船舶制造个人简历

2024-10-21

船舶制造个人简历(精选8篇)

1.船舶制造个人简历 篇一

船舶制造英语日常用语二

船检业务用英语

1、船体

1.56分段完工后结构完整性和焊缝检查

Inspection structure integrity and welding seam on completing No.56 block.2.上层建筑完后结构完整性检查

Inspection structure integrity after completing the superstructure.3.No.8 与No9分段合拢后大接头装配精确性和结构完整性检查

Checking the joint accuracy and structure integrity between No.8 and No.9 block after closed.4.上层建筑合拢后结构完整性检查

Checking structure integrity of superstructure(deckhouse)after closed.5.货舱口围板船上安装精度检查

Inspecting fitting accuracy of hatch coaming on berth.6.货舱口围板焊接后焊缝检查

Inspecting welding seam of hatch coaming after welding.7.No1压载水舱(No.15分段)气压试验(压头试验)检查

Inspection air pressure test(with water head)for No1.ballast water tank(No15 block).8.上甲板冲水试验检查

Inspection hosing test for upper deck.9.下水前测量船体主尺度、总长、两柱间长、型宽、型深、基线挠度

Measuring hull’s main dimensions:length overall(LOA.),length between perpendiculars(LPP.),breath molded(B.mld.),depth molded and deflection before launching.10.划线后检查吃水标尺至平板龙骨之间的距离

Inspection distance between draught marks and keel plate after marking out.11.吃水标志(载重线标志)安装后精确性检查

Inspecting fitting accuracy of draught mark(loadline mark).12.载重线标志划线后检查尺度

Inspection dimension of loadline after marking out.13.舵叶完工后检查

Checking rudder after completing(finished).14.货舱舱口盖焊缝和尺度检查

Inspection welding seam and dimension of cargo hatch cover.2、轮机内场

1.螺旋桨轴(中间轴)机加工尺寸检查

Inspection machining dimension of propeller shaft(intermediate shaft or counter shaft).2.检查螺旋桨轴与螺旋桨锥度接触面

Check for surface contact area(metallic contact)between stern shaft and propeller hub tapers.3.舵杆机加工尺寸检查

Inspection machining dimension of rudder stock.4.上舵承组装后检查

Inspection rudder carrier after assembly.5.舵销机加工尺寸检查

Inspection machining dimension of rudder pintle.6.舵杆、舵叶、舵销连接后中心线检查

Inspecting alignment of stock, rudder blade and pintle.7.锚投掷试验和拉力试验

Lowering test and tension test of anchor.8.轴系连接螺栓和孔尺寸测量

Measuring dimension of coupling bolts and reamer hole.3、轮机外场安装(钳工)1.防蚀板布置正确性检查

Inspection arrangement correctness of aluminium Anodes.2.船名牌(烟囱标志)安装正确性检查

Inspection installation correctness of ship’s name plate(funnel mark).3.水密小舱口盖(水密门、窗)启闭灵活性检查

Flexibility and hosing test for small water tight hatch cover(water tight door and window).4.货舱舱口盖密性试验(启闭试验、应急启闭试验)

Tightness test(opening and closing test,emergency opening and closing test)for cargo hatch cover.5.弃锚装置检查

Inspecting anchor throwing away appliance.6.轴、舵系镗孔前中心线定位检查

Inspecting centerline positioning for shaft system and rudder system before boring.7.轴系镗孔后光学校中检查

Optical aligned check for shaft system after boring.8.艉轴管滑油液压试验

Hydraulic test for L.O.pipe for stern tube.9.艉轴管前、后轴承与衬套直径测量

Measuring diameter of fore and aft stern tube bearing and bushes.10.艉轴管前、后衬套压入检查

Inspection push-up load for fore and aft stern tube bushes.11.螺旋桨轴与轴承间隙测量

Measuring clearance between propeller shaft & bearing.12.螺旋桨压入检查

Inspection wet fitting the propeller.13.艉轴密性装置的安装与密性试验

Fitting and tightness testing of propeller shaft before launching(after sea trial).14.艉轴管滑油系统的投油清洗 Flushing L.O.system of stern tube.15.舵叶0位检查

Inspecting zero(datum)position of rudder blade.16.舵装置完整性与轻便性检查

Inspecting integrity and flexibility of rudder appliance.17.舵止跳块的间隙测量

Measuring clearance of rudder jumping stopper.18.操舵装置完整性检查

Inspecting integrity of steering gear.19.舵轴承安装间隙测量

Measuring installation clearance of rudder bearing.20.舵机管路系统的投油清洗

Flushing of piping system for steering gear.21.舵机系泊试验

Mooring test of steering gear.22.舵机航行中操舵试验

Manoeuving test of steering gear during sea trial.23.舵机应急操舵试验

Emergency manoeuving test of steering gear.24.锚机管路系统的投油清洗 Flushing of piping system for windlass.25.锚机安装与校中检查

Installation and alignment inspection of windlass.26.锚机系泊试验 Mooring test of windlass.27.锚机航行中抛起锚试验

Anchoring and weighting test of windlass on sea trial.28.绞缆机完整性检查

Inspection integrity of mooring winch.29.绞缆机管路系统的投油清洗

Flushing of piping system for mooring winch.30.绞缆机系泊试验

Mooring test of mooring winch.31.舵机(锚机、绞缆机)液压系统安全装置调整

Adjusting safety device for hydraulic system of steering gear(windlass、mooring winch).32.4吨食物吊运转试验和吊重试验

Running test and hoisting test for 4t provision crane.33.救生艇收放试验 Lowering and hoisting test for life boat.34.救生艇航行试验

Sea trial for life boat.35.舷梯(引水员梯)压重试验

Loading test of accommodation ladder(pilot ladder).36.舷梯(引水员梯)和绞车收放试验

Lowering and hoisting test of accommodation ladder(pilot ladder).37.货舱舱口盖启闭试验

Opening and closing test for cargo hatch cover.38.货舱舱口盖应急启闭试验

Emergency opening and closing test for cargo hatch cover.39.水密小舱口盖(水密门、窗)启闭灵活性检查和冲水试验

Flexibility and hosing test for small water tight hatch cover(water tight door and window).40.主机垫片检查

Checking liner of main engine(M.E.).41.主机贯穿螺栓紧固度检查

Tightening inspection for through bolts of main engine(M.E.).42.下水后主机曲轴和中间轴连接后校中

Aligning main engine’s crank shaft and intermediate shaft after launching.43.下水后中间轴和螺旋桨连接后校中

Aligning intermediate shaft and propeller shaft after launching.44.主机动车前(航行试验后)曲轴甩档测量

