G.Handle contaminated equipment and pipe in accordance with approved waste and surplus equipment disposal, and/or storage procedures.处理受到放射污染的设备可以参照报废设备的处理程序进行。H.Confined Space procedures should also be followed.可以参照危险禁区的处理程序。

2.9 Heat Stress and Heat Related Conditions 受热和高温环境

Heat stress is a serious issue in industrial work environments.When poorly ventilated clothing is worn in high heat and humidity, heat stress can become a danger.The keys to preventing heat stress are understanding why it occurs, altering the work environment, providing fluids, and providing appropriate protective clothing.If someone shows symptoms of heat stress, it is important to take the individual to a cool, shaded area and provide plenty of drinking water.Seek medical attention immediately.受热是从事工业作业常见的严重问题。如果衣服透风性差,遭遇高热高湿度,就很容易受热。找到原因,就知道如何避免。适当更换工作地点,保证通风,提供必要的防护服装。如果有人受热,马上转移到阴凉的地方,提供足够的水,必要时及时治疗。

Avoiding Heat Stress 如何避免受热

1.Drink plenty of fluids each day.每天喝足够水。

2.Stay physically fit.A higher degree of physical fitness can increase heat tolerance.操持身体健康,身体越健康,抗热能力越强。3.Take frequent breaks to a cooler location.经常在凉快地方休息一下。

4.Acclimatize yourself to the work environment.逐步适应工作环境。

5.When performing strenuous work on hot days, the buddy system should be used.当在炎热的天气条件下,从事繁重的工作,要有紧急救护措施。

6.Watch your health.Some medications and medical conditions such as hypertension 16 can worsen the effects of heat stress.注意你自己的身体状况,有时一些药品和过渡紧张会加剧受热。7.Avoid use of alcohol or drugs.不喝烈性酒或者不使用药品

8.Wear clothing that offers appropriate protection from the environment.穿戴合适的服装。

SECTION THREE – EQUIPMENT SAFETY 第三部分:设备安全

3.0 Electrical Equipment 电气设备

A.The breaker switch for any electric equipment should be locked and/or tagged out and tested to ensure no current is present at the equipment to be worked on before conducting any repairs.在对设备维修之前,要先断开电器开关,测试确保没有电流,方可维修。B Splicing or cutting of electrical wire by unauthorized personnel should not be permitted.非专业人员不允许善自拼接、切割电线。

C.A fuse puller should be used to remove and replace defective fuses.使用专业工具来更换失效的保险丝。

D.Plugs and cords should be protected from being damaged.避免损坏各种插座、插头。

E All electrical wall outlets, hand tools, extension cords, etc.should be provided with proper grounds or removed from operation.所有的墙上插座、手动工具、外接电线等必须有地线,作业时要搬走。F Power hand tool safety devices should not be modified.(For example: Applying tape to keep the power switch on a hand grinder engaged.)电动手用工具的开关要加强保护(比如用胶带密封,防止碎屑进入)。G.Electrical power tools should not be used in gaseous or explosive atmospheres,.电动工具不能在天然气环境和容易爆炸的环境中使用。

H.All electrical tools should be turned off before connecting to or disconnecting from the power supply.所有的电动工具在连通或者断开电源时,工具上的开关都必须放在断开位置。I.Electrical devices should not be operated when water hazards are present.当有水蒸汽环境时,不能操作电器设备。

J.Water or any substance containing water should not be used to extinguish an electrical fire.不能用水或者含水的物质来扑灭由于电引起的火灾。

K.All extension cords should be checked regularly and kept in good condition.所有的外部电线接头,必须定期检查,并处于良好的状态。

L.Cords should be disconnected from the power source before coiling for storage.在把电线盘起来存放之前,一定要先断开电源。

M.All guards on electrical equipment should be kept in place and in good repair.所有电器上的保护设施都必须完好无损。

N.Water, dirt, oil or dust should not be allowed to accumulate around electrical equipment.电器设备周围不能有水、油、灰尘等杂物。

O.All overhead lights should be equipped with safety fasteners.所有头顶上方的照明灯都必须安全固定。N.Explosion-proof lighting fixtures should be used where required by the classification of the area.依照工作场合,照明灯必要时要采用防爆固定装置。

Q.SCR units, rig and auxiliary generator plants should be grounded.可控硅装置,钻机上使用电器和其它辅助发电设备必须接地线。

R.Before main breaker switches are thrown “in” or “out”, the equipment controlled by these breakers should be turned off or on by the equipment control switch.在将主刹车的开关位于“合”、“离”位置之前,必须先将那些受刹车系统控制的设备控制开关也分别设定在“合”、“离”位置。

S.Should a circuit breaker kick out(disengage), the reason the breaker kicked out should be determined before the circuit breaker is re-engaged.如果电路保护系统突然跳闸短路,在重新合上之前,必须查明原因。

T.When re-engaging a circuit breaker that has kicked out, always stand to the side and look away from the breaker as it is re-engaged.当电路保护系统跳闸,在合闸的时候要注意身体站侧面,并与电闸保持一定距离。U.Explosion-proof equipment should be returned to its explosion-proof condition when repaired.当对防爆设备进行维修时,必须将防爆设备设定在防爆状态。

V.Non-conductive mats should be placed in front of the switchboards and maintained in a clean condition.在电器控制开关控制箱的前面放置绝缘的各种脚垫,并经常保持垫子干净。W.All high voltage panels should be clearly marked “DANGER – HIGH VOLTAGE.”

所有的高压电路控制箱(板、台),必须用文字清楚表明:“高压,危险!” X.Never assume electrical wiring is harmless.Check the source to ensure it has been disconnected, even if only changing a light bulb.杜绝电线不导电,不危险的想法,即使是更换一个电灯泡,也必须断开电源。Y.Never assume low voltage cannot be dangerous.杜绝低电压不危险的想法。

Z.Personnel rescuing a victim of electrical shock should first switch off the power causing the shock.If this is not possible, attempt to pull the victim away from the live conductor by using a dry stick, a dry rope, or other nonconductive material.在抢救触电人员时,必须先断开引发触电的电源,如果不行,则要使用干燥的木棍,干燥的绳索,或者其它绝缘的材料。

AA.A work permit may be necessary when using electrical power tools in some areas.在某些地方使用电动工具时,必须有相关的许可。

BB.All explosion-proof junction boxes and breaker boxes should be properly sealed with all bolts.所有的防爆设置和电路安全保护装置都必须用螺钉固定、封住。CC.All wires should be properly secured in wire trays.所有的电线都应该固定在线盒(盘)内。

3.1 Control of Hazardous Energy – Lockout / Tag out

危险源的控制— 锁死(安全保险)/ 警示标志

A.All employees should understand that before any employee performs servicing or maintenance on a machine or equipment where the unexpected energizing, start up, or release of stored energy could occur and cause injury, the machine or equipment shall be isolated from the energy source, rendered inoperative and energy source tested to ensure that energy has been released or not present.所有的员工都必须清楚,在含有各种潜在危险源动力设备上从事作业和维护时,19 这些设备会在作业人员不注意的情况下启动,或者释放出储存的能量,造成意外伤害。所以,必须先将这些设备和装置与动力源切断,通过测试等手段证明能量已经被释放掉,或者能量已经不存在。

B.If an energy-isolating device is not capable of being locked out, the employer’s energy control program should use a tag-out system.如果能量断开设施不能够被锁死,则要采取现场警示标志措施。

C.Whenever replacement or major repair, renovation, or modification of a machine or equipment is performed, and whenever new machines or equipment are installed, energy isolating devices for such machines or equipment should be designed to accept a lockout device.当进行设备更换、大修、改装或者修补等作业时;当新设备进行安装时,都要对这些设备采取安全保险措施,而且要求能够实现锁死功能。

D.employees should understand the purpose and function of the energy control program and that the knowledge and skills required for the safe application, usage and removal of the energy controls are acquired by the employees.员工都应该了解各种动力源控制手段的功能和目的,而且要掌握它们安全运用的知识和操作技能。

E.Lockout / Tagout Plans may include the following elements.锁死(安全保险)/ 警示标志 方案包括以下方面的内容.1.All machinery or equipment that is capable of movement should be de-energized or disengaged and locked out during cleaning, servicing, adjusting or setting up operations, whenever required.所有的设备在进行清洁、维护、调试和安装的时候,需要时,都应该能够实现将能源释放,设备能源断开和锁死功能。

2.Where the power disconnecting means for equipment does not also disconnect the electrical control circuit: 断开设备动力的手段并不是指设备的控制电路断开。a.The appropriate electrical enclosures are identified.要对各种的带电的外罩(盒)进行明显标注。

b.Means is provided to assure the control circuit can also be disconnected and locked 20 out.要有措施来保证电路不仅可以被断开,同时还可以被锁死。

3.Locking out main power disconnects for equipment may be required as opposed to only the locking out of specific control circuits.安全锁死不仅仅是锁死特定的控制电路,而是要能够将设备的主动力切断锁死。4.All equipment control valve handles should be provided with a means for locking out.所有设备的控制阀也应该具有锁死功能。

5.Stored energy(mechanical, hydraulic, air, etc.)is required to be released or blocked before equipment is locked out for repairs.在将设备锁死进行维修之前,设备储存的能量(机械能、液压能、气能等)都要释放掉,或者封死。

6.Employees required to work on equipment should be provided with individually keyed personal safety locks.要给在设备上工作的员工提供锁死设备用的单独安全锁。

7.Employees who work on equipment should keep personal control of their key(s)while they have safety locks in use.当设备被锁死后,在设备上工作的员工要管好锁死设备安全锁的钥匙。8.Only the employee exposed to the hazard is to place or remove the safety lock.只有在危险场所工作的那些员工才有权力使用和打开安全锁。

9.Employees should check the safety of the lockout by attempting a startup after making sure no one is exposed.只有在确保危险场地没有员工的时候,才能够通过试启动设备来检查锁死装置的安全性。

10.There should be a means provided to identify any or all employees who are working on locked-out equipment by their locks or accompanying tags.通过识别安全锁或者相关的警示标志,可以知道有员工在锁死的设备上作业。11.There should be a sufficient number of accident prevention signs or tags and safety padlocks provided for any reasonably foreseeable repair emergency.要预备数量足够的预防标志、标牌和安全锁装置,防备在各种可能出现的紧急维修时使用。

12.A log should be kept for equipment that is locked out over a crew change or 21 extended period of time.如果设备锁死时间遇到换班或者更长的时间,则对锁死的设备要有书面记录说明。

3.2 Hand Tools 各种手用工具

Hand tools such as hammers, wrenches, and other hand tools are often underrated as sources of potential danger, but they are the causes of many injuries.These injuries can be serious, including loss of fingers or eyesight.手用工具如榔头、搬手以及其它工具通常被认为具有潜在危险,但是这些工具也经常引发伤害。某些伤害甚至是严重的,如断手指、眼睛伤害。

A.Frequent inspection of all hand tools should be made to ensure that they are in safe operating condition.Hand tools should not be altered or welded on.经常检查各种手用工具,确保它们出于良好的状态,不能对工具随意改装和焊接。B.Driving faces of hammers, chisels, drift pins, bars and similar tools should be inspected to eliminate mushroomed heads, broken faces and other defects.检查各种榔头、凿子、销子、橇杠的工作面,不能出现卷刃、破裂和其它缺陷。C.Driving faces that are mushroomed should be ground smooth.Driving faces that exhibit cracking should be removed from service.出现卷刃的必须重新磨平,出现破裂的不能再使用。

D.Use the right tool for the job.Hammer handles should not be used as pry bars, nor should a wrench be used as a hammer.正确使用各种工具、榔头的手柄不能用作橇杠,不能把搬手当成榔头来用。E.Tools should be returned to their proper storage place after use.工具使用后要妥善保管,便于下次使用。

F.Sharp tools, such as screwdrivers, should not be carried in pockets.口袋里不要装锋利的工具比如:起子(螺丝刀)等

G.When tightening pipe, swab nuts, swab rods, etc., you should not stand or jump on the wrench for additional force.当上紧管子、套筒螺母和套筒螺栓时,不要站在搬手上加力量。

H.Cheaters should be used only if absolutely necessary.Do not use cheaters on chain binders at any time.Secure chain binders with rope or chain once fastened.如果需要使用加长钳把的管子时,不要把管子直接套在钳把上,要使用绳索或者 22 链条固定钳把。

I.Wood handles should be sound and securely wedged or fastened to the tool.Tape should not be used to cover defects such as cracks in wooden handles.工具的木制手柄必须光滑,与工具要楔牢,不要用胶布包缠手柄上的裂缝。J.Tools carried into the derrick should be secured to prevent being dropped.带工具上井架,必须有固定措施,防止坠落。

K.When hand tools are being used overhead, those working or standing below should be notified and the area restricted.In addition, secure the tools with a safety lanyard to prevent them from falling in case the grip is lost.当各种手用工具在使用中过热,要小心周围人员和周边环境,另外,可以用一根绳子系住工具,防止因发热手松,工具飞出伤人。L.Pipe wrenches should not be used to bend, raise or lift pipe.管钳不能用来弯曲、提举管子。

M.When using a hammer wrench, attach a piece of rope, or rubber “O” ring to the handle to apply tension on the wrench to hold it in place.在使用锤钻时,用一段软绳或者橡胶圈包住手柄,这样可以方便拿握。N.When using hand tools around the rotary table or the well bore, be sure to cover the bore hole.当在转盘和井口周围使用各种工具时,要将井口盖住,防止物体落入井内。O.Insulated hand tools should be used when working on or around electrical equipment.在电器设备上,或者周围使用工具时,工具必须绝缘。P.Brass hammers may be necessary in gas-sensitive areas.在一些天然气敏感的区域作业,要使用铜棰。