Measuring deflection of crank shaft of M.E.before starting up(after sea trial).45.主机滑油(燃油)管路投油清洗 Flushing lubrication oil(fuel oil)system of M/E.46.轴带发电机及齿轮箱安装检查

Alignment inspection installation of shaft generator and gear box.47.主机报警和安全装置试验

Alarm testing and safety device testing of M/E.48.主机系泊(航行)试验并检查其附属泵与管路

Mooring test(sea trial)of M.E.and inspection attached pumps and piping system.49.轴带发电机运转试验及主机与轴带发电机之间的离合器的效用试验

Running test of shaft generator and clutching test between M.E.and shaft generator.50.航行试验中轴带发电机与柴油发电机之间的换车试验

Change over test between shaft generator and diesel generator on sea trial.51.主机航行试验后的拆检

Overhauling main engine after sea trial.52.主柴油发电机组安装检查

Installation inspection of main diesel generator.53.主柴油发电机动车前(系泊试验后)曲轴甩档测量

Measuring deflection of crank shaft of main diesel generator before running test(after sea trial).54.主柴油发电机的报警和安全装置试验

Alarm and safety device testing of main diesel generator.55.主柴油发电机运转试验

Running test of main diesel generator.56.应急柴油发电机运转试验

Running test of emergency main diesel generator.57.应急柴油发电机的安全装置试验

Safety device testing for emergency diesel generator.58.主(辅)空气压缩机的充气试验、安全阀和自动装置的调整

Charging test and safety valve and automatic device adjusting for main compressor(auxiliary compressor).59.应急空气压缩机的运转试验、安全阀和安全装置的调整

Running test and safety valve and safety device adjusting for emergency compressor.60.主空气瓶(控制空气瓶、汽笛空气瓶)装船后气密试验和安全阀的调整

Air tightness test and safety valve adjusting for main air receiver(control air receiver, air horn receiver)on board.61.辅锅炉(废气锅炉)装船后气密试验

Air tightness test for auxiliary boiler(economize boiler)on board.62.辅锅炉安全阀检验及蓄压试验

Safety valve adjusting and accumulating test for auxiliary boiler.63.辅锅炉自动控制装置试验

Automatic controller test for auxiliary boiler.64.废气锅炉效用试验

Function test for economizer.65.压载泵效用试验和自动控制装置试验

Function test and automatic controller test for ballast pump.66.舱底水油水分离器(污水处理装置、制淡装置、焚烧炉)效用试验

Function test of bilge oily water separator(sewage treatment plant, fresh water generator, incinerator).67.机舱行车吊重试验

Hoisting test of engine room crane.68.机修间设备运转试验

Running test of machines in repair room.无线电话 radio telephone 电视机和收音机 TV and radio set 电视机和收音机天线共用器

antenna multi coupler of TV and radio set 电罗经 gyro compass 磁罗经 magnetic compass 电脉冲 electrical impulse 应急电站 emergency power station 扬声器 loud speak 继电器 relay contact 配电板 switch board 配电箱 distribution box 变压器 transformer 保险丝 fuse 蜂鸣器 buzzer

69.敷板前驾驶室检查主干电缆安装

Inspection main cable installation for wheel house before paneling decoration.70.总配电板(应急配电板)绝缘电阻测量和保护装置可靠性试验

Measuring insulation resistance and reliability test protection device for main switchboard(emergency switchboard).

2.船舶制造个人简历 篇二

船舶制造企业设备管理的特点是设备数量多、种类多、设备维修保养程序严格。为了提高设备管理效率, 中船重工集团公司712研究所开发了一套基于局域网的设备管理信息系统。该系统可对设备的采购、使用、维修、保养、报废等各环节进行实时监控, 同时各部门也可以对本部门使用的设备进行有效管理, 大大提高了设备使用部门和管理部门之间信息的有效沟通, 使企业设备管理工作日益规范化、制度化和网络化。

二、系统开发环境

基于研究所信息管理系统的软、硬件设施, 该系统开发采用传统的C/S技术和Intranet相结合的解决方案。设备管理部门使用的应用程序采用C/S结构开发, 非设备管理部门使用的应用程序采用B/S结构开发。

1. 技术环境

服务器操作系统:Window 2000/XP/2003或更高版本;数据库管理系统:采用SQL Server 2000, 是基于结构化查询语言 (SQL) 的可伸缩的关系型数据库;客户端操作系统:Window 2000/XP/2003系统;客户端开发工具:客户端应用程序采用Delphi7进行开发;软件架构:Window 2000/2003Server+SQL Server 2000 (数据平台) 。

2. C/S和B/S两种结构功能模块的确定

采用C/S模式设计的功能模块主要是设备管理部门使用的模块, 包括系统管理、设备维护保养、设备台账等。设备管理部门使用人员地点固定且人数少, 每天要处理大量数据, 对数据库的安全性要求高。对于这些人员使用的模块采用C/S模式设计便于实现软件复杂的管理功能和可靠的安全性能。

采用B/S模式设计的功能模块对于非设备管理部门 (主要包括设备使用部门、设备管理流程中具有审批权限的用户) , 这类使用人员不确定且比较分散, 安全性、交互性要求不高。对这些人员使用的模块采用B/S模式设计便于系统管理和维护。主要包括设备采购管理模块、综合查询模块。

3. 系统的网络结构

为了实现上述的功能要求, 该系统网络拓扑结构采用星形拓扑结构。星型拓扑是目前普遍采用的稳定可靠的网络拓扑结构, 易于扩充节点、隔离故障;通过路由器与互联网进行连接。其网络拓扑结构如图1。

其中, 设备管理人员的客户机, 通过研究所内部的局域网来与服务器交互信息;非设备管理人员或者异地的工作人员可以通过网络浏览器与服务器交互信息。该系统的数据库访问方法如图2。

三、系统主要功能分析

根据系统分析的结果, 按照结构化的系统设计方法, 设备管理系统的结构功能如图3所示 (因研究所设备维修采取外包的方式, 故不涉及备件管理业务) 。

1. 系统管理

(1) 基本信息维护。主要完成系统基本信息的设置、修改和补充, 包括单位、部门、员工、生产厂家基本信息维护, 只有较高权限的人才能进行基本信息维护。系统基本信息的准确、完善是确保设备基本信息正确的前提。

(2) 权限维护。用于设置用户的使用权限, 初始登陆口令, 保证用户信息安全。为了保证系统运行安全, 对不同的用户进行了不同等级的严格授权, 用户登陆使用固定IP地址和USB Key捆绑的模式进行身份确认。