Q.Electric hand tools should be grounded or double insulated.使用各种电动手用工具要接地线,并且使用双绝缘。

3.3 Drill Pipe / Collar Slips and Elevators 钻杆/ 钻铤卡瓦和吊卡 A.Slips and elevators should not be modified or welded on.卡瓦和吊卡不能修补和焊接。

B.Keys, pins, dies, handles and bodies on all pipe and collar slips should be checked frequently for wear or damage.钻杆和钻铤用卡瓦上的各种销健、板牙、手柄和本体要经常察看其磨损和损害情况。

C.Rig personnel should keep their hands and feet, away from slip handles when rotary or top drive is in motion.当转盘和顶驱在工作时,钻台上的工作人员手和脚要远离卡瓦手柄。D.Slips should be properly positioned out of the way when not in use.当不使用卡瓦时,要正确地移出。

E.Slip handles should be used to raise and lower slips.Handles should be grasped with palm up.Slips should NOT be kicked into the rotary bushing.卡瓦的手柄是用来提升和下放卡瓦,要用手掌抓住卡瓦。不要用脚将卡瓦踢进转盘补芯内。

F.Using proper lifting techniques, at least two employees should pull slips.要正确操作提升卡瓦,至少两个人一起来提卡瓦。

G.Latches, latch springs, hinge pins and elevator shoulders should be inspected periodically and maintained as necessary.These areas should be checked for cracks and deformities.锁紧部分、锁销弹簧、销子和吊卡的台阶等部位要定期检查和维护,要检查有无裂缝和缺陷。

H.The elevator ear locks should be fitted with proper size steel bolts as recommended by the manufacturer.Bolts should be checked often to ensure tightness.吊卡的锁紧耳朵要使用厂家推荐的,大小合适的插销,插销要确保插紧。I The elevators or bails not be grasped in the area of the link eyes.作业中,不能抓吊卡和吊环的联结耳部,以免擦伤。

J The load bearing areas of elevators and links(bails)should be inspected as per company policies and procedures developed in consideration of the manufacturer’s recommendations.根据生产厂家的建议和本公司的制度,要对吊卡的承受载荷部分和联结部分(吊环)进行检查。

3.4 Hoists(Winches / Tuggers)提升设备(各种绞车 / 各种卷扬机)A.Only those personnel, who through experience and training, are determined by the rig supervisor to be competent should be allowed to operate the rig floor hoist(s).只有具有经验,受过培训并且得到监督认可的人员才能够操作钻台上的绞车。B.All hoists should be equipped with a drum guard and line guide.所有的绞车都必须配备刹车鼓护罩和排绳器。

C.The hoist operator should check the hoist mechanism, brake, drum guard, and line guard to ensure proper working order prior to each lift.绞车操作人员在作业前,应该检查绞车结构、刹车系统、刹车鼓罩、钢丝绳罩等部位,确保工作正常。

D.The hoisting line should not be in contact with any derrick member.绞车钢丝绳不能与井架的任何部分接触。

D.Loads lifted by the hoist and wire rope should not exceed the manufacturer’s recommendation.绞车提升的载荷量不能超过绞车生产厂家的规定。F.Rig personnel should stand clear of suspended loads.钻台上的工作人员要躲避远离提升物。

G.The hoist operator should set the drum brake anytime a load is in suspension.The operator should not leave the hoist unattended.绞车操作人员在提升过程中,随时可能刹车,操作人员不应能离开绞车。H.The hoist-operating lever should return to the neutral locked position when the operator releases it.要保证操作人员松开时,刹车操纵杆能够自动返回原位。

I.The hoist should be equipped with an emergency shut-off valve within easy reach of the operator.绞车必须配备紧急停车装置,并且操作人员容易控制它。

J.The hoist operator should raise the load at a slow, steady rate and stay alert to the situation and flagman at all times.绞车操作员提升载荷时要慢速、平稳,要密切关注周围环境和指挥人员。K.Continuous communications should be maintained either through direct sight, through a flagman or via two-way radio.在提升作业中要不断与现场工作人员交流配合,交流可以是直接的,可以通过指挥人员,也可以通过通讯工具。

3.5 Pipe Tongs and Lines 管钳和绳索 A.Snub lines should be installed on makeup and breakout tongs and secured to a structural part of the rig floor or derrick.内钳和外钳上必须系上缓冲保护绳,并将该绳股固定在钻台或者井架上。B.Tong counterbalance and components should be restrained, guarded or located so as to prevent them from falling on or striking crewmembers.Makeshift weights such as tools, pipe protectors, bits, etc.should not be added to the counterbalance weights or tongs.大钳的平衡块要放置妥当,防止它坠落或者伤人。不要把各种工具、护丝、钻头等物品当作临时性的重量平衡块来使用。C.Tong die slots should be properly maintained.大钳的板牙槽部分要经常维护。

D.Tongs should be provided with sharp dies at all times and properly pinned in die slots.Die drives should be used to remove tong dies.随时保证大钳板牙锋利,往板牙槽里装板牙时要正确妥当,要使用专用工具来装板牙。

E.Tongs should be properly secured when not in use.不使用大钳时,要妥善固定。

F.The rotary table should not be used for final making up or initial breaking out of a pipe connection.Two tongs should be used during makeup and breakout.转盘不能用来紧扣和松扣,应该使用大钳完成此操作。

G.When greater-than-normal pull is needed to break a tight joint, all floor crewmen should move away from the rotary, and out of the path of the tongs before torque is applied.(Maximum rating of tongs or lines should not be exceeded.)当使用过大力量来松扣时,钻台上的人员要远离转盘,躲开大钳周围的危险区域,施加的力量不要超过规定最大载荷。

H.Employees should not stand between the two pipe tongs while the driller is making up or breaking out pipe or collars.当司钻在进行钻杆和钻铤的紧扣和松扣操作时,其他人员不要站在大钳之间。I.All bolts/pins used to secure tong jaws should be kept in place, with nuts and secured with cotter pins or safety pins.所有固定大钳巴掌的螺栓/销子都要用螺母、开尾销或者安全销固定就位。

J.The lockout / tagout procedure should be used when working on power tongs.当维护维修动力大钳的时候,要采取安全保险措施(锁死),并且有警示标志。

J.Tongs should be inspected for stress cracks as per manufacturer’s recommended inspection and maintenance programs.Qualified inspectors should carry out tong inspections.要按照生产厂家的要求来检查大钳,防止出现应力裂纹。必需安排合格人员检查大钳。

K.Drawworks Line Pull Level – Line pull should be level with tong to reduce stress on the tong from this operation.Breakout/makeup tong arm should be as close as possible to a 90-degree angle to the line of pull.拉绳要摆平---大钳上的上卸扣拉绳要尽量和大钳对平,以减少操作中大钳的应力。上扣和卸扣时,大钳臂要尽量与拉绳摆成90度。

3.6 Rotary Table Area 转盘区域

A.The rotary table area should be constructed or covered with a non-skid material.转盘附近的区域应该是用防滑材料建造。

B.Hoses, ropes and lines should be clear of the rotary table and adjoining rotating equipment while it is in motion.转盘附近不要放置软管、绳索和钢丝绳等,因为转盘一旦工作,这些东西会被转盘缠住。

C.When not in use, the pipe tongs should be secured away from the rotary table.当不使用大钳的时候,大钳要远离转盘并且固定住。

D.If the rotary table is removed, the pick-up lines should be of sufficient strength and condition, and placed evenly around the block hook to ensure a level lift.吊装转盘时,提升钢丝绳要有足够的强度,往大钩上挂钢丝绳时,要确保水平起吊。

E.Rotary and motion compensator hoses should be equipped with safety lines at both ends.要把水龙带和其它运动的补偿软管(带)的两端用安全绳链固定绑牢。F.Safety lines should be used to secure cementing or fracturing bumper hoses to an immovable object such as pump base or sub base.在进行固井或者井下压裂作业时,要确保缓冲软管与固定设备连接,比如泵底座、井架底座。

G.Hoses should be inspected periodically and maintained to manufacturer’s specifications.要定期检查各种软管与水龙带,并为达到厂家的技术规范。

H.Rotary slip bushings should be locked in the rotary at all times.转盘的卡瓦补芯要始终放在转盘内。

3.7 Equipment Guarding 设备防护

A.All moving machinery that presents a hazard to employees working in its proximity should be adequately guarded.所有运动机械设备,如果对工作人员造成危险,就应该加护罩。B.Any removed guard should be replaced before the machinery is returned to operation.任何挪走的护罩,在设备开动前,必须恢复就位。

C.Lockout and or tag-out procedures should be used before removing guards.在挪动护罩前,要采取安全保护措施,并且有警示标志。D.All piping that could cause burns should be insulated or guarded.所有可能导致起火和燃烧的管子都必须采取绝缘和加罩。

E.All portable tools with exposed moving parts should be equipped with proper guards.所有的可以移动的工具中,如果有运动部分或者运动件,对必须加防护罩。L.If expanded metal is used to fabricate equipment guards, the openings should be of a size(1/2 inch)that will prevent a person’s fingers from going through it.如果用铁皮等软质材料来做设备的护罩,则护罩开口缝隙尺寸不能让人的手指进入通过(1/2英寸)。

3.8 Derricks and Masts 井架(塔形井架与A形井架)

A.Inspections of the derrick or masts should be performed periodically.定期检查井架

B.The pipe racking fingers should be kept straight and properly secured.A safety cable or chain should be attached to each finger.各种管架的横挡要平直、稳固,必要时要使用安全绳(链)将每个横挡固定好。

C.Drill collar tieback ropes should be secured to a derrick or mast member.拉钻铤的绳索必须固定在井架上。

D.As each stand of drill pipe is set in the fingers it should be tied back or secured in the finger.当把每一根钻杆立柱往管架上拉靠后,要将立柱固定好。

E.Personnel should not be in the mast or derrick when pulling or jarring on stuck pipe.当进行解卡作业时,无关的工作人员不要滞留在井架内。

B.The derrick escape device should be visually checked by the derrickman before each trip.在每次进行起下钻操作时,必须用肉眼检查检查井架工的逃生装置。C.Safety lines should be attached to all sheaves hanging in the derrick(i.e.tong, hoist, catline, etc.)These lines should be inspected frequently.各种安全绳索(大钳上的、提升设备上的和猫头绳等),必须装在悬挂于井架上的滑轮中,这些绳索必须经常检查。

D.A full body safety harness and lifeline should be provided and used by each employee who works more than six feet above the drill floor.如果员工在钻台面六英尺以上高空作业,必须穿戴完备,系上保险绳。E.The derrickman should wear a full body harness that is attached to a fall arrest device as well as positioning rope.All derrick safety harnesses should be the full-body type and inspected frequently.A backup should be provided if the one in use becomes defective.井架工作业时,必须穿戴完备,系上保险绳。所有的安全保护措施必须齐备,并且经常检查。同时必须有一套备用。

F.The derrickman should inspect the monkey board before its use.井架工在作业之前,必须检查井架二层台。

K Any time the derrickman plans to connect to the ladder-climber assist/anti-fall device, or do anything other than routine operations, the driller should be notified.如果井架工在井架上安装梯子护栏 / 防止摔落安全设施,或者进行其它非正常的操作,司钻要密切关注,以防意外。

3.9 Pipe Racks and Bins 管子架与储存盒

A.Each layer of tubulars should be secured to avoid movement.管子的每一层都必须固定好,避免移动。B.Pipe racks should be inspected periodically.定期检查管子支架。

C.Pipe racks and bins should be level.管子架和管子盒应该放平。

D.Personnel should not be on the catwalk when tubulars or other equipment is being hoisted to the rig floor.当往钻台上起吊各种管子和其它设备时,员工不要站在坡(猫)道上。3.10 Derrickman’s Escape Device 井架工逃生装置

A.Derrickman’s escape device should be installed during rig up and should be operable when the mast is raised.在安装钻机时,必须安装井架工逃生装置,一旦井架安装完毕,该设施就应该能够使用。

B.The derrickman should perform a visual inspection of the escape device and escape line before each trip in or out of the hole.井架工在进行起下钻作业之前,必须用肉眼检查逃生装置和逃生路线。C.The device should be used only in the event of an emergency.该设施仅在紧急情况下使用。

D.The safety device should be inspected prior to rigging up and periodically 该设施在安装前要检查,并且定期检查。

3.11 Drilling Line, Crown Block and Traveling Block 大绳、天车和游车 A.Derrickmen should never touch the active line while traveling blocks are moving.当游动滑车运动,井架工不要摸活绳。

B.Drilling lines should be visually inspected daily for wear and breaks.每天用肉眼检查钻井大绳磨损和断丝情况。

C.The drilling line should not be allowed to rub against other objects that may cause damage.钻井大绳不允许其它物品摩擦,避免损伤。D.Drilling line is stiff and can flip when being cut.在切割大绳时,钢丝很坚硬,会弹起来伤人。

E.The deadline anchor bolts should be checked periodically to ensure that they are properly torqued.定期检查死绳固定器螺栓,确保其拧紧。

F.All excess drilling line should be spooled up off the ground or deck.所有剩余的钢丝绳要盘起来,不要堆在地上或者台面上。

G.Crown sheaves and traveling block should be inspected and lubricated each day.每天都要检查和润滑天车滑轮和游动滑车。

H.A slip-and cut-program should be followed.Calculate the ton-miles and follow the slip-and-cut program as recommended by the drilling line manufacturer.按照规定程序步骤进行倒大绳作业,按照钢丝绳生产厂家的要求计算吨-英里载荷量。

I.The line guide cable and rollers should be inspected each tour to determine their condition.每个工作班都要排绳器的绳索和滑轮滚子,确保其状态良好。3.12 Drawworks, Brakes, Clutches 绞车、刹车、离合器

A.All rig personnel should be instructed in how to shut down the drawworks and rotary table in the event of an emergency.所有的井队人员都要学会在紧急情况下关掉绞车和转盘。

B.All guards should remain in place at all times and be kept in good condition.Guards should only be removed for maintenance or repair(follow lockout/tagout procedures)and replaced prior to putting back in operation.所有的设备护罩都必须就位完好,只有在进行维护和维修的时候才能取下,应该在作业之前更换各种护罩(按照 锁死(安全保险)/ 警示标志 要求实施)。C.Only designated personnel should operate the drawworks.只有指定人员才能操作绞车。

D.While operating the drawworks, the operator should not be distracted.操作绞车时,操作人员不允许走神,必须专心。

E.The driller should supervise all drawwork repairs.Do not start up other operations until repairs are completed and guards are in place.司钻必须监督所有的绞车维修工作,维修完成,护罩就位后才能重新操作。F.Defective zerk and alemite fittings should be replaced.及时更换各种损坏、实效的联结部件。

G.The brake blocks, linkage, pins, cotter keys, etc.should be checked periodically.定期检查刹车部分、刹车带、各种固定销健等。

H.The crown-o-matic should be visually checked at tour change and function tested at first opportunity.It should be reset and checked after drill line is cut and slipped.每次换班时,要用肉眼检查防碰天车装置,并测试。每次倒完大绳;应该重新调试防碰天车。

3.13 Mud Pumps and Equipment 泥浆泵与设备

A.Caution should be used when working around high-pressure components.在高压设备附近工作要有相应的防范预警措施。

B.Lockout/tagout procedures should be used when repairing or maintaining equipment.当修理和维护设备时,要采取安全保险和警示措施。

C.Mud pumps should have pressure relieving safety(pop off valve)devices.There should not be any valves or other restrictions placed in the pressure release relief line.Shear pins recommended by the manufacturer are the only pins that are to be used in shear pin type pop off valves.Pressure relief device cover should be in place.泥浆泵应该有安全阀(泄压阀),在安全泄压管线上不能有任何阀和障碍。安全阀上的安全销子必须使用厂家推荐的,安全阀的防护盖必须就位完好。D.Liners should not be removed from or seated in a pump by running the pump or by applying hydraulic, pneumatic or gas pressure.不能在泵运行,或者有液体压力、气体压力情况下装卸泥浆泵缸套。E.Guards should be in place and secured while a pump is in operation.当泥浆泵工作时,泥浆泵护罩必须就位固定好

F.Studs and nuts on the fluid end should be maintained in good condition and kept tight.泥浆泵液力端的各种螺栓和螺母必须完好,紧固。

G.Good housekeeping and lighting should be maintained around the mud pumps.泥浆泵附近的泵房设施和照明必须完备良好。

H.Discharge lines coming from the pump should be snubbed off.泥浆泵的排出管线必须平滑。

3.14 Mud Pits and Equipment 泥浆池与设备

A.Mud pits may be considered confined spaces so proper precautions should be taken.32 泥浆罐之间要有合理的间距,以便采取各种防范措施。

B.High-pressure fittings and lines should be properly rated for the expected working pressures.各种承受高压的接头何管线,必需满足工作压力的要求。C.Mud gun unions and connections should be kept tight.各种泥浆搅拌设备的联结部件必须紧密。

D.Only designated employees should be allowed to operate mud guns.泥浆搅拌设备必须由专人来操作。

E.Walkways should be kept clear of tripping hazards.泥浆罐上的通道不能有障碍物。

F.Electrical equipment should be located to prevent contact with fluids.避免电器设备与钻井液接触。

G.Caustic soda should be added to water slowly to avoid splashing and should be mixed using a mixture tank or barrel.往水里加入烧碱的时候,要慢慢加入,避免溅出伤人。要使用搅拌桶或者搅拌罐。

H.When mixing chemicals employees should follow precautions as stated on the manufacturer’s MSDS and warning labels.Chemicals that are not compatible should not be mixed together.在搅拌处理泥浆用的化学品时,操作人员必须按照产品生产厂家安全数据表上的要求或者说明书要求进行,不相容的化学品不能混合。

I.Approved explosion-proof lighting fixtures should be installed on mud pits.泥浆罐上要安装有安全许可的防爆照明设备。

J.The agitator’s power source should be isolated and locked out before entering the mud pits.搅拌设备必须绝缘良好,进入泥浆罐的电线必须有安全保险措施(安全锁)。K.At the mud mixing hopper or mixing location, the following items should be available for the employee’s use:

再混合漏斗和混合作业场地,必须为操作人员提供下列内容: 1.Eye protection.眼部防护用具 2.Face protection.面部防护用具

3.Proper respiratory protection.呼吸道防护用具

4.Rubber gloves and apron.防护橡胶手套和围裙 5.Eyewash station / shower, and 洗眼站和冲洗设施

6.Appropriate caution and/or danger signs.及时的安全提示和危险标记。7.MSDS for chemicals.各种化学品的安全数据表。3.15 High-Pressure Lines and Fittings 高压管汇和配件

A.Employees should not attempt to tighten or loosen unions or other connections under pressure.Never hammer on a pipe or connection that is under pressure.操作人员在有压力的情况下,不要上紧或者松开联结部分,不要用榔头敲打管线或者联结部分。

B.Pressure relief valves should be checked periodically as manufacturer’s recommendation.安全阀必须按照厂家的要求,定期检查。

C.Lines or piping systems that may kick under pressure should be secured.那些在有压力的情况下,容易产生爆裂的管线要妥善固定。

D.Care must be taken to ensure proper halves of hammer type unions are mated together.“1502“ threads in a two inch wing nut will appear to be completely made up to the ”602" threads on the female half but will come apart when the line is pressured up.在使用锤打联结式的尤任连接时,要保证联结紧密,蝶形螺母上的1502型丝口要与对接的602型丝扣完全配合,要保证在管线充压力以后,尤任连接不出现问题。

E.High-pressure lines should be fitted with high-pressure fittings.高压管线要准备承受高压的联接件。

F.All personnel should stand clear of high-pressure lines being used during cementing, acidizing, well testing procedures, etc.在进行固井作业、酸化作业、试井作业时,无关人员要远离高压管线。G.Chicsan sections in high-pressure lines should be watched for leaks.Chicsan connections should be secured with a safety line.密切观察各种高压管汇的旋转部分,防止渗漏。必要时旋转部分用安全绳索固定。

H.Do not stand in front of valves or bull-plugs when they are under pressure.34 在有压力的情况下,不要站在各种高压阀门和高压堵头面前。

I.Snub each end of high-pressure lines.Where possible, high-pressure lines should be snubbed to a structural part and not back to other parts of the high-pressure line.要注意让高压管线有缓冲,如果可能,要尽量让高压管线缓冲地进入其它设施,不要返回到高压管线的其它部分。3.16 Engines 动力设备

A.Positive lockout measures should be provided to ensure that the source of power is not activated during the engine repair, inspection or adjustments.在设备维修、检查或者调整时,采取有效的安全锁死措施来保证设备不能被启动。

B.All exposed revolving parts such as radiator or cooling fans, belts, flexible drives, generators, water pump pulley, shafts, couplings and other moving parts should be provided with adequate guarding to prevent contact or items being caught in moving parts.Guarding removed for maintenance purposes should be replaced as soon as possible.对于一些设备,它们暴露在外运动部件,比如散热器、风扇、皮带、万向轴、发电机、水泵驱动轮、运动轴、联轴器等,要有相应的防护措施,避免与运动件接触。各种护罩在打开后,必须尽快恢复就位。

C.Spark arresting devices should be installed in engine exhaust systems.在动力设备的排出口上要安装火焰火花阻挡装置。

D.Engines should be equipped with safety alarms and/or automatic shutdown controls to be activated during emergencies or operational difficulties such as overheating, low oil pressure and over speeding.动力设备应该配备有安全报警装置/或者是紧急情况下或者人工操作困难情况下的自动关闭装置。这些情况如:过热、油压过低、速度过高等。

E.Exhaust manifolds and piping should be constructed, installed and maintained to prevent exhaust gases from leaking between the engine and the discharge line.废气排出管汇和管线维护良好,避免废气从动力设备与排出管线之间泄漏。F.Areas below engine skids and beneath the sub base should be kept clear of drained motor oil and debris.动力设备底座下面的区域应该保持干净,没有各种污油和杂物。G.“Caution High Noise Area” signs should be posted and hearing protection

available in the engine area.Personnel working in high noise areas should wear adequate hearing protection.要放置“高噪声区域”的标志,要提供听力保护用具,工作在高噪声区域的人员要戴听力保护用具。

3.17 Air-Operated Equipment 气动气控设备

A.Air tanks should be drained frequently to prevent accumulation of moisture.各种气灌和气瓶要经常清理排水,防止积水过多。

B.A valve should not be installed between the tank/compressor and the pressure relief valve.在气罐和空气压缩机、安全阀之间不要安装其它阀。

B.Compressed air used for cleaning purposes should be regulated to limit pressure.用于清洗目的压缩空气,要限制压力值,避免过大。

C.Each air line should be secured to prevent it from coming loose at the connections.每一条气管线,必须固定良好,防止在联结部位松动。3.18 Blowout Prevention Equipment 防喷器设备

A.Pick-up lines, eyes and shackles should be inspected for strength and condition before lifting a blowout preventer or the entire stack.在吊装防喷器和整个防喷器组之前,要检查吊装绳索、吊装扣眼和各种联接件的强度和完好情况。

B.Check with the manufacturer before using any padeyes on the annular for picking up the annular and other BOP units.Most annular padeyes are designed only for picking up the weight of the annular itself.在要使用环形防喷器上的各种座眼和吊扣来吊装防喷器和其它防喷器组前,要与设备生产厂家一起检查,因为这些座眼和吊扣只能用来吊装设备本身的重量。C.Blowout preventers and components should not be climbed on until they are set on the wellhead flange, the test stump, flange of another blowout preventer unit or in the stowed position.When climbing on BOP stacks, fall protection should be utilized, but not attached to the BOP.在防喷器被安装到井口法兰上、试油设备上、其它防喷器上或者安装就位之前,不要在防喷器上爬上爬下。当需要爬上防喷器时,要采取防摔到措施,并且防摔到设施不能与防喷器联在一起。

D.While hammering up the blowout preventer, bolts and nuts, closed socket hammer wrenches of correct size, as well as sledgehammers of suitable weight and size should

be used for agility and accuracy.当使用工具紧固防喷器、螺栓和螺母时,要选用大小合适的套筒搬手和手用大锤。

E.A rope or rubber “O” ring should be used on the hammer wrench to hold it in place when hammering.必要时,要在套筒搬手上软绳或者橡胶圈防滑。

F.Employees should not be permitted on the blowout preventer when the stack is being pressure-tested.If during pressure testing the BOP stack, it is discovered that repairs are required, all pressure to the stack should be released before repair work is begun.当防喷器组在进行试压时,员工不要站在防喷器附近。如果发现有必要对防喷器进行维修时,必须先将压力释放掉。

G.When nippling down the blowout preventer, all hydraulic lines should be bled to zero pressure before hammering is permitted on the hydraulic unions.在拆卸防喷器时,必须先将液压管线里的压力全部泄掉,压力显示为零。H.Scaffolding and work platforms should be inspected before being utilized for access to BOP stack.为操作、维护防喷器所搭建的脚手架和工作台要定期检查。

I.Choke and Kill lines should be snubbed off at each end and at each connection on long vertical installations.在垂直安装设备上连接的节流管线和压井管线,必须有内控管线妥善缓冲释放。

J.BOP bolts should be long enough to allow for a full nut when fully tightened.防喷器的螺栓必须足够长,便于螺母紧到位。

K.Be sure that the proper ring gasket is used.Ring gaskets should not be reused.使用大小合适的密封圈,密封圈不能重复使用。

3.19 BOP Accumulators, Pulsation and Suction Dampeners

防喷气蓄能器、蓄能器胶囊(空气包)

A.Rig supervisors should ensure that personnel are instructed in the proper use and maintenance of accumulators, pulsation and suction dampeners.监督必须确保有关人员正确地使用和维护防喷气蓄能器、各种蓄能器胶囊(空气 37 包)。

B.Toolpusher should charge accumulators and high-pressure pulsation dampeners.The pre-charge should be checked as per company policies and procedures developed in consideration of manufacturer’s specifications.队长负责给蓄能器和各种蓄能器胶囊(空气包)预充压力操作,预充压力的步骤和压力值大小要按照公司的有关要求和生产厂家的要求来执行。

C.Each control on the BOP accumulator and each BOP remote unit should be clearly marked as to its exact function.防喷器蓄能器和远程控制装置上的每一个控制阀都要注明外部功能。D.After a ram is placed in open or closed position, flag the controls;do not leave controls in neutral position.在防喷器闸板位于打开和关闭位置后,要将控制阀固定住,避免它回到自然位置。F.The blind / shear ram control handles should be protected in a way to prevent against accidental closure.(Accumulator and Drill Floor Remote Control Units)防喷器闸板和剪切闸板的控制手柄要有安全保护措施,防止意外关闭。(蓄能器和防喷器远程控制台也同样如此要求。)

F.Suction and mud pump pulsation dampeners should be charged by qualified personnel as per procedures developed in consideration of manufacturer’s recommendations.吸入端和泥浆泵空气包预充压力要由合格人员来操作,并且按照厂家的要求执行。