2. 设备采购

主要完成对设备订货申请、设备订货审批、采购任务分配、询价, 以及设备采购合同签订、设备验收任务等整个采购流程的管理。

首先由订货申请人在系统中填写设备订货申请, 再由部门负责人、设备管理部门、单位领导逐级进行网上审批, 并保留审批记录。采购任务分配后, 询价单亦可进行网上审批, 审价部门初审、复审后, 再由单位领导审定。采购设备入厂验收完成之后, 在系统中填写设备验收单, 根据验收单中的记录自动生成设备信息库, 也可将设备验收单打印存档。

3. 维护保养

(1) 设备日常维修。主要完成设备在日常使用中出现的突发性维修事件。使用部门提出维修申请, 设备管理部门根据设备故障状况安排相应的维修作业。并把故障状况、维修验收结果同时录入设备台账维修档案中, 为以后设备保养和预测性维护提供数据参考。

(2) 设备预测性维护。通过对设备状态点的监测和实时数据的采集, 通过分析预测设备的故障, 系统会对设备是否进行预测性维护做出初步判断, 供设备管理人员进行参考并做出人工决断。由此, 设备维护工作可以由事后被动变为事前主动, 利于及时排除故障。

(3) 各级保养。是指按照设备特点所进行的定期维护活动。当前研究所设备保养分为一级保养和二级保养。当在系统里设置了有关设备的一级保养和二级保养的期限后, 系统会在相应日期到来之前的30天进行报警提示, 以便设备管理部门提前做好相关工作准备。

4. 设备台账

(1) 设备台账管理。主要包括设备基本信息录入、数据修改、设备折旧、设备报废审批等内容。该功能对设备的基本信息和运行属性建立了设备信息库, 包括统一编码、资产名称、规格型号、生产厂家、出厂编号、原值、年折旧值、使用部门、数量、使用日期、安装地点、设备状况、一级保养、二级保养、维修次数等参数, 为各部门提供了准确、可靠的数据。

(2) 设备报废管理。完成设备报废的整个操作流程。

(3) 设备状态变更。及时修正有关设备的状态变更, 包括设备禁用、封存、报修、报废等。

(4) 台账结转。每年年终对整个单位设备进行一次全面核实。

5. 查询统计

提供多角度、多条件的查询功能, 包括采购申请跟踪查询、各类设备综合查询、设备保养查询、设备维修查询、设备报废查询等功能, 同时实现各种需求的报表统计。

四、结论

该设备管理系统的使用, 不仅迅速完善了单位设备信息库, 也规范了设备管理工作流程, 提高工作效率。通过设备管理系统, 可以及时了解设备资产的运行、分布、构成、变动、利用等情况, 变静态管理为动态管理, 实现设备资源的优化管理、优化配置。

摘要:针对船舶制造企业设备管理工作的特点, 介绍了本单位设备管理系统的技术开发环境、网络结构、模块功能实现, 并分析了使用效果。

关键词:设备,管理系统,信息化

参考文献

[1]柴中魁, 夏维.基于NET的冷换设备信息管理系统的设计与实现[J].

[2]唐波, 孟遂民, 王刚.发电厂设备资产管理系统的设计与开发[J].电力自动化设备, 2007, 4.

3.临海弄潮,中国制造船舶巨龙 篇三

本期主要介绍船舶行业和船舶与海洋工程专业,为有志于“弄潮儿向涛头立”的理工科学子们展示船自自行业的前景与魅力。

中国:世界第一造船大国

毋庸置疑,造船业是我国近十年来发展最快的制造业门类之一。2003年,我国造船完工量、新接订单量和手持订单量分别为605万载重吨、1850万载重吨和2659万载重吨。到了2008年,这三项衡量造船业景气程度的指标已经分别飙升至2881万载重吨、5818万载重吨和20460万载重吨。如果将观察的起点上溯30年,中国造船业飞跃式的发展更加显而易见。20世纪80年代初期,中国的年造船能力不足50万载重吨,约占世界年造船总量的1%,世界排名13位,在国际船舶出口市场上的业绩几乎为零。80年代中期,受益于改革开放背景下的体制和政策变革,中国造船业开始了从市场和技术两方面“走出去”的历程。2005年,中国造船新接订单量首次超过日本,位居世界第二。2007年,中国造船新接订单量突破了史无前例的1亿载重吨,占据当年全球份额的43%,一举超过了世界第一造船大国——韩国:2010年,世界宏观经濟形势跌入谷底,然而中国造船业却逆势上扬,创造了造船完工量6560万载重吨,新接订单量7523万载重吨,手持订单量19590万载重吨的历史佳绩,中国已取代韩国成为世界第—造船大国。

造船业巨头谁与争锋

2011年的数据显示,我国规模以上船舶工业企业有1242家,其中修造船企业600家,船舶配套设备企业368家,直接从业人员近百万人,规模以上船舶工业企业完成工业总产值5484亿元,并形成了环渤海湾区域、长江下游沿江区域、浙江福建沿海区域和珠江口区域四个大型船舶工业圈。

早在改革开放之初,为了打入国际造船市场,江南造船集团等老牌国有造船企业的大批技术人员投入到国际通用造船规范、船舶技术前沿和先进管理经验的研究学习中,实现了船舶产品出口“零”的突破。自此以后,中国造船业与国际日益接轨,推出了一批具有世界先进水平的品牌船型,其中便有享誉全球的“中华江南”型、“中华沪东”型巴拿马散货船、“海豚”型大灵便散货船,“CHINAMAX”型超大矿砂船等等。目前,我国已具备了独立完成各类散货船、集装箱船、油船、气体运输船、多用途船、滚装船、客船、工程船和军用舰船设计建造的能力。其中,大连船舶重工集团首开了国内船企建造30万吨超大型油轮的纪录,带动了中国造船能力的成倍增长。沪东中华造船集团近年来在LNG船(液化天然气运输船)建造领域的开创性业绩打破了欧洲、日韩船厂的技术垄断,使中国在这类高端船舶市场中占据了一席之地。还有长期以来被欧洲造船企业视为“禁脔”的豪华邮轮,也有望在不久的将来从图纸走向现实。

除了上述的几支“国家队”,船舶工业企业“地方队”的发展也十分迅猛,江苏的熔盛重工、扬子江船厂、新世纪船厂、太平洋造船集团和浙江的金海重工便是其中的佼佼者。熔盛重工是目前中国手持订单量最大的造船企业,它的手持订单量超过了中船集团下属船企订单量的总和,它建造的40万吨矿砂船是当今世界上最大的船舶。扬子江船厂和新世纪船厂则以其他船企无法企及的高利润率而备受关注。2011年,扬子江船厂下属的新扬子造船有限公司一次性承接了25艘万箱级超大型集装箱船,被业内视为奇迹。与造船业息息相关的国内航运业巨头也广泛涉足造船领域。如中远集团、中海集团、中外运长航集团都建立了各自的造修船企业。同时,中国造船业的繁荣也吸引了国外造船及配套企业的进入,如韩国的现代重工、大宇造船以及日本的川崎重工、常石造船在中国都设有生产基地。

但是必须指出,随着2008年金融危机之后世界经濟的持续低迷,全球造船业从2008年前后的鼎盛时期逐步下行。可以预见,中国造船业将面临十分严峻的考验。一些意识到严重性的造船企业开始“抢订单”和“苦练内功”,瞄准市场中液化天然气运输船、重吊多用途船、国内航行海船等亮点,做足准备,抵御严冬。不过从另一方面看,这场危机对于经过10余年过热发展、产能极度过剩的中国造船业来说,未必不是一件好事。涅盘重生之后,等待中国造船业的必将新一轮的健康发展。

船舶与海洋工程释疑

船舶与海洋工程专业的任务是培养对船舶有着整体认识的工程技术人员。造船是一项庞大复杂的系统工程,牵涉众多学科。一艘船实质上是一个具有动力的建筑物,它除了要具有陆地建筑物必需的所有功能外,还应在海洋的环境中满足航行、运输、作业、作战等功能上的要求。这些要求需要通过各种特殊的结构、系统和设备来完成。如何将它们集成在一起,使船舶成为一个安全高效的“工具”,就是船舶与海洋工程专业学生在以后的工作中需要面对的问题。

“船舶”与“海洋工程”分别是船舶与海洋工程专业研究对象中的两个相互联系又不尽相同的内容。“船舶”指的是依靠人力、风帆、发动机等动力,能在水上移动的交通手段。而“海洋工程”则是侧重于以开发、利用、保护、恢复海洋资源为目的而建造的海上建筑物。二者的关联之处在于,它们运行的环境有着一致性,“海洋工程”在设计方法和设计规范上与“船舶”存在延续性。

开设课程

和所有学科专业类似,船舶与海洋工程专业的课程设置也可分为三类:基础课、专业基础课和专业课。基础课包括高等数学、线性代数、概率论、复变函数、计算方法、物理学和英语等,这是一个工程技术人员必备的素养。专业基础课包括理论力学、材料力学、流体力学、机械制图、机械设计原理等,其中力学的内容是为了培养理论思考的能力:而机械学的内容则是为了建立以应用为出发点的工程思维。专业课包括船舶与海洋工程概论、船体结构与绘图、船舶静力学、船舶阻力、船舶推进、船舶结构力学、船舶结构强度设计、船舶设计原理、船舶建造工艺学、船舶动力装置、船舶电气、船舶振动等,这些科目是为了让同学们全面地了解船舶的各种特性,使同学们大致形成如何设计和建造船舶的基本思路。

就业去向

船舶与海洋工程专业毕业生的就业方向通常有如下几类:船舶总体设计院所或民营船舶设计公司、造修船厂、船级社和船舶配套设备企业。

对于—个担纲详细设计的船舶设计师而言,首先要考虑的是船舶应满足怎样的总体性能和功能要求;其次应考虑各种舱室、设备、系统的布置;再次应考虑如何提供一个兼顾实用型、安全性和经濟性的结构平台。作为生产设计师,更多的关注应集中在船舶的空间构型和结构细节上,避免结构、设备在空间上冲突。船舶设计按专业又可以分为总体、结构、舾装、轮机、系統、电气六大块。进入设计单位工作的船舶与海洋工程专业毕业生通常从事的是总体、结构、舾装三个专业的设计。就业于造修船厂的毕业生,更多的是从事现场建造工作。

船舶建造师最主要的任务是保证建造工艺及项目管理的合理性,确保建造的质量和进度。船级社对船舶与海洋工程专业的毕业生来说,是非常有吸引力的工作。船级社的工作分为审图和检验两大类,审图工程师负责检查设计单位的送审图纸是否满足国际公约和该船级社制定的规范,现场验船师的工作是以规范为依据监督整个建造过程。目前世界各大船级社都在中国设有公司或办事处,员工待遇较优厚。

船舶行业的重工性质,决定了行业内的薪资水平只能处于全社会的中等。船舶与海洋工程专业的就业率在2003年以后出现了异常火爆的局面,毕业生供不应求。直到2010年,船舶与海洋工程专业仍是就业最快的专业,平均一份简历就能获得一份工作。但是,船舶与海洋工程专业毕业生第一份工作的起薪大多比较低,这一点在过去十年中没有显着的变化。不过无论是船舶设计还是建造,都十分强调技术人员个人经验的积累,一名业务上成长较快的技术人员,收入上的增长也是十分迅速的。

报考建议

船舶与海洋工程专业对同学们身体素质没有太多的限制。但对于那些有志于报考船舶与海洋工程专业的考生来说,有两个问题需要自我明确。首先,自己对这个专业是否是发自内心的热爱。一旦从事这个专业,可能就意味着繁重的工作和枯燥的生活,甚至有可能需要为了国防建设或者重点工程牺牲一些个人的生活情趣。其次是否对技术有着执着的追求。长期从事船舶设计或建造工作的技术人员都有一个切身的体会,那就是无论经验多么丰富,每天总会有新的问题出现,总会有新的知识需要学习,这是由船舶的复杂性决定的,每一个新的问题都需要事无巨细地去钻研直至解决,十分考验人的毅力。

4.绿色船舶制造技术-搅拌摩擦焊 篇四

绿色船舶制造技术-搅拌摩擦焊

基于船舶制造的`要求和搅拌摩擦焊技术的特点,搅拌摩擦焊技术在船舶上的应用可以部分实现船舶制造的绿色化.铝合金在船舶上的应用经历了焊接件、挤压型材和搅拌摩擦焊拼焊挤压型材3个阶段.本文阐述了搅拌摩擦焊用于船舶制造的优点,介绍了该技术在国内外船舶制造方面的发展现状.