3.20 Stabbing Board(套管)扶正对扣台

A.Stabbing board and components should be inspected periodically and prior to use.套管对扣扶正台及相关设备部件,要定期检查,在使用以前还要检查。B.The stabbing board is to be properly installed and safety lines attached as required.对扣台要安装稳当,必要时,要配备安全绳。

C.Stabbing board locking devices should be provided such that: 对扣台的锁紧装置应该按照下面的要求来设置:

1.One locking device operates when the lifting handle is in neutral.当提升操作手柄处于自然位置时,一个锁紧装置作用。2.One locking device operates if the hoisting mechanism fails.当提升操作没有成功,另一个锁紧装置作用。

3.Both devices are independent of each other.两个锁紧装置是相互独立的。3.21 Handling Tubulars 操作各种管子

A.When stabbing tubulars, personnel are to keep their hands and fingers from between the pin and box of the two joints of tubulars.在进行管子对扣作业时,操作人员不要将手和手指放在接头公扣和母扣之间。B.Joints of drill pipe that are to be added to or removed from the drill string should not be allowed to remain in the mousehole while hoisting or lowering pipe during a trip.在进行起下钻作业时,不要把将下入或者起出的钻杆放在小鼠洞内。C.Each stand of drill pipe being hoisted from the rig floor should be held back as the pipe is lifted so it will not swing freely across the rig floor.起钻时,起出的立根要扶着就位,不要让它在钻台上自由晃动。

D As the person tailing the pipe gives the stand to the stabber, each should keep their hands from between the tongs and pipe.当操作人员拖着管子对扣的时候,不要把手放在大钳和管子之间。

E.The driller’s view of the drill pipe in the rotary table should not be obstructed at any time.在任何时候不要阻挡司钻对转盘内钻杆的视线。

F.When setting pipe back, it should be racked by pushing against the outer face of the pipe.Do not get fingers caught in between pipes(collars).Feet should be kept away from beneath the pipe as it is set down.当推动钻杆进入钻杆盒内时,要推钻杆向外的一侧,不要把手放在管子之间,管子下放就位时,脚下要躲开。

G.Feet should not be placed beneath the pipe when rabbiting drill pipe or tubing.Never put feet directly under pipe, especially when using YT type elevators.当通钻杆或者其它管子时,脚不要放在管子下面。尤其在使用YT型吊卡时,不要把脚放在管子下面。

H.When rabbiting tubulars, crewmen should face away from the pipe rack to avoid possible eye injury, even though eye protection is being worn during this operation.尽管在进行通管作业时,操作人员戴有护目器具,但是,还要注意与管架保持距离,避免伤害眼睛。

I.Feet, knees and hands should not be placed on the underside of a drill collar clamp while the clamp is being tightened onto a drill collar in the rotary table.当用钻链安全卡瓦对转盘内的钻铤紧扣时,脚、膝盖和手不要放在卡瓦的下面。J.A drill collar clamp secured to a drill collar should be removed prior to hoisting the collar so as not be hoisted overhead height into the derrick.在起吊钻铤之前,要将钻铤用安全卡瓦拿开,起吊钻铤高度不要超过头顶。K.When setting the drill bit into a bit breaker, hands and feet should not be placed on the bit breaker while the bit and collar are guided into the bit breaker opening.Feet should not be used to adjust the lock on the bit breaker.当把钻头和钻铤往钻头盒里引导时,手和脚不要往上放,不要用脚来调整钻头盒上的固定装置。

L.Stabilizers, wall scrapers or pup joints being added into the drill string should be set on the rotary table unsupported by a hoist line.通过转盘往钻具上安装扶正器、井眼刮泥器和各种短节,不使用提升机械钢丝绳。M.Tools added or removed from the drill string should be handled with a hoist line.Tools should not be thrown or allowed to fall onto the rig floor, but laid down with a hoist line.往钻具上装卸各种井下工具的时候,要用提升机械钢丝绳吊装和下放到钻台上,不允许往钻台上扔甩。

N.Formation mud should be scraped off the drill collars or stabilizer before it is hoisted into derrick.要及时将钻铤和扶正器上的泥浆刮掉。

O.Employees should not peer into the bell nipple or through the rotary table when the BOP is operated.In addition, the supervisor should make sure that everyone is well away from the rotary table when the blind rams are operated.当操作防喷器的时候,人员不要从转盘去探头看防喷器顶部的钟形导向短节(导管,又称喇叭口),当操作防喷器闸板的时候,监督要确保人员远离转盘。P.Casing equipment should not be rigged up until the drill pipe has been completely hoisted out of the wellbore.钻杆全部从井眼内全部起出后,才可以安装下套管设备。

Q.The casing-tong safety door should not be removed so that hands and limbs will be protected from the tong’s drive works.40 不要移走套管钳的安全口,这样可以保护手和身体。

R.A work scaffolding or platform should be constructed around the casing spider to prevent overstretching or becoming off balance in order to reach the equipment.在套管顶部位置搭建一个工作台,防止操作人员为了勾套管失去平衡跌落。S.Hands should not be placed on top of the casing collar joint protruding from the casing slips when another joint of casing is being stabbed.Hands should be kept on the outside of the casing at all times.当套管接头对扣时,手不要放在从套管卡瓦伸出来的套管上方,手随时都要放在套管的外面。

T.When lowering the casing elevators over a joint of casing in the derrick, the driller should be aware of the derrick stabber’s hands to prevent catching them between the elevators and the joint of casing.当下放套管吊卡到套管单根的时候,司钻要小心不要把对扣人员的手夹在吊卡和套管接头之间。

U.Single joint casing pick-up elevators of the correct size should be used and should have a safety pin attached by chain.使用正确尺寸的套管吊卡,用保险链条将吊卡安全销固定好。

V.When removing cores from a core barrel on the drill floor, employees should not place their hands or feet under the core barrel opening.当把岩芯从岩芯筒内取出时,操作人员的手和脚不要放在取芯筒的开口下面。SECTION FOUR – FIRE PREVENTION, FIRE FIGHTING AND FIRE CONTROL

第四部分:火灾预防、灭火和控制 4.0 Fire Prevention 火灾预防

A.Smoking should only be allowed in the designated areas.These areas should be established after a review of the rig or location(100 feet from well bore when possible.)Signs printed in English and the predominant local language should be present in these areas.All employees and visitors should observe “No-Smoking” rules.只能在指定场所吸烟,对井场考察后,专门划定吸烟场所(如果可能,在离井口100英尺以外),用英语和当地主要语言指示说明,所有的员工都要遵守不随意吸烟的规定。

B.Welding or burning should not be done outside the designed welding area without a hot work permit.All hot work, including welding, should cease in the event that hazardous conditions develop.没有特殊允许,不要在指定区域以外进行电焊或者见火作业。因为电焊之类的见火作业,会引发危险事故。

C.A fire watch with a fire extinguisher should be present during welding and cutting operations that are done outside the designated welding area.在指定区域以外进行电焊、切割等操作时,防火员要在现场,准备好灭火器。D.Oil, diesel or petrochemicals that can ignite should be prevented from collecting beneath engine skids, in cellars or in other areas.在动力设备底座下、库房和其它重要区域,不要集中存放各种易燃易爆的油品、石油化学品等。

E.Explosion-proof covers on fixtures should be maintained in proper working order.各种固定的防暴护罩必须完备良好。

E.Refueling operations should include a bonding and grounding system.All piping and connections should be checked to ensure against leakage.加油作业要接地线(防静电),所有的管线和联接件都必须检查确保没有泄漏。G.Electrical circuits should not be overloaded.Vapor-proof lighting with clean gasketted cover-globes and safety lines should be used.各种电路不要过载,防水照明设施要干净,线路要安全可靠。

H.Only approved rig heaters or fans that are appropriate for the hazard classification of the area should be used.No direct or open flame heating devices should be used on or near the rig floor.合格的加热器和风扇只能在符合安全要求的区域使用,在钻台附近不能使用明火加热器装置。

J.Keep supply, storage, and changing rooms clean and in order.Greasy clothing, rags, paper, or any other combustible material should be removed from these areas and cleaned or properly disposed of.Good housekeeping should be enforced.保持材料供应间、存放间和换衣间等场合干净,整齐。管理或处理好各种带有油污的衣服、抹布、纸张或者其它易燃易爆物品,加强房间的有序管理。L.Investigate any unusual odor, especially smoke or gas.警觉和分析任何异味,尤其是烟味和天燃气味。

L.All storage tanks that contain combustible or flammable liquids or gasses should be located so they will not add to a fire on the rig.All tanks should be labeled as to contents and properly grounded.所有装有易燃易爆液体和气体的瓶灌,应该远离钻机设备,对设备不造成危险。注明灌内的材料名称,并且接地线(防止静电)。

M.Material used for cleaning should have a flash point of not less than 100o F(38o C)用于清洁的各种材料的闪电点应该在华氏100度(摄氏38度以上)。N.Burning of trash should not be allowed on the rig or location.Where permitted, approved incinerators should be used.在钻机和井场上,不允许烧垃圾。如果必须烧,要使用焚烧装置。O.Areas affected by the flare should be free of combustibles.Where possible a minimum 100ft safety zone should be established.受火焰影响的区域杜绝任何易爆材料,如果可能,应该建立一个最小 100 英尺的安全区。4.1 Fire Protection 火灾预防

A.Fire protection equipment should be kept in good condition and should not be tampered with.防火设备要齐备良好,不能有任何损坏。

B.The following recommendations are aimed at maintaining the highest possible level of fire emergency preparedness.为了保持高度的戒备状态,下面提供一些建议:

1.Training in the use and care of available fire fighting equipment should be conducted at initial employment and annually thereafter.As a minimum, one different item of fire fighting equipment should be reviewed during each fire drill that is conducted on a periodic basis.新员工要培训防火设备的使用和维护,往后一年一次。作为最低要求,每一件防火设备在演习时,要检查一次。防火演习要定期举行。

2.The supervisor should ensure that the rig has emergency procedures and employees are familiar with their duties.监督要保证钻机设备有紧急抢救预案,每个员工对预案中自己的岗位和职责要熟悉。

3.Fire drills should be conducted in accordance with the stated procedures and should be held periodically with a record of the activity maintained.要按照预先规定的步骤进行防火演习,演习要定期举行,并记录演习情况。

4.All fire fighting equipment should be inspected periodically, tagged, and the conditions of the equipment recorded.Portable fire extinguishers and extinguishing systems should be serviced according to the manufacturer’s recommendation.Once an extinguisher is discharged, it should be replaced and taken out of service immediately until it is re-serviced.所有的防火设备要定期检查,标注检查时间,记录设备的状况。要按照生产厂家的建议来使用便携式灭火器或其它灭火设备。一旦灭火器泄漏,要更换,在修好以前,不要使用。

5.Quick access to fire fighting equipment should be available at all times and materials should not be placed on or in front of the hose stations, water monitors or extinguishers.保证随时能够快捷地拿到各种防火设备,在水龙带、防火水源和灭火器前面,不要堆放物品。

6.Fire blankets should be located in the galley, welding shop and/or other designed areas.在厨房、电焊间和其它指定的地方要放置防火的罩布等用具。7.During inspections, close attention should be paid to the underside of fire extinguishers.Moisture can cause this area to rust and, if left unchecked, the bottom can blow out, causing serious injury.检查防火设备,要特别注意灭火器的底部,潮湿容易使底部生锈,如果不检查,严重时,底部会泄漏,造成严重伤害。

8.Fire extinguishers should be hung up or placed in brackets designed for the extinguisher.灭火器要悬挂或者放置在专用的支架上。4.2 Fire Control 火灾控制

Using a portable fire extinguisher use the P A S S system – it can be a helpful reminder of the correct steps to follow when attempting to extinguish a fire: 遵照PASS操作系统的要求来使用便携式灭火器,这样在灭火的时候,能够保证操作步骤正确:

1.Pull the pin 拔安全销

2.Aim low;point at the base of the fire 低放,对准火焰底部 3.Squeeze the handle 按动手柄

4.Sweep from side to side keeping the extinguisher aimed at the base of the fire.对着火焰根部,从一侧向另一侧扑灭。

SECTION FIVE – WELDING, CUTTING AND COMPRESSED GAS & OXYGEN CYLINDERS

第五部分:焊接、切割和压缩空气 / 氧气瓶

5.0 General Precautions – Welding, Cutting and Other Spark/Flame Producing Operations 一般预防:电焊、气焊切割、其它遭遇火花 / 火焰的作业/

A.All welding, grinding and cutting operations should be prohibited during certain operations, such as when encountering well control problems or testing, unless it can be determined by the operator’s representative or contractor’s representative that such an operation could be carried out safely.Hot Work Program should be followed.在进行某些作业如:井控作业和测试等,要禁止电焊、磨碎(容易起火花)和切割等工作,除非得到甲方或者乙方代表的许可,在这种情况下,要按照有关作业要求来进行。

E.To control or eliminate fire hazards, good housekeeping should be maintained in and around areas of welding, cutting or grinding.为了消除火灾危险,在电焊、磨碎和切割等工作现场附近,要摆放和管理好各种物品。,C.In the event that the work area is located in a confined space, ventilation and other safety systems should be provided to ensure the area is safe.A Confined Space Entry Permit should be issued and include initial and on going atmospheric testing.如果在危险区域内作业,要有通风和其它措施,以确保安全。要履行相关的登记手续,作业前和作业中,要对大气进行安全检测。

F.Welding or burning should not be allowed on any structural member of a rig, mast, well control equipment, tubulars, high-pressure systems or lifting apparatus without management approval.没有特别许可,不允许在下列设备上面进行电焊、燃烧等作业,它们是:钻机设备、井架、井控设备、各种管子、高压系统、提升设备等。