作 者:季亚娟 栾国红 Ji Yajuan Luan Guohong 作者单位:北京航空制造工程研究所刊 名:航空制造技术 ISTIC英文刊名:AERONAUTICAL MANUFACTURING TECHNOLOGY年,卷(期):“”(z1)分类号:V2关键词:船舶 搅拌摩擦焊 挤压型材 铝合金

5.船舶制造个人简历 篇五

现当代化信息技术在船舶制造企业得到广泛应用,为企业改革提供了推动力。为了全面提高产品生产效率,信息技术在工具的生产与制作中得到广泛应用,使其原本的功能与作用得到扩张,并且为船舶制造提供了技术与设备方面的有力支持。随着现代化科技的发展,企业要想在市场中占据有利地位,设备是最不可缺少的。如果一个船舶企业没有现代化先进设备,那么是无法顺利完成生产任务的,所以设备是维持企业正常生产经营活动的重要手段,设备管理工作则保证了质量,使生产活动能够顺利进行。

1.2有效实现企业扩大再生产

船舶企业进行生产与扩大再生产,其根本目的在于职工在生产期间使用相关的设备,创造物质财富。所以,对于企业而言,务必要具备物质基础,也就是生产设备与产品制造所需能源材料。由此可见,对于一个企业来说,如果只有职工和管理人员,却缺失了物质基础,那么将阻碍生产的顺利进行。只有完善的设备设施,并且加以管理,才能够使设备始终保持良好的运行状态,将本身所具有的生产效能充分发挥出来,完成预定的生产任务。

1.3减少船舶企业生产耗能并提高生产效率

6.船舶制造个人简历 篇六

船舶制造英语日常用语

好东西大家分享啊

船舶制造英语日常用语 一.

船体

1.You must weld and grind this area before painting.在油漆之前你必须把这个地方电焊修补、打磨好。

2.This welding line should be gouged and welded again before tightness inspection.这条焊缝在密性检查前要碳刨、再焊。

3.The structure of the starboard side is different from the port side.右舷的结构跟左舷的不一样。

4.We should reinforce the downside of the windlass.我们应该在锚机的反面加强。

5.The navigation deck is not plain, we will fair the deck by hot working.驾驶甲板不平,我们要火工校正。

6.There are two pieces of stiffeners and brackets must be replaced.有两块加强筋和肘板要换新。

7.Two more footrests and handgrips should be installed at the entrance of the small hatchcover.在小舱口盖的进口处再安装两只踏步和拉手。

8.Checking the joint accuracy and structure integrity between No.8 and No.9 block after closed.No.8 与No9分段合拢后大接头装配精确性和结构完整性检查。

9.Checking structure integrity of superstructure(deckhouse)after welding.上层建筑焊后结构完整性检查。

10.Inspecting fitting accuracy of hatch coaming on board.货舱口围板船上安装精度检查。

11.Inspection air pressure test(with water head)for No1.water ballast tank(No15 block).No1压载水舱(No.15分段)气压试验(压头试验)检查。12.

Inspection hosing test for upper deck.上甲板冲水试验检查。

13.Measuring hull’s main dimensions: length overall(LOA.),length between perpendiculars(LPP.),breath molded(B.),depth molded(D.)and deflection before launching.下水前测量船体主尺度:总长、两柱间长、型宽、型深、基线挠度。

14.Inspection distance between draught marks and keel plate after marking out.划线后检查吃水标尺至平板龙骨之间的距离。

15.Inspecting fitting accuracy of draught mark(loading line mark).吃水标志(载重线标志)安装精确性检查。

16.Inspection welding seam and dimension of cargo hatch cover.货舱舱口盖焊缝和尺度检查。二.

轮机

船舶制造英语日常用语

1.Inspection machining dimension of propeller shaft(intermediate shaft or counter shaft).螺旋桨轴(中间轴)机加工尺寸检查。

2.Check for surface contact area(metallic contact)between stern shaft and propeller hub tapers.检查螺旋桨轴与螺旋桨锥度接触面。

3.Inspection machining dimension of rudder stock.舵杆机加工尺寸检查。

4.Inspection rudder carrier after assembly.上舵承组装后检查。

5.Inspection machining dimension of rudder pintle.舵销机加工尺寸检查。

6.Inspection alignment of stock, rudder blade and pintle.舵杆、舵叶、舵销连接后中心线检查。7.

Lowering test and tension test of anchor.锚投掷试验和拉力试验。

8.Measuring dimension of shaft coupling bolts and reamer hole.轴系连接螺栓和钻孔尺寸测量。

9.Inspection installation correctness of ship’s name plate(funnel mark).船名牌(烟囱标志)安装正确性检查。

10.Flexibility and hosing test for small water tight hatch cover(water tight door and window).水密小舱口盖(水密门、窗)启闭灵活性、冲水检查。

11.Tightness test(opening and closing test,emergency opening and closing test)for cargo hatch cover.货舱舱口盖密性试验(启闭试验、应急启闭试验)。12.

Inspecting anchor throwing away appliance.弃锚装置检查。

13.Inspecting centerline positioning for shaft system and rudder system before boring.轴、舵系镗孔前中心线定位检查。

14.Optical aligned check for shaft system after boring.轴系镗孔后光学校中检查。

15.Hydraulic test for L.O.pipe for stern tube.艉轴管滑油液压试验。

16.Measuring diameter of fore and aft stern tube bearing and bushes.艉轴管前、后轴承与衬套直径测量。

17.Inspection push-up load for fore and aft stern tube bushes.艉轴管前、后衬套压入检查。

18.Measuring clearance between propeller shaft & bearing.螺旋桨轴与轴承间隙测量。

19.Flushing L.O.system of stern tube.艉轴管滑油系统的投油清洗。

20.Inspecting zero(datum)position of rudder blade.舵叶0位检查。

21.Measuring clearance of rudder jumping stopper.船舶制造英语日常用语

舵止跳块的间隙测量。

22.Inspecting integrity of steering gear.操舵装置完整性检查。

23.Measuring installation clearance of rudder bearing.舵轴承安装间隙测量。

24.Flushing of piping system for steering gear.舵机管路系统的投油清洗。

25.Mooring test of steering gear.舵机系泊试验。

26.Manoeuving test of steering gear during sea trial.舵机航行中操舵试验。

27.Emergency manoeuving test of steering gear.舵机应急操舵试验。

28.Installation and alignment inspection of windlass.锚机安装与校中检查。

29.Anchoring and weighing test of windlass on sea trial.锚机航行中抛起锚试验。

30.Adjusting safety device for hydraulic system of steering gear(windlass、mooring winch).舵机(锚机、绞缆机)液压系统安全装置调整。

31.Running test and loading test for 4t provision crane.4吨食物吊运转试验和吊重试验。

32.Lowering and hoisting test for life boat.救生艇收放试验。

33.Loading test of accommodation ladder(pilot ladder).舷梯(引水员梯)压重试验。

34.Checking liner of main engine(M.E.).主机垫片检查。

35.Tightening inspection for through bolts of main engine(M.E.).主机贯穿螺栓紧固度检查。

36.Aligning main engine’s crank shaft and intermediate shaft after launching.下水后主机曲轴和中间轴连接后校中。

37.Aligning intermediate shaft and propeller shaft after launching.下水后中间轴和螺旋桨连接后校中。

38.Measuring deflection of crank shaft of M.E.before starting up(after sea trial).主机动车前(航行试验后)曲轴甩档测量。

39.Flushing lubrication oil(fuel oil)system of M/E.主机滑油(燃油)管路投油清洗。

40.Alignment inspection installation of shaft generator and gear box.轴带发电机及齿轮箱安装检查。

41.Alarm testing and safety device testing of M/E.主机报警和安全装置试验。

船舶制造英语日常用语

42.Mooring test(sea trial)of M.E.and inspection attached pumps and piping system.主机系泊(航行)试验并检查其附属泵与管路。

43.Running test of shaft generator and clutching test between M.E.and shaft generator.轴带发电机运转试验及主机与轴带发电机之间的离合器的效用试验。

44.Change over test between shaft generator and diesel generator on sea trial.航行试验中轴带发电机与柴油发电机之间的换车试验。45.

Overhauling main engine after sea trial.主机航行试验后的拆检。

46.Installation inspection of main diesel generator.主柴油发电机组安装检查。

47.Safety device testing for emergency diesel generator.应急柴油发电机的安全装置试验。

48.Charging test and safety valve and automatic device adjusting for main compressor(auxiliary compressor).主(辅)空气压缩机的充气试验、安全阀和自动装置的调整。

49.Air tightness test and safety valve adjusting for main air receiver(control air receiver, air horn receiver)on board.主空气瓶(控制空气瓶、汽笛空气瓶)装船后气密试验和安全阀的调整。50.

Safety valve adjusting and accumulating test for auxiliary boiler.辅锅炉安全阀检验及蓄压试验。

51.Air tightness test for auxiliary boiler(economize boiler)on board.辅锅炉(废气锅炉)装船后气密试验。

52.Automatic controller test for auxiliary boiler.辅锅炉自动控制装置试验。

53.Function test for economizer.废气锅炉效用试验。

54.Function test and automatic controller test for ballast pump.压载泵效用试验和自动控制装置试验。

55.Function test of bilge oily water separator(sewage treatment plant, fresh water generator, incinerator).舱底水油水分离器(污水处理装置、制淡装置、焚烧炉)效用试验。三.

电气

1.Inspection main cable installation for wheel house before paneling decoration.敷板前驾驶室检查主干电缆安装.2.

Measuring insulation resistance and reliability test protection device for main switchboard(emergency switchboard).总配电板(应急配电板)绝缘电阻测量和保护装置可靠性试验。

3.Load and performance test for main generator(emergency generator).主发电机(应急发电机)负荷及特性试验。

4.Automatic governing test of voltage and frequency for main generator(emergency generator).主发电机(应急发电机)电压、频率自动调节试验。5.

Parallel-running test for main generator.主发电机并联运行试验。

6.Diesel generator voltage characteristic test.船舶制造英语日常用语

柴油发电机电压特性试验。

7.Diesel generator governor sensitivity test.柴油发电机调速特性试验。

8.Test for taking on a full load suddenly.突加负荷试验。

9.Reverse power relay trip test.逆功率脱扣试验。

10.Over-current relay test.过电流脱扣试验。

11.Under voltage tripping test.低压脱扣试验。

12.Interlocking reliability test.联锁试验。

13.Load test for shaft generator and its function test on sea trial.轴带发电机负荷试验和航行时效用试验。

14.Automatic supply test of emergency generator.应急发电机自动供电试验。

15.Calibrating rudder angle indicator.舵角指示器校准。

16.Remote starting and alarm test for steering gear motor.舵机马达遥控起动和报警试验。17.

Function test automatic pilot.自动舵效用试验。

18.Sequence starting and automatic exchange of motors for auxiliary machine and pump.辅机和泵的电动机程序起动和自动转换。

19.Charge and discharge operation test for battery and charge equipment.蓄电池和充电装置的充放电试验。

20.Operation test of emergency switching-off device for oil pump and ventilator(bilge pump)in engine room.机舱风、油(舱底泵)应急切断装置操作试验。

21.Remote control test for fire pump and emergency fire pump.消防泵、应急消防泵遥控操作试验。22.

Function test of fog horn.雾笛效用试验。

23.Inspection installation and water tightness transducer of echo sounder on berth.测深仪换能器船台安装和水密性检查。

24.Function test and adjust error for log on sea trial.航行试验中计程仪效用试验及误差调整。

25.Function test and calibration self-heterodyne curve for direction finder on sea trial.航行试验中测向仪效用试验及自差曲线校正。

26.Inspection installation for antenna of radio console and measuring its insulation resistance.组装报务台天线安装检查和绝缘测量。

27.Function test of radio console on sea trial.航行试验中组装报务台效用试验。

船舶制造英语日常用语

28.Calibration constant error and function for gyro-compass on sea trial.航行试验中电罗经固定误差校正和效用试验。

29.Function test of radar on sea trial(mooring test).航行试验(系泊试验)中雷达效用试验。

30.Simulating(Automatic)alarm test for fire detector.火警检测器模拟(自动)报警试验。

31.The items are tested according to mooring test program as following : 下列项目按系泊试验大纲进行系泊试验:

32.Function test of engineer calling device(call device in hospital).轮机员呼叫(病室呼叫)装置试验。

33.Function test of ultra-short wave radio telephone.超短波对讲机。

34.Function test of remote control system of main engine.主机遥控系统性能试验。

35.UMS(unattended machinery space)sea trial continue 4~6 hours.无人机舱作4~6小时航行试验。

36.Measuring insulation resistance for circuit.电路绝缘电阻测量。

37.Function test for weather facsimile receive.气象传真机效用试验。四.