E.Fire prevention equipment should be located in the proximity of the welding and cutting operating area.An employee trained as a Fire Watch should be present and be ready to use the extinguisher if needed.45 在进行电焊、切割作业时,附近要有防火设备,同时工作现场要有一名防火员,随时准备需要时用灭火器扑火。

F.Fumes, gases and dust fumes produced by the electric welding process can be toxic and may require local source extraction.电焊作业中产生的各种烟雾、气体和烟尘具有毒性,需要妥善处理。G.A welding process generates a tremendous amount of heat.A welder may be exposed to a heat stress situation as a result of the process.电焊作业会产生大量的热,电焊工会遭遇受热高温作业。

H.The welding area should always be equipped with a fire blanket and a well-stocked first aid kit.电焊作业现场应该随时配备灭火毯和急救箱等。5.1 Protective Equipment 预防设备

A.When arc welding, the welder should use a shield or helmet that will protect both the eyes and the skin.The proper shade shield should be used based on the particular operation being performed.在进行电弧焊作业时,电焊工要穿戴防护面罩和眼镜来保护皮肤和眼睛。根据特定的作业,配备相应的遮阳光器具。

B.Proper welding gloves, arm coverings, and aprons should be used at all times.Safety footwear should also be worn to protect the feet from contact with heat and sparks.穿戴专用手套、袖套和围裙,穿安全靴,防止热和火花伤脚。

C.Ears should be protected from sparks or slag entering the ear to the degree possible.佩戴耳朵防护用具,预防火花和焊渣进入耳部。

D.Ventilation or proper respiratory protection should be utilized when cutting or welding on metals that might produce harmful fumes.在切割或者焊接金属的时候,会产生有毒烟雾,要注意通风或者配备呼吸保护设施。

5.2 Preparatory – Precautions 事先预防:提示警告

A.The welder should do his best to prevent sparks, flames or hot slag from being blown into or falling upon any combustible material or equipment likely to be ignited or damaged.在作业中,电焊工要尽量避免火化、烟雾和热电焊渣落到易燃易爆材料和设备上,46 引发火灾或者损失。

B.Areas saturated with oil should be washed down and cleaned thoroughly to remove any ignitable substances.A gas test should be made to determine that no combustible vapors are present.在含油的场所,要将油清洗干净,移走易燃易爆材料,检查测试作业现场是否有易燃易爆气体。

C.Cutting or welding should not be conducted on pipelines, containers, tanks, or other vessels which may have contained flammable substances until they have been thoroughly cleaned.不要在装有易燃材料的管线、容器、罐等设施上进行切割或者电焊作业。D.In confined areas where there is a possibility of combustible vapors being present, gas tests should be made before approval is given to begin work.Periodic gas tests should be made during the time the work is in progress.在封闭的环境内作业前,要检查测试是否有易燃易爆气体存在,在作业进行中还有定期检查测试。

E.When cutting or welding, a fire watch should be assigned.在进行切割和电焊作业时,防火员应该在现场。

F.When cutting or welding has to be done on bulkheads or overhead structures, the adjacent spaces should be cleared of combustibles and/or flammables before allowing the work to begin.当在一些复杂结构场合作业时,作业前要将附近的易燃易爆材料和物品清理干净。

G.Whenever Perforating Guns, Jet Cutters, Chemical Cutters, etc., are being armed, welding operations should be suspended and machines turned off until these pieces of equipment are well below the mud line.The wire line operator in charge should notify everyone when it is safe to continue work.The same procedure should be followed when the equipment is pulled out of the hole.当使用长电焊枪、喷射聚能切割枪、化学切割枪等特殊电焊作业设备的时候,要采用悬空式的电焊作业手段,要先关掉各种电焊设备,等把电焊设备摆放在泥浆管线的下方以后,方可开始作业。有关人员要及时通报给每个人什么时候作业才安全。当各种井下工具从井内起出以后,进行此类电焊作业时,也要按此要求来执行。

5.3 Specific Precautions – Arc Welding 特殊提示:电弧焊

A.All rig personnel should be advised not to watch the arc, or the reflections off the wall as this can also cause eye burns.In order to prevent eye injuries, the welder should give the workers nearby a warning and time to protect their eyes before striking an arc.提醒所有的人员不要看电焊弧光,以及弧光从墙上反射回来的光线,避免伤害眼睛。为了保护眼睛,电焊工在作业前,要提醒周围的人员,并给他们留出准备防护的时间。

B.All work to be arc welded should be adequately grounded.The earth return lead should be hooked up between the electric welding plant and the point of welding.It should not be permitted to use any part of the rig structure as a return lead.所有的焊接件都要接好地线,在电焊设备和焊点之间挂好地线导线。C.The rod should not be left in the electrode holder when laid down.The stub ends should be placed in a suitable container and not on the floor.不使用电焊枪的时候,电焊条不要留在电焊枪上,电焊条残余要放入专门的箱内,不允许扔在地上。

D.If an electrode holder becomes too hot to be used, an extra holder should be provided so that one can cool while the other is in use.当电焊枪的头部过热,要换一把电焊枪,待过热的电焊枪冷却后再使用。E.The welder should keep welding cables dry and free of grease and oil to prevent premature breakdown of the insulation.电焊工要要保持电焊设备电线干燥,避免遭受油污,使电线绝缘部分过早老化。F.The welding machine should be turned off or leads disconnected from the welding machine when the equipment is not in use.当不使用电焊设备的时候,关掉电焊机,断开导线。5.4 Specific Precautions – Gas Welding and Burning 特殊提示:气焊与燃烧

A.When opening valves on fuel gas cylinders, the fuel gas cylinders should be opened one quarter turn only.The oxygen cylinder valve should be fully open.A valve wrench should be kept in close proximity while using these cylinders.打开天燃气瓶的时候,只拧开四分之一圈。打开氧气瓶的时候,要全部打开。气 48 瓶附近要随时备有搬手工具。

B.In order to prevent eye injuries, welders should give workers nearby a warning and time to protect their eyes.未了避免伤害眼睛,电焊工在作业前要提醒附近的人员,给他们留出准备防护的时间。

C.When discontinuing gas welding or cutting for a short time, close the oxygen and acetylene cylinder valves, bleed the line and close the torch valve.When welding or cutting is to be stopped for a longer period, you should proceed as follows: 当断断续续地进行电焊和切割作业的时候,要注意关好氧气和乙炔气瓶阀门,放空软管线管和焊枪。如果长时间不作业,应该采取以下步骤: 1.Close oxygen and acetylene cylinder valves.关闭氧气和乙炔气瓶阀门。

2.Open torch valves to release all gas pressure from hoses and regulators.打开焊枪的阀门,将所有的压力气体从软管和调节阀中释放。3.Close torch valves and release regulator pressure adjusting screws.关闭焊枪阀门,松开调节阀压力调节螺丝。

E.If welding over a drip pan, the drain line to the sump should be plugged.如果是在漏盘(斗)上进行焊接作业,通向排泄池的管线要堵上。

F.Oxygen and acetylene valve connections should be kept clean.Do not use oil on oxygen valves or hose connections.氧气瓶和乙炔气瓶的阀门联结部分要保持干净,不要在氧气阀门或者软管联结部分抹油。

F.To prevent flash backs, cylinders should have an anti-reverse flow-check valve(flame arrester)located between the regulator and hose.未了防止闪火回流,在调节器和软管之间要安装防止回流的单项阀(挡火阀)。5.5 Compressed Gas and Oxygen Cylinders – Storage 压缩空气瓶和氧气瓶:存放 A.Cylinders should be properly secured in an upright position with protective caps in place at all times, except when the cylinder is in use.在不使用的时候,各种气瓶必须垂直安全摆放,装上防护罩。B.Stored Oxygen cylinders should be separated from fuel gas cylinders or combustible materials a minimum distance of 20 feet(6 m)or by a non-combustible barrier at least five feet high.49 备用的氧气瓶必须与各种天燃气瓶或者易燃易爆材料分开,最少保持20英尺(6米距离),或者与非燃容器保持至少5英尺空间距离。

C.Oxygen and fuel gas cylinders should be protected from direct sunlight and excessive heat.氧气瓶和天燃气瓶要避免阳光直接照射和过热。

D.Defective cylinders should be labeled and sent back on the next available transportation.有问题的气瓶要标明,下次运输时送回。

E.Cylinders should be stored so they do not stand or lie in water.不要将气瓶直立或者平躺在水中。

F.Cylinders in storage should have the protective caps placed over the valves, if so equipped.如果有保护帽,存放的气瓶在阀门上要装保护帽,5.6 Cylinder Handling 气瓶搬运与安放

A.Cylinders should be labeled as to their contents.If in doubt as to the contents, test the gas.要标注气瓶内气体的名称,如果有疑问,一定要检测一下。

B.Cylinders should be handled with care.Do not roll cylinders on their side.They should not be handled roughly, dropped, knocked around or used as rollers or supports.要搬运气瓶要小心,不允许放倒在地上滚动,不允许野蛮搬运、摔扔、敲打或者把气瓶当作滚动和支撑用工具。

C.Protective caps should always be in place on both full and empty cylinders while they are being moved, transported or stored.在搬运、运输和存放过程中,无论气瓶有气还是空瓶,阀门保护帽都要戴上。G.A special rack should be built for the purpose of transporting and storing oxygen and acetylene cylinders.在运输和存放氧气瓶和乙炔气瓶时,要配备专用架子。

G.Empty cylinders should have the valve closed, valve protection cap replaced, marked empty and returned to the vendor.空气瓶要将阀门关好,更换阀门保护帽,标注清楚然后送回。

F.Oil and grease should never be used to lubricate the threads on the cylinders or caps.不要用油或者机油来润滑气瓶的丝扣或者保护帽。

2.色谱术语中英对照 篇二

2、气液色谱法(GLC)—gas liquid chromatography 将固定液涂在载体上作为固定相的气相色谱法。

3、气固色谱法(GSC)—gas solid chromatography 用固体(一般指吸附剂)作固定相的气相色谱法。

4、程序升温气相色谱法—programmed temperature gas chromatography 色谱柱按照预定的程序连续地或分阶段地进升温的气相色谱法。

5、反应气相色谱法—reaction gas chromatography 试样以过色谱前、后的反应区进行化学反应的气相色谱法。

6、裂解气相色谱法—pyrolysis gas chromatography 试样经过高温、激光、电弧等途径,裂解为较小分子后进入色谱柱的气相色谱法。

7、顶空报相色谱法—haed(应为head-编者注)space gas chromatography d在密闭的容器中与液体(或)固体)试样处于势力学平衡(应为热力学平衡-编者注)状态的气相组分,是间接测定试样中挥发性组分的一种方法。

8、毛细管气相色谱法—capillary gas chromatography 使用具有高分离效能的毛细管柱的气相色谱法。

9、多维气相色谱法—multidimensional gas chromatography 将两个或多个色谱柱组合,通过切换,可进行正吹、反吹或切割等的气相色谱法。

10、制备气相色谱法—preparative gas chromatography 用能处理较大量试样的色谱系统,进行分离、切割和收集组分,以提纯化全物的气相色谱法。

11、色谱柱:chromatographic column内有固定相用以分离混合组分的柱管。

12、填充柱:packed cklumn(应为column-编者注)填充了固定相的色谱柱。

13、微填充柱:micro-packed column填充了微粒固定相的内径一般为0.5-1mm的色谱柱。

14、毛细管柱:capillary column 内径一般为0.1—0.5mm的色谱柱。

15、空心柱:open tubular column 内壁上有固定相的开口毛细管柱。

16、涂壁空心柱(WCOT):wall –coated open tubular column 内壁上直接涂渍固定液的空心柱。

17、多孔层空心柱(PLOT):porus –layer open tubular column 内壁上有多层孔的固定相的空心柱。

18、涂载体空心柱(SCOT):support –coated open tubular column 内壁上沉积载体后涂渍固定液的空心柱。

19、填充毛细管柱:packed capillary column 将载体或吸附剂疏松地装入玻璃管中,然后拉制成内径一般为0.25—0.5mm的毛细管柱。

20、分流器:splitter 按一定比例将气流分成两部分的部件。

21、进样器:sample injector 能定量和瞬间地将度样注入色谱系统的器件。通常指进样阀或注射器。

22、汽化室:vaporizer 使试样瞬间汽化并预热载气的部件。

23、检测器:detector 能检测色谱柱流出组分及其量的变化的器件。

24、浓度敏感型检测器:concnetration sensitive detector 响应值取决于组分浓度的检测器。

25、质量敏感型检测器:mass(flow rate)sensotive detector.响应值取决于组分质量流量的检测器。

26、积分型检测器:integral detector 响应值取决于组分累积量的检测器。

27、微分型检测器:differential detector 响应值取决于组分瞬时量的检测器。

28、热导检测器(TCD):thermal conductivity detector.当载气和色谱柱流出物通过热敏元件时,由于两者的热导系数有同,使阻值发生差异而产生电信号的器件。

29、火焰离子化检测器(FID):flame ionization detector.有机物在氢火焰中燃烧时生成的离子,在电场作用下产生电信号的器件。

30、碱焰离子化检测器(AFID):alkali fiame ionization detector.在火焰离子化检测器的喷嘴附近放置碱金属化合物,能增加含氮或含磷化合物所生成的离子,从而使电信号增强的检测器。

31、光离子化检测器(PID):photoionization detector.利用高能量的紫外线,使电离电位低于紫外线能量的组分离子化,在电场作用下产生电信号的器件。

32、火焰光度检测器(FPD):flame photometric detector.将含硫或含磷的化合物在富氢火焰中产生的特征波长的光能转化为电信号的检测器。

33、电子俘获检测器(ECD):electron capture detector.载气分子在3H或Ni63等辐射源产生的β粒子的作用下离子化,在电场中形成稳定的基流,当含有电负性的基团的组分通过电场时,俘获电子使基流减小而产生电信号的器件。

34、微波等离子体(发射光谱)检测器:microwave plasma(emission spectrometric)detector 用微波等离子体激发化合物,使所含元素产生特征发射光谱,经分光系统,能同时检测多种元素的器件。

35、记录器:recorder 记录由检测系统所产生的随时间变化的电信号的仪器。

36、积分仪:integrator 按时间累积检测系统所产生电信号的仪器。

37、固定相:stationary phase 色谱柱内不移动的、起分离作用的物质。

38、吸附剂:adsorbent 具有吸附活性并用于色谱分离的固体物质。

39、固定液:stationary liquid 固定相的组成部分,指涂渍于载体表面上起分离作用的物质,在操作温度下是不易挥发的液体。

40、载体:support 负载固定液的惰性固体。

41、化学键合相:chemically bonded phase 用化学反应在载体表面键合上特定基团的固定相。

42、高分子多孔小球:porous polymer beads 苯乙烯和二乙烯基苯的共聚物或其它共聚的多孔小球,可以单独或涂渍固定液后作为固定相。

43、流动相:mobile phase 在色谱柱中用以携带试样和洗脱组分的气体。

44、载气:carrer gas 用作流动相的气体。

色谱图 chromatogram

色谱峰 chromatographic peak

峰底 peak base

峰高 h,peak height

峰宽 W,peak width

半高峰宽 Wh/2,peak width at half height

峰面积 A,peak area

拖尾峰 tailing area

前伸峰 leading area

假峰 ghost peak

畸峰 distorted peak

反峰 negative peak

拐点 inflection point

原点 origin

斑点 spot

区带 zone

复班 multiple spot

区带脱尾 zone tailing

基线 base line

基线漂移 baseline drift

基线噪声 N,baseline noise

统计矩 moment

一阶原点矩 γ1,first origin moment

二阶中心矩 μ2,second central moment

三阶中心矩 μ3,third central moment

液相色谱法 liquid chromatography,LC

液液色谱法 liquid liquid chromatography,LLC 液固色谱法 liquid solid chromatography,LSC 正相液相色谱法 normal phase liquid

chromatography

反相液相色谱法 reversed phase liquid

chromatography,RPLC

柱液相色谱法 liquid column chromatography 高效液相色谱法 high performance liquid chromatography,HPLC

尺寸排除色谱法 size exclusion chromatography,SEC

凝胶过滤色谱法 gel filtration chromatography 凝胶渗透色谱法 gel permeation chromatography,GPC

亲和色谱法 affinity chromatography

离子交换色谱法 ion exchange chromatography,IEC 离子色谱法 ion chromatography

离子抑制色谱法 ion suppression chromatography 离子对色谱法 ion pair chromatography

疏水作用色谱法 hydrophobic interaction chromatography

制备液相色谱法 preparative liquid chromatography平面色谱法 planar chromatography

纸色谱法 paper chromatography

薄层色谱法 thin layer chromatography,TLC 高效薄层色谱法 high performance thin layer chromatography,HPTLC

浸渍薄层色谱法 impregnated thin layer

chromatography

凝胶薄层色谱法 gel thin layer chromatography 离子交换薄层色谱法 ion exchange thin layer chromatography

制备薄层色谱法 preparative thin layer chromatography

薄层棒色谱法 thin layer rod chromatography 液相色谱仪 liquid chromatograph

制备液相色谱仪 preparative liquid chromatograph 凝胶渗透色谱仪 gel permeation chromatograph 涂布器 spreader

点样器 sample applicator

色谱柱 chromatographic column

棒状色谱柱 monolith column monolith column 微粒柱 microparticle column

填充毛细管柱 packed capillary column

空心柱 open tubular column

微径柱 microbore column

混合柱 mixed column

组合柱 coupled column

预柱 precolumn

保护柱 guard column

预饱和柱 presaturation column

浓缩柱 concentrating column

抑制柱 suppression column

薄层板 thin layer plate

3.ArcGIS中英对照 篇三

3D Analyst Tools

Conversion

TIN 三角计算 TIN 域值 TIN 多边形标志 TIN 节点 TIN 边 TIN 到栅格 栅格转 TIN Functional Surface 三维分析工具

转换

表面功能

插值形状 表面体积 表面点 表面长度 视线

Raster Interpolation

栅格修补

克里金 地形到栅格 曲线拟合

用文件地形到栅格 自然邻域 趋势

距离权重倒数 Raster Math

栅格计算

取整

浮点

Raster Reclass 栅格重分类

切片

查找

用 ASCII 文件重分

用表重分类

重分类 Raster Surface 坡向 坡度 填/挖 山影 曲率

栅格表面

等高线 等高线列表 观察点 视域 TIN Creation

创建 TIN 编辑 TIN TIN Surface

TIN 创建

Analysis Tool:

TIN 表面

TIN 坡度

TIN 方位

TIN 等高线

多边形插值成多个面

分析工具

提取

剪切

选择

拆分 Extract

Clip

Select Split Table Select Overlay

Erase Identity

Intersect

表选择 叠加分析

擦除

查看

相交

对称差 联合更新

邻域分析

缓冲区 多环缓冲区 临近

点距离 统计表

频度

总结统计

绘图工具

掩模工具

Cul-De-Sac 掩模 要素轮廓线掩模 相交图层掩模

转换工具

从删格到...删格到 ASCII Symmetrical Difference

Union Update Proximity

Buffer Multiple Ring Buffer Near

Point Distance Statistics

Frequency

Summary Statistics

Cartography Tool:

Masking Tools

Cul-De-Sac Masks Feature Outline Masks Intersecting Layers Masks

Conversion Tool:

From Raster

Raster to ASCII

Raster to Float Raster to Point

删格到浮点 删格到点 删格到面 删格到线 到 CAD

添加 CAD 字段

创建 CAD 扩展实体数据 导出到 CAD 设置 CAD 别名

到 Coverage

要素类到 Coverage 到 dBASE

表到 dBASE

要素类到要素类 要素类到 Geodatabase 导入 CAD 注记

导入 Coverage 注记 从 CAD 导入

栅格到 Geodatabase 表到 Geodatabase 表到表

到栅格

ASCII 到栅格 DEM 到栅格 要素到栅格 浮点到栅格 栅格到其他格式 到 Shapefile Raster to Polygon

Raster to Polyline

To CAD

Add CAD Fields Create CAD XData Export to CAD

Set CAD Alias

To Coverage

Feature Class To Coverage To dBASE

Table to dBASE [multiple] To GeodatabaSE Feature Class To Feature Class Feature Class to Geodatabase [multiple] Import CAD Annotation Import Coverage Annotation Import from CAD Raster To Geodatabase[multiple]

Table to Geodatabase[multiple] Table To Table To Raster

ASCII to Raster DEM to Raster

Feature to Raster

Float to Raster Raster To Other Format

To Shapefile

Coverage Tool: Analysis

Feature Class To Shapefile 要素类到 Shapefile Coverage 工具

分析

提取

剪切

选择

拆分 Extract Clip

Select Split Overlay Erase Identity

Intersect

叠加

擦除

判别

相交

联合更新

邻近 Union Update Proximity

Buffer Near

Point Distance Point Node Thiessen

Conversion

From Coverage

缓冲

近邻

点距离 点到结点 泰森近似多边形

转换

从 Coverage

到 DLG

到 Interchange 文件 到 S57 到 SETS 到 VPF 取消生成 到 Coverage

高级 Tiger 转换

基本 Tiger 转换 Export To DLG

Export To Interchange File Export To S57

Export To SETS Export To VPF

Ungenerate To Coverage Advanced Tiger Conversion Basic Tiger Conversion

Generate

Import From DLG Import From Interchange File

生成从 DLG 导入

从 Interchange 文件导入 从 S57 导入 从 SETS 导入 从 VPF 导入

数据管理 集合

追加

要素合成线 Coverage 到区域

线 Coverage 到路径 Import From S57 Import From SETS Imort From VPF

Data Management

Aggregate

Append Composite Features

Line Coverage To Region

Line Coverage To Route

Polygon Coverage To Region Region To Polygon Coverage

多边形 Coverage 到区域 区域到多边形 Coverage 聚集多边形

分解双线到中心线

融合消除

查找冲突 简化建筑物 简化线或多边形

删除索引

索引项

添加项 删除项 Generalization Aggregate Polygons

一般

Collapse Dual Lines To Centerline Dissolve

Eliminate

Find Conflicts Simplify Building

Simplify Line Or Polygon Indexes Drop Index Index Item

索引

项 Items Add Item

Drop Item

Joins Join Info Tables Projections Define Projection

Project Transform

连接

投影

连接 Info 表 定义投影 投影

变换

添加 XY 坐标 重新计数节点 更新 ID

容差

构建

Clean 创建标注 VPF 图块拓扑 Tables Add XY Coordinates

Renumber Nodes Update IDs Tolerances Tolerance

容差 拓扑 Topology

Build Clean Create Labels

VPF Tile Topology

Workspace Management

工作空间管理

创建 Coverage

紧凑 Create Coverage

Data Management Tools 数据管理工具

Database

数据库

Compact Compress

Disconnected Editing

Check In

Check In From Delta Check Out

压缩

分离编辑

检入

从增量中检入 检出

值域

导出增量

添加编码值到值域 赋值值域到字段 创建值域

从值域中删除编码值 删除值域 值域到表 从字段删除值域 为范围值域设置值 表到值域

要素类

追加注记要素类

计算缺省容限值 Export To Delta Domains

Add Coded Value To Domain Assign Domain To Field

Create Domain

Delete Coded Value From Domain Delete Domain

Domain To Table Remove Domain From Field Set Value For Range Domain Table To Domain Feature class

Append Annotation Feature Classes Calculate Default Cluster Tolerance Calculate Default Spatial Grid Index 计算缺省空间格网索引

Integrate

整合

Update Annotation Feature Class

创建要素类

Features

要素

Add XY Coordinates

更新标记要素类 创建要素类

添加 XY 坐标

检查几何形状 复制要素

删除要素 要素封装到多边形 Check Geometry Copy Features

Delete Features Feature Envelope to Polygon

Feature To Line Feature To Point Feature To Polygon

Feature Vertices To Points Multipart To Singlepart

Polygon To Line Repair Geometry Split Line At Vertices

Fields

Add Field

Assign Default To Field

Calculate Field Delete Field General

Copy

Delete Rename Select Data 追加

Generalization Dissolve

Eliminate

Simplify Line

Smooth Line Indexes

Add Attribute Index Add Spatial Index

Remove Attribute Index Remove Spatial Index Joins

Add Join

Remove Join Layers and Table Views

Make Query Table Make Raster Catalog Layer Make Raster Layer

要素到线 要素到点 要素到多边形 要素定点到点 多部分到单部分 多边形到线 修改集合形状

在定点拆分线

字段

添加字段 设置缺省到字段 计算字段 删除字段 一般

复制

删除

重命名 选择数据

追加

一般

融合消除

简化线平滑线 索引

添加属性索引 添加空间索引 删除属性索引 删除空间索引 连接

添加连接 删除连接

图层和表的查看

制作查询表 制作栅格目录图层 制作栅格图层

Make XY Event Layer Save To Layer File

Select Layer By Attribute Select Layer By Location

制作 XY 事件图层 保存成图层文件 通过属性选择 通过位置选择 制作表视图 制作要素图层 制作表视图 制作要素图层

Projections and Transformations 投影和转换

Feature Batch Project

Project 创建空间参考 Raster Flip

Mirror Project Raster Rescale Rotate Shift War

Define Projection

Raster

Batch Build Pyramids Batch Calculate Statistics Build Pyramids

Calculate Statistics Clip

Composite Bands Copy Raster Copy Raster Catalog Items Create Raster Catalog Delete Raster Catalog Items Mosaic To New Raster Resample

创建栅格数据集

镶嵌

Relationship Classes

Create Relationship Class Table To Relationship Class Subtypes

Add Subtype Remove Subtype

Set Default Subtype Set Subtype Field

Table

要素

批量投影

投影

创建空间参考

栅格

翻转

镜像

投影栅格

重建比例

旋转

偏移

翘曲

定义投影 栅格

批量建立金字塔

批量计算统计表 建立金字塔 计算统计表 剪切

组合波段 复制栅格 复制栅格目录项 创建栅格目录 删除栅格目录项

镶嵌到新的栅格

重采样

创建栅格数据集

镶嵌

关系类

创建关系类

表到关系类 子类型

添加子类型

删除子类型

设置缺省子类型

设置子类型字段

Analyze Change Privileges

Copy Rows

分析

改变权限 复制行 删除行 获得数目 关联表 创建表

拓扑

添加要素类型到拓扑 添加规则到拓扑 创建拓扑

从拓扑删除要素类 从拓扑中删除规则 设置簇容限值

版本

教验拓扑

改变版本 创建版本 删除版本 提交版本 协调版本 注册版本

工作空间

取消注册

创建 ArcInfo 工作空间 创建要素数据集 创建文件夹

创建个人 Geodatabase

地理编码工具

自动生成地理编码索引 创建地址定位器

取消自动生成地理编码索引 删除地址定位器 地理编码地址 重建地理编码索引 标准化地址 Delete Rows Get Count

Pivot Table 创建表

Topology

Add Feature Class To Topology Add Rule To Topology Create Topology Remove Feature Class From Topology Remove Rule From Topology Set Cluster Tolerance Validate Topology