上层建筑

1.A/C duct and vent duct structure of W/H Deck.驾驶甲板空调、机械风管结构。

2.Inspection the structure and loading test of the lifeboat(Rescue boat)davit.救生(助)艇吊架结构和压重试验。

3.Ref.Freon piping to be done air-tightness test and vacuum test.冷藏氟利昂管系密性试验和真空试验。

4.Ref.Plant to be done protection device test and cooling-down test.冷藏机组保护装置试验及打冷试验。

5.Accommodation air-condition Freon piping to be done air-tightness and vacuum test.房舱空调氟利昂管系密性试验和真空试验。

6.Accommodation to be done air flowing adjustment test.房舱风量调整试验。

7.E/C room Package A-C to be done function test.集控室单位式空调效用试验。

8.E/R air drier to be done function test and alarm test.机舱空气干燥器效用试验及报警试验。

9.Superstructure water-tightness doors and windows to be done hosing test.上层建筑水密门窗冲水试验。

10.Cabin supply fan to be done function test.房舱风机效用试验。

11.Superstructure lifesaving and fire fighting equipment to be done inspection.上层建筑救生、消防设备交验。

船舶制造英语日常用语

12.Galley and laundry equipment to be done function.厨房、洗衣间设备交验。

13.Refrigerator to be done function test.冰箱效用试验。

14.Rescue boat davit(life raft davit)to be done static(dynamic)loading test.救助艇架(救生筏吊架)静(动)负荷试验。

15.Mushroom outlet closing and opening by hand to be inspected.菌形风帽手动启闭试验。

16.Superstructure compressed air(water supply、fire fighting、smoke detection)piping to be done air-tightness test.上层建筑压缩空气管系(供水管、消防管、烟雾探测管)密性试验。17.

Cabin condensation piping to be done free-flowing test.房舱凝水、落水管系畅通试验。

18.Deck flushing piping system to be done air-tightness test.甲板冲洗管系密性试验。

19.Painting RM.Fire fighting pipe to be done air-tightness test.油漆间消防管系密性试验。

20.W/H water spray pipe to be done function test.驾驶室水喷淋管系效用试验。

21.Insulation of A-deck(including A60 insulation).A甲板绝缘(包括A甲板A60绝缘)。22.

Floating floor of E/C RM.集控室浮动地板。

23.Insulation of emergency generator room(including A60 insulation).应急发电机室绝缘(包括应急发电机室A60绝缘)。24.

Insulation of escape in E/R.(including A60 insulation).机舱逃口绝缘(包括机舱逃口A60绝缘)。

25.Insulation of F11# bulkhead in E/R.(including A60 insulation).F11#舱壁绝缘(包括F11#舱壁A60绝缘)。26.

Completeness of all cabins to be inspection.全船房舱完整性提交。

27.Inspection insulation installation for master room, Chief engineer room,electrical engineer room before install panel.船长室、轮机长室、电机员室上板前检查隔热安装。

28.Completeness delivery of accommodation(joiner work and interior decoration of accommodation)for master room(chief engineer room).船长室(轮机长室)舱室完整性(木工和内部装饰)提交。

船检业务用英语

1、船体

1.56分段完工后结构完整性和焊缝检查

Inspection structure integrity and welding seam on completing No.56 block.船舶制造英语日常用语

2.上层建筑完后结构完整性检查

Inspection structure integrity after completing the superstructure.3.No.8 与No9分段合拢后大接头装配精确性和结构完整性检查

Checking the joint accuracy and structure integrity between No.8 and No.9 block after closed.4.上层建筑合拢后结构完整性检查

Checking structure integrity of superstructure(deckhouse)after closed.5.货舱口围板船上安装精度检查

Inspecting fitting accuracy of hatch coaming on berth.6.货舱口围板焊接后焊缝检查

Inspecting welding seam of hatch coaming after welding.7.No1压载水舱(No.15分段)气压试验(压头试验)检查

Inspection air pressure test(with water head)for No1.ballast water tank(No15 block).8.上甲板冲水试验检查 Inspection hosing test for upper deck.9.下水前测量船体主尺度、总长、两柱间长、型宽、型深、基线挠度

Measuring hull’s main dimensions:length overall(LOA.),length between perpendiculars(LPP.),breath molded(B.mld.),depth molded and deflection before launching.10.划线后检查吃水标尺至平板龙骨之间的距离

Inspection distance between draught marks and keel plate after marking out.11.吃水标志(载重线标志)安装后精确性检查 Inspecting fitting accuracy of draught mark(loadline mark).12.载重线标志划线后检查尺度

Inspection dimension of loadline after marking out.13.舵叶完工后检查

Checking rudder after completing(finished).14.货舱舱口盖焊缝和尺度检查

Inspection welding seam and dimension of cargo hatch cover.2、轮机内场

1.螺旋桨轴(中间轴)机加工尺寸检查

Inspection machining dimension of propeller shaft(intermediate shaft or counter shaft).2.检查螺旋桨轴与螺旋桨锥度接触面

Check for surface contact area(metallic contact)between stern shaft and propeller hub tapers.3.舵杆机加工尺寸检查

Inspection machining dimension of rudder stock.4.上舵承组装后检查

Inspection rudder carrier after assembly.5.舵销机加工尺寸检查

Inspection machining dimension of rudder pintle.6.舵杆、舵叶、舵销连接后中心线检查 Inspecting alignment of stock, rudder blade and pintle.7.锚投掷试验和拉力试验

船舶制造英语日常用语

Lowering test and tension test of anchor.8.轴系连接螺栓和孔尺寸测量

Measuring dimension of coupling bolts and reamer hole.3、轮机外场安装(钳工)1.防蚀板布置正确性检查

Inspection arrangement correctness of aluminium Anodes.2.船名牌(烟囱标志)安装正确性检查

Inspection installation correctness of ship’s name plate(funnel mark).3.水密小舱口盖(水密门、窗)启闭灵活性检查

Flexibility and hosing test for small water tight hatch cover(water tight door and window).4.货舱舱口盖密性试验(启闭试验、应急启闭试验)

Tightness test(opening and closing test,emergency opening and closing test)for cargo hatch cover.5.弃锚装置检查

Inspecting anchor throwing away appliance.6.轴、舵系镗孔前中心线定位检查

Inspecting centerline positioning for shaft system and rudder system before boring.7.轴系镗孔后光学校中检查

Optical aligned check for shaft system after boring.8.艉轴管滑油液压试验

Hydraulic test for L.O.pipe for stern tube.9.艉轴管前、后轴承与衬套直径测量

Measuring diameter of fore and aft stern tube bearing and bushes.10.艉轴管前、后衬套压入检查

Inspection push-up load for fore and aft stern tube bushes.11.螺旋桨轴与轴承间隙测量

Measuring clearance between propeller shaft & bearing.12.螺旋桨压入检查 Inspection wet fitting the propeller.13.艉轴密性装置的安装与密性试验

Fitting and tightness testing of propeller shaft before launching(after sea trial).14.艉轴管滑油系统的投油清洗 Flushing L.O.system of stern tube.15.舵叶0位检查