Versions

Alter Version

Create Version Delete Version Post Version Reconcile Version

Register As Versioned Unregister As Versioned

Workspace

Create ArcInfo Workspace Create Feature Dataset

Create Folder

Create Personal GDB Geocoding Tools

Automate Geocoding Indexes Create Address Locator

Deautomate Geocoding Indexes Delete Address Locator

Geocode Addresses

Rebuild Geocoding Indexes Standardize Addresses

Geostatistical Analyst Tools

Geostatistical Layer To Grid

地理统计分析工具

导出地理统计图层到 Grid

线性参考工具

校准路径 创建路径 融合路径事件

Linear Referencing Tools

Calibrate Routes Create Routes

Dissolve Route Events

Locate Features Along Routes

沿路径定位要素 制作路径事件图层 Make Route Event Layer

Overlay Route Events Transform Route Events

Spatial Analyst Tools

Conditional

拾取 条件 设空 Density

核密度 点密度 线密度

Distance

代价分配 代价回联 代价距离 代价路径 欧几里德分配 欧几里德方向 欧几里德距离 走廊 路径距离 路径距离分配 路径距离回联 Extraction

提取值到点 根据属性提取 用圆提取 用多边形提取 用掩模提取 用点提取 用矩形提取 采样 Generalization 区块组合 多数过滤 收缩 消蚀 细化 聚合 膨胀 边界清理

叠加路径事件 转换路径事件

空间分析工具

条件

密度

距离

提取

一般

Groundwater

粒子跟踪 达西流 达西速率 透水层 Hydrology

下陷点 填充 捕捉汇流点 河流分级 河流到要素 河流连接 流向 流域 流程 盆地 累积流量

Interpolation

克里金 地形到栅格 曲线拟合

用文件地形到栅格自然邻域 趋势

距离权重倒数 Local

像素统计 分级 合成 大于频率 小于频率 普及度 最低位置 最高位置 等于频率 Map Algebra

单输出地图代数 多输出地图代数 Math

Bitwise 位与

位右移 位否

位异或

地下水

水文

添补

本地

地图代数

数学计算

为运算

左位移

按位或 Logical 不等于

为空

大于

大于等于 小于

小于等于

测试

等于

组合与

组合异或

组合或 逻辑与 逻辑否

逻辑异或

逻辑或 Trigonometric

ATan2 余弦

双曲余弦 双曲正切 双曲正弦 反余弦 反双曲余弦 反双曲正切 反双曲正弦 反正切 反正弦 正切

正弦的对数 10 的指数 2 的对数 2 的指数 上取整 下取整 乘

取整 否

平方

逻辑运算

三角函数

平方根 指数 整除 浮点

绝对值

自然对数

自然指数

Multivariate

多元多变量

Isocluster

主成分

创建特征

最大似然性分类

波段组统计

类概率

系统树图功能

编辑署名函数

Neighborhood

邻域

块统计

点统计

焦点流

焦点统计

线统计

过滤

Overlay

叠加

加权叠加

Raster Creation 栅格创建

创建常量栅格

创建正态栅格

创建随机栅格

Reclass

重分类

切片

查找

用 ASCII 文件重分

用表重分类

重分类 Surface

坡向 坡度 填/挖 山影 曲率 等高线 等高线列表

表面

观察点 视域 Zonal

区域几何 区域几何到表 区域填充 区域统计

区域统计到表

面积制表

Spatial Statistics Tools

Analyzing Patterns

区域

空间统计工具

分析模型

平均邻近邻居 空间自相关 群体和群外要素分析

带渲染群体和群外要素分析 热点分析 带渲染热点分析 测量地理分布

中心要素 定向分布平均线方向平均中心

实用工具

标准间隔距离

计算面积 收集事件 带渲染收集事件 计算渲染

导出要素表到 Ascii 文本 Average Nearest Neighbor High/Low Clustering[Getis-Ord General G]高/低聚类

Spatial Autocorrelation [Morans I] Mapping Clusters

Cluster and Outlier Analysis

绘制群体

Cluster/Outlier Analysis with Rendering Hot Spot Analysis [Getis-Ord Gi*] Hot Spot Analysis with Rendering

Measuring Geographic Distributions

Central Feature Directional Distribution Linear Directional Mean

Mean Center Standard Distance

Utilities

Calculate Areas Collect Events

4.模具中英对照 篇四

flow line----罩一曲面 multisurf------多重曲面 filter-----过滤 ellipse-----椭圆 polar-------极坐标

arc endpoints-----两点画弧 extrude------------------挤压 cold drawn-------------------冷拉

corrosive plastics-----------------防腐塑料 tough-----------------硬度 anneal-----------------n.退火

service life--------------------注塑寿命 high viscosity-----------------粘度较高的 extension plug------------------延伸尾塞 angle plug-------------------斜角尾塞 thermocouple connector---热电偶连结头 hydraulic system---(注塑机的)油压系统

temperature control zone-------------------温控区 barrel heating capacity----料筒加热能力 polygon-------多边形 isometric-------等角视图 zig zag-------双向 one way-------单向 spline-------圆滑曲线 blend-------顺接

guide pin--------导针;边针;直边 support pin---------拉杆;水口边

support pin collar--------拉杆定位;水口边定位介子 tapped hold for eyebolt-------吊模螺孔

thermal expansion coefficient-------热膨胀系数 welding rod-------熔接棒

cavity plate;A bolster plate-----母模板(A板), 前模板 stripper plate---------活动板,推料板 core plate--------公模板(B板),后模板 spacer block-----------间隔板

ejector retainer plate-----------上顶针板 ejector plate-----------下顶针板

pin point gate system---------小水口系统 side gate system-----------大水口系统 infrared-transmitter--------红外线发射器 infrared-receiver------------红外线接受器 synthetic resin------------合成权脂

air blow gun(with nozzles&hose)-------------气枪 spiral hose-------------螺旋形的;盘旋的 guide strip---------------行位导轨 ejector rod--------------斜坊 set screw---------固定螺丝

countersunk screw---------沉头螺丝 hex screws--------胚头螺丝

shoulder screw-----------------带肩螺丝 residual stress-----------------残余应力 tensile--张力 electricity erode-----------------电蚀刻 ohm meter-------------------电阻表 tubular dowel-----------------管钉,销钉 abrasive stone-----------------研磨石材

SPI Mold Finish Comparison Kit--SPI模具抛光比照工具 rolled------------------热轧 forged------------------热锻 screw torque----------------螺杆力矩 screw speed-------------------螺杆速度 screw stroke----------------螺杆行程 nozzle contact force--------热嘴接触力 screw L/D ratio------螺杆长度/直径比例 theoretical shot volume---理论的注射容量 clamp force--------------------合模力 lock force---------------------------锁模力 internal heated------------------------内部加热 external heated------------------------外部加热 heating rod-------------------------加热棒

air-gap insulation------------------------空气隔绝层 spare part(accesory)-------------备用件 insulating ring-----------------------绝缘圈 sealing washer-------------------垃圾钉 adaptor---------------------适配器

hole gauge----------------------孔深量测仪 high-temperature grease------高温油脂 thermal conductivity paste--------导热膏 data cable--------------数据线

compression mold base-------压缩模胚

countersunk-----------------埋头孔 锥孔,沉孔 mill--------------压榨机;磨坊;碾磨;drill---------------钻头;钻床钻孔;钻通 grind-----------------磨擦;磨碎;磨光 turn---------------转动;旋转;翻转 adapter plate-----------------适配模板

leader pin;shoulder leader pin----导针;带肩导针(实心)angle pin(horn pin)---------斜针;斜边 straight bushing----------直导套(空心)shoulder bushing----------带肩导套 sprue puller pin----------唧咀扣针 sprue spreader-----------浇口分流锥 runner spreader-----------流道分流锥

tapered interlocks(round & rectangular)---------啤把锁 bronze plated bushing------镀铜导套 guided ejection bushing------导向导套

toggle-lock early ejector return----切换式早期回撞装置 accelerated knock-out----------加速顶棍 accelerated ejector------------加速顶针 collapsible core---------可折迭式的型芯 slide retainer------------行位固定装置

jiffy latch-lock assemblies-------------快速拉杆锁定装置 tapped hole------------------螺丝孔

no resettable shot counter-----------非复位注射计数器 profiled ejector pin------------底面在有倾斜截面的顶针 copper-------红铜 brass-------黄铜 bronze--------青铜 BeCu--------铍铜

counterbore---------------拔头,介子托 fan gate-----------------扇形入口 fillet----------------圆形入口 guide pin 直边 screw thread 螺纹 air pump 空气泵 alloy 合金

alloy steel 合金钢

fixed clamp plate;top clamping plate;top plate定模座块 动模座块 moving clamp plate;bottom clamping plate 上模座块 upper clamping plate 下模座块 lower clamping plate 凹模固定板 cavity-retainer plate 型芯固定板 core-retainer plate 突模固定板 punch-retainer plate 模套 chase;bolster;frame pin point gate-------------细水口 hose clip--------------入喉箍 jiggle----------------斜顶

British Standard Whitworth thread BSW--英制螺丝(粗牙)British Standard Fine Thread BSF-------英制螺丝(幼牙)British Standard Pipe Thread(BSP)--------英制喉牙

National Pipe Thread-----------------------美制螺牙 pressure plug----------------喉塞

pressure spring-----------------压力弹簧 vent------------------疏气孔

alignment strip--------------------斜锁 ball catch---------------------弹弓波子 bridge piece------------------水口铁

Jiffy-matic connector---------------------快速连接喉

All ejector blades must have key to avoid rotating.扁顶针要止转 ejector bearing length 弹弓压缩长度 reinforcement rib 加强筋 steel pad 方铁 latch 拉杆

sprue puller insert 扣针导套 stage ejector=knock out 顶棍 ejector retainer plate 上顶针板 ejector base plate 下顶针板 stripper plate 活动板

runner stripper plate 脱料板 P/L flash 分形面披锋 scrape 拖花 burn 烧黑

safety strap 码板

side gate system 大水口系统

three plate type system 简化型细水口系统 pin point gate system 细水口系统 guide pin/guide bush 直边/托司 top clamp plate 工字板 stripper plate 推板 spacer block 方铁

bottom clamp plate 底板 shoulder guide pin 带肩导针 shoulder guide bush 托司

straight guide bush 直司/直导套 支承板 backing plate;support plate 垫块 spacer;parallel

支架 ejector housing,mould base leg 斜销 angle pin,finger cam 滑块 slide,cam slide

侧芯型滑块 side core slide 滑块导板 side guide strip

楔紧块,撑鸡 heel block,wedge bock 斜槽导板 finger guide plate 弯销 dog-leg cam

斜滑块 angle-lift splits

导向零件

导柱 guide pillar;guide pin;leader pin

推板导柱 ejector guide pillar;ejector guide pin 带头导套 guide bush;guide bushing

推板导套 ejector guide bush;ejector bushing

定位和限位零件

锥形定位件 mould bases locting elements 复位杆 ejector plate return pin,push-back pin 限位块 stop block;stop pad 定距拉杆 length bolt;puller bolt 定距拉板 puller plate;limit plate

推出零件

推流道板 runner stripper plate

分流道拉料杆 runner puller;runner lock pin 拉流杆;扣针 sprue puller

钩形拉料杆 sprue puller, Z-shaped 球头拉料杆 sprue puller,ball-headed

圆锥头拉料杆 sprue puller,conical headed 连接推杆 ejector tie rod

推板 ejector plate;ejection plate 推杆固定板 ejector retainer plate 推件环(盘)stripper ring(disk)推件板 stripper plate 推块 ejector pad

推管(司筒,导筒)ejector sleeve 推杆 ejector pin 圆柱头推杆 ejector pin with cylindrical head 带肩推杆 shouldered ejector pin 扁推杆 flat ejector pin 塑料成型模具的主要设计要素 脱模距 stripper distance 脱模斜度 draft 投影面积 projected area 最大开距 maximum daylight;open daylight 闭合高度 mould-shut height 抽芯距 core-pulling distance 抽芯力 core-pulling force 脱模力 ejector force 开模力 mould opening force

表面缩水 shrinkage

料位过薄/砸穿 thin wall stock 走水不平行 uneven fill pattern

夹水纹/流纹 witness line;mismatch;stress marks 走水纹 knit lines 走水不齐 short shots orifice 料口

nozzle seat 热嘴垫圈 nozzle plate 射嘴板 cross pin 十字头销 sled 射台

seal ring 封密圈 spacer rail 介子座

模内压力 internal mould pressure;cavity pressure 成型压力 moulding pressure 背压环 back-up ring 1 bar = 14.5psi 高压接头 bite type fitting 液压马达 hydraulic motor 冷却水流量计 waterflow regulator 打磨器材 abrasive material 打磨砂轮 grinding wheels 切割砂轮 cutting wheels 码模夹(注塑机使用)mould clamps;lifting clamps 小五金工具 piping tools 高压力软管 high pressure hose 风管,水软管 air.water hose 高压油表 pressure gauge 压力油喉 hydraulic hoses 光塑检测 photoelastic testing 吹塑模 plastic blow mould 注塑模 plastic injection mould 冲扎复合模 blank & form compound die 精密冲模 precision blanking die 熔料流动率 MFR=melt flow rate 熔料流动指数 MET=melt flow index 推板导柱 guide pin for ejector plater 座板 clamping plate 垫块 space block(plate)推板 ejector block(plate)afdek plate 档尘板 guide stripe 行位后板 cavity sub-insert 前模镶件 core sub-insert 后模镶件 sprue puller insert 扣针镶件 stage ejector 顶棍

spacer rock(risers)间隔板 变形 distortion 弯曲 warp 拖花 drag marks 火花纹 EDM marks 困气 venting 烧黑 burns heater groove 发热管槽

heater cement 发热管的结合剂 soak 浸泡 seat 垫圈

ream 铰大圆孔直径 grind 磨床 drill 钻床 mill 铣床 caliper 卡尺

G-caliper 分厘卡 Depth Gauge 深厚计 hardness tester 硬度计 angle gauge 角规 marble table 云台石 projector 投影仪 height gauge 高度仪 microscope 显微镜 plug gauge 塞规

leveller 水平器 R gauge R 规

Inter caliper 内分厘卡 surface平面仪

item number 细目编码

catalog number 材料分类编码 undercut lip 倒扣口

hot tip = hot drop = nozzle 热嘴 blow-off strip 放气板 blow-off nozzle 吹风口 spiral hose 螺旋式的连接喉 rust solvent 除锈剂 shaft 曲轴

tensile strength 拉伸力 yield strength 屈服力 spark erosion 电火花蚀刻 etch(photo-etch)电蚀 harden 淬硬

copper electrode 铜公

corrosion resistance 耐腐蚀 anneal 退火

heat treatment 淬火 FEM(finite elemnet method)有限元法 preliminary tool design 初期模具设计图 zone 热流道区域 reverse taper 倒啤把 clamp plate 码板 toggle clamp 快速夹 vacuum furnace 真空炉

cavity insert rounds 圆柱镶件 cavity insert b0locks 方柱镶件

tensile strength 抗张强度,抗拉强度 Concept drawing 概念图 Assembly drawing 装配图 mismatch;witness line 夹纹 piston 活塞 plunger 柱塞 carrier 导轨 rest 支架

item number 项目编号 catalog item 商品目录编码 dimensional datum 尺寸基准

heat treatment certification 淬硬证明文件 back-up bushing 支撑导套

jacking screw 起重螺丝,千斤顶

tapped hole(带有螺旋角度的)螺丝孔 diagonal corner 成对角的角落 burn mark 烧痕

shut-off(n.)枕位

venting valves 疏气阀 venting plug 疏气塞 valve casing 阀门罩 twist drill 旋钻 harden/nitride 碎硬 anneal 退火 temper 回火

stess crack 应力断裂

corrosion resistance 防腐,防锈

tensile strength 物】抗张强度,抗拉强度 split mould(分离)组合式的模具 inclined plate 斜面 inclined bolt 斜栓

jaw(工具,机械等)夹住东西的部分,钳口 step change of the P/L 分形面枕位的改变 thin steel section 较薄的料位 clean-up 清理,清除,清扫

Mold Dating Insert 模具日志镶件 Hot Sprue Bushing 热浇口套 semi-automatic 半自动

quick disconnector 快速断开接头 full shot 足量注射 mismatch 夹痕;夹水纹 ejector mark 顶痕

screw boss 螺丝孔,螺丝基座 sink mark 缩坑

15% glass filled ABS 掺有15%玻璃的ABS spraying mold release 脱模剂 drag mark 拖痕 stress mark 应力痕

reinforcement rib 加强筋 slght stoning 轻度磨砂 soliid line 实线 dotted line 虚线

internal diameter 内径 external diameter 外径 nickel-plated 电镀的

handling hole;lifting hole 吊装孔 parallel平行块 hot runner mainfold(热流道板)分流板 texuring 蚀纹

clamping screw(注塑机)码模螺丝 imperial 英制的 metric 公制的

puller bushing 水口套 puller bar 水口铁

drool bushing 防漏胶套筒 safety switch 限位制

water line connected internally or hard tubing 不可用胶喉连接运水

lifter on square rod or locked from rotation 用方形柱或用管钉止转

gate insert 入水镶件

gate shut-offs 流道开关配件 guided ejection 中托司

parting line shutoff 前后模接触面

waterlines clear tie bars.运水喉咀接驳位要避开啤机呵林柱.BGV=Balanced Gate Value平衡入水值 spacer 垫块 pocket 挖槽 rough 粗加工 finish 精加工

plunge rate 进刀率 retract rate 提刀速率 splindle rate 主轴转速 coolant 冷却液

SPLIT RING 开口环(钥匙圈)

侧向抽芯力 side pulling-core force convert.transfer 转图 guide pin 边针

Tee slot cutter T形SLOT CUTTER zigzag 双向切削

constant overlap spiral 等距环切 parallel spiral 环绕切削

parallel spiral clean corners 环切并清角 morph spiral 依外形环绕 true spiral 螺旋切削 one way 单向 end mill平铣刀 spher mill 球刀 bull mill 圆鼻刀 face mill 面铣刀 rad mill 圆角成型刀 chamfer mill 倒角刀 slot mill 槽刀

taper mill 推拔铣刀 dove mill 鸠尾铣刀 lot mill 棒状 drill 钻孔 reamer 纹刀 bore bar 搪刀 tap RH 右牙刀 disk gate;disphragm gate 盘形浇口 spoke gate;spider gate 轮辐浇口 pin-point gate 点浇口 edge gate 侧浇口

submarine gate;tunnel gate 潜伏浇口 fan gate 扇形浇口 tab gate 护耳浇口

runner plate 流道板(或冷或热)secondary nozzle 二级喷嘴

torpedo;torpedo body assembly 鱼雷形组合体 catridge heater 管式加热器 heat pipe 热管

valve gate 阀式浇口

Tap LH 左牙刀 ctr Drill 中心钻 spot drill 点钻 cntr bore 沉头孔刀 c.sink 鱼眼孔钻 loft surface 举升曲面 coons surface 昆氏曲面 ruled surface 直纹曲面 revolved surface 旋转曲面 swept surface 扫描曲面 draft surface 牵引曲面

grinding wheel 磨砂使用的轮子 quench steel 将...淬火,使冷却 stress relieving 应力消除 molten 熔热的 oxide film 氧化层

guide pin and sleeve, locating ring ,导边,司筒,定位圈

ejector ,ejector balde, ejector sleeve,顶针,扁顶针,顶针司筒, lifters, wear plate,horn pin,斜坊,磨损板,气顶针, O ring, water baffle, water pipe plug,O形圈,隔片,运水管道塞, water line connector,wear plate ,运水管道转接头,耐磨板 air cylinder,hydraulic cylinder,氯压缸,液压缸

micro switch,oil nipple, spring,开关装置,油枪接头,弹弓 sprue bushing,early return system,浇口套,早期回撞装置, accelerated ejectors, slied holder,加速顶针,注塑周期计数器, cycle counter,date stamper,滑块固定板,生产日期铭牌, hot runner system,热流道系统 chemical composition

化学成份 thermal conductiivity

导热性能 thermal diffusivity

热扩散性能 dimensonal stablity

尺寸稳定性能 cooling effiency

冷却效率 easiler ejection

易于脱模 alloy insert

合金镶件(cooling)duct 输送管;导管 maintenance cost 维护费用 ultrasonic testing 超声波检测 crack 断裂

direct gate 直接浇口 ring gate 环形浇口 force plunger;pot plunger 柱塞 flash groove;spew groove 溢料槽

impression;cavity block;cavity plate 凹模 punch;force 凸模

movable insert;loose detail 活动镶件

cavity splits;core splits(凹模拼块)(型芯拼块)拼块 side core 侧型芯

thread plug;threaded core 螺纹型芯 thread ring;threaded cavity 螺纹型环 cutting wheel 切割砂轮 grinding wheel 打磨砂轮 abrasive material 打磨器材

mould clamps;lifting clamp 砂模夹(注塑机使用)air(water)hose 风管,水轮管 pressure gauge 高压油表 hydraulic hose 压力油喉 plastic blow mould 吹塑模 plastic injection mould 注塑模

blandk&form compound die 冲扎复合模 precisiion blanking die 精密冲模 MFR=melt flow rate 熔料流动率 MFT=melt flow index 熔料流动指数 handling hole 拉铃孔 stop plate 限位块 linder bush 衬套

spacer block(plate)垫块,方铁 back-up ring 背位环 standoff 限位块

American Safety Hoist Rings.英制安全吊装环 Mechanical Properties 机械性能 Tensile Strength(MPa)抗拉强度 elongation 延伸率 hardness(Brinell)硬度 shear stength(MPa)剪切力 impact strength 冲韧性

Physical Properties 物理性能

solidification shrinkage 凝固收缩率 freezing range 凝固与熔范围 thermal expansion 热膨胀系数 specific heat 比热 thermal conductivity 热导率 electrical conductivity 电导率 micro-structure 金相分析 hot work tool steel 热作钢 circular motion 环形运动 variable 变数,参数

graphics window 图形窗口

degree entry and a zero degree exit.进刀口45度,退刀口0度 runner stripper plate 脱料板 stripper plate 活动板

spacer rock(risers)间隔板 stage ejector 顶棍

sprue puller insert 扣针导套 angle pin

斜针 fan gate

扇形入水 fillet

圆口

ball catch

弹弓波子 blade ejector

扁顶 bottom clamping plate 底码板 free length

自然长度 bridge piece

水口铁

helix spindle

锅杆 hose clip

水喉箍 bubbler

隔气运水 jiggle

斜顶 jiggle witness line

斜顶片位置

guide strip 行位后板 afdek plate 挡尘板 side gate 大水口 pinpoint gate 细水口 SHCS 杯头螺丝 FHCS平头螺丝 set screw 无头螺丝 ball catch 波子螺丝 wedge 行位较杯

gib 线条,(撑鸡的导轨)latch 拉杆 clamp 码仔

spring guide pin 弹弓导柱 steel pad disc 橙仔方 ejector cam insert 斜顶块(screw)nut 螺母 taper 嗲把/ 斜度

taper interlock 嗲把锁 texture 花纹

toggle-lok 回撞装置

top clamping plate 顶码板

unified national coarse(UNC)美制螺丝(粗牙)unified national fine(UNF)美制螺丝(幼牙)set screw 喷头螺丝 side gate

大水口 slide retainer

行位管位 water junction

喉咀 spacer block

登仔 jiffy-matic socket 喉咀套 jiffy-tite plug

喉咀公 spring plunger

弹弓座 sprue puller

勾针/勾粒 spring washer

弹簧塑圈 stepped ejector pin 有托顶针

strippers plate

推板/细水口板 submarine gate

潜水口 support pin

拉杆 support plate

暗板 surface finish

光洁度 alignment strip

斜锁 center distance(CRS)山打距离(中心线距离)clamp

码仔 contour

外形 leader pin

导针

location ring(flange)

法兰 counterbore

拔头,介子托 mock-up;prototype

手办

die cast

合金压铸 national pipe thread(NPT)美制喉牙 overflow

垃圾位

ejection sleeve

司筒,顶套 epoxy

胶样 pin point gate

细水口 pressure plug

喉塞 pressure spring

压力弹簧 parting line flash 披锋 burned

烧黑 underfilled 缺料

insert mismatch 镶件夹口

ejector pins not flush 顶针有高低 ejector pins skid 顶针滑动 insert flash 镶件披锋

pressure transducer 压力探测头

hydraulic schematic 油积筒油路接驳图

jiffy connector recessed 安装喉嘴后不可突出模胚

knock out pullback stud-flush with clamp plate 顶棍镶件与底板有否空间

safety switches 限位开关 stop block 限位块 safety strap 安全带

drool bushing 防漏胶套筒 insert mismatch 镶件夹口 EDM visible 明显火花纹 lifter scrapes 斜顶拖花 short shots 走水不齐 wall stock 料位厚薄 knit lines 走水纹 stress marks 夹水纹

uneven fill pattern 走水不平行 drag marks 拖花 sprue pretrusion 唧嘴突出高度

sprue orifice and radil size 唧嘴R尺寸 sprue bushing-keyed 唧嘴有管钉 English Chinese program name 产口名称 part name 零件名称 tool name 模具名称 tool source 模具来源 tool steel 模具钢材 resin 塑 料

program number 产品编号 part number 零件编号 tool number 模具编号 customer 客户名称 No of cavities 内模编号 machine size 啤机吨数 drum miller 鼓形铣床

duplex horizontal miller 复式卧铣床 face miller 端面铣床 grinding miller 研磨机 plain miller平面铣床

planer-type miller 刨式铣床 rack miller 齿条铣床 slab miller 大型平面铣床 slot miller 键槽铣刀 spline miller 花键铣刀 thread miller 螺纹铣刀

vertical miller 立式铣刀,立辊,立辊轧机 endmill 立铣刀

plastic mould steel 塑料模钢 cold work steel 冷作钢 hot work steel 热作钢 high speed steel 高速钢

electric magnetic clutch 电磁离合器 pad printer 移印机 screen printer 丝印机 hot stamper 烫印机

solid carbide slitting saw 钻石钢锯片 convex cutter 凸锣刀片 concave cutter 凹锣刀片

side&face cutters,staggered teeth 正侧双用镶钻石钢锣刀 end-mill 锣刀 semi-rod 半圆刀

split double end 双头刀 single end 单头刀 2-flute 两辨 3-flute 三辨 4-flute 四辨 reamer 直拈

centre drill 中心钻 solid carbide drill 钻咀 zinc ingot 锌锭

aluminium ignot 铝锭

tin ignot 锡锭

heater cement 发热管的结合剂 heater groove 发热管槽 spacer rail 介子座 cross pin 十字头销 nozzle plate 射嘴板 nozzle seat 热嘴 addendum 齿冠 dedendum 齿根

上一篇:祝宝宝满月贺词下一篇:关于加快文化产业发展的实施意见