Inspecting zero(datum)position of rudder blade.16.舵装置完整性与轻便性检查

Inspecting integrity and flexibility of rudder appliance.17.舵止跳块的间隙测量

Measuring clearance of rudder jumping stopper.18.操舵装置完整性检查

船舶制造英语日常用语

Inspecting integrity of steering gear.19.舵轴承安装间隙测量

Measuring installation clearance of rudder bearing.20.舵机管路系统的投油清洗 Flushing of piping system for steering gear.21.舵机系泊试验 Mooring test of steering gear.22.舵机航行中操舵试验

Manoeuving test of steering gear during sea trial.23.舵机应急操舵试验

Emergency manoeuving test of steering gear.24.锚机管路系统的投油清洗 Flushing of piping system for windlass.25.锚机安装与校中检查

Installation and alignment inspection of windlass.26.锚机系泊试验 Mooring test of windlass.27.锚机航行中抛起锚试验

Anchoring and weighting test of windlass on sea trial.28.绞缆机完整性检查 Inspection integrity of mooring winch.29.绞缆机管路系统的投油清洗 Flushing of piping system for mooring winch.30.绞缆机系泊试验 Mooring test of mooring winch.31.舵机(锚机、绞缆机)液压系统安全装置调整

Adjusting safety device for hydraulic system of steering gear(windlass、mooring winch).32.4吨食物吊运转试验和吊重试验 Running test and hoisting test for 4t provision crane.33.救生艇收放试验

Lowering and hoisting test for life boat.34.救生艇航行试验 Sea trial for life boat.35.舷梯(引水员梯)压重试验

Loading test of accommodation ladder(pilot ladder).36.舷梯(引水员梯)和绞车收放试验

Lowering and hoisting test of accommodation ladder(pilot ladder).37.货舱舱口盖启闭试验

Opening and closing test for cargo hatch cover.38.货舱舱口盖应急启闭试验

Emergency opening and closing test for cargo hatch cover.39.水密小舱口盖(水密门、窗)启闭灵活性检查和冲水试验

Flexibility and hosing test for small water tight hatch cover(water tight door and window).船舶制造英语日常用语

40.主机垫片检查

Checking liner of main engine(M.E.).41.主机贯穿螺栓紧固度检查

Tightening inspection for through bolts of main engine(M.E.).42.下水后主机曲轴和中间轴连接后校中

Aligning main engine’s crank shaft and intermediate shaft after launching.43.下水后中间轴和螺旋桨连接后校中

Aligning intermediate shaft and propeller shaft after launching.44.主机动车前(航行试验后)曲轴甩档测量

Measuring deflection of crank shaft of M.E.before starting up(after sea trial).45.主机滑油(燃油)管路投油清洗 Flushing lubrication oil(fuel oil)system of M/E.46.轴带发电机及齿轮箱安装检查

Alignment inspection installation of shaft generator and gear box.47.主机报警和安全装置试验 Alarm testing and safety device testing of M/E.48.主机系泊(航行)试验并检查其附属泵与管路

Mooring test(sea trial)of M.E.and inspection attached pumps and piping system.49.轴带发电机运转试验及主机与轴带发电机之间的离合器的效用试验 Running test of shaft generator and clutching test between M.E.and shaft generator.50.航行试验中轴带发电机与柴油发电机之间的换车试验 Change over test between shaft generator and diesel generator on sea trial.51.主机航行试验后的拆检 Overhauling main engine after sea trial.52.主柴油发电机组安装检查 Installation inspection of main diesel generator.53.主柴油发电机动车前(系泊试验后)曲轴甩档测量

Measuring deflection of crank shaft of main diesel generator before running test(after sea trial).54.主柴油发电机的报警和安全装置试验 Alarm and safety device testing of main diesel generator.55.主柴油发电机运转试验 Running test of main diesel generator.56.应急柴油发电机运转试验

Running test of emergency main diesel generator.57.应急柴油发电机的安全装置试验 Safety device testing for emergency diesel generator.58.主(辅)空气压缩机的充气试验、安全阀和自动装置的调整

Charging test and safety valve and automatic device adjusting for main compressor(auxiliary compressor).59.应急空气压缩机的运转试验、安全阀和安全装置的调整

Running test and safety valve and safety device adjusting for emergency compressor.60.主空气瓶(控制空气瓶、汽笛空气瓶)装船后气密试验和安全阀的调整

船舶制造英语日常用语

Air tightness test and safety valve adjusting for main air receiver(control air receiver, air horn receiver)on board.61.辅锅炉(废气锅炉)装船后气密试验

Air tightness test for auxiliary boiler(economize boiler)on board.62.辅锅炉安全阀检验及蓄压试验

Safety valve adjusting and accumulating test for auxiliary boiler.63.辅锅炉自动控制装置试验 Automatic controller test for auxiliary boiler.64.废气锅炉效用试验 Function test for economizer.65.压载泵效用试验和自动控制装置试验 Function test and automatic controller test for ballast pump.66.舱底水油水分离器(污水处理装置、制淡装置、焚烧炉)效用试验

Function test of bilge oily water separator(sewage treatment plant, fresh water generator, incinerator).67.机舱行车吊重试验 Hoisting test of engine room crane.68.机修间设备运转试验 Running test of machines in repair room.无线电话

radio telephone 电视机和收音机

TV and radio set 电视机和收音机天线共用器

antenna multi coupler of TV and radio set 电罗经

gyro compass 磁罗经

magnetic compass 电脉冲

electrical impulse 应急电站

emergency power station 扬声器

loud speak 继电器

relay contact 配电板

switch board 配电箱

distribution box 变压器

transformer 保险丝

fuse 蜂鸣器

buzzer

69.敷板前驾驶室检查主干电缆安装

Inspection main cable installation for wheel house before paneling decoration.70.总配电板(应急配电板)绝缘电阻测量和保护装置可靠性试验

Measuring insulation resistance and reliability test protection device for main switchboard(emergency switchboard).71.主发电机(应急发电机)负荷及特性试验

Load and performance test for main generator(emergency generator).72.主发电机(应急发电机)电压、频率自动调节试验

船舶制造英语日常用语

Automatic governing test of voltage and frequency for main generator(emergency generator).73.主发电机并联运行试验 Parallel-running test for main generator.74.柴油发电机电压特性试验 Diesel generator voltage characteristic test.75.柴油发电机调速特性试验 Diesel generator governor sensitivity test.76.突加负荷试验

Test for taking on a full load suddenly.77.逆功率脱扣试验 Reverse power relay trip test.78.过电流脱扣试验 Over-current relay test.79.低压脱扣试验 Under voltage tripping test.80.联锁试验 Interlocking reliability test.81.二台主发电机负荷转移试验

Testing load charge-over between two main generator.82.轴带发电机负荷试验和航行时效用试验 Load test for shaft generator and its function test on sea trial.83.应急发电机自动供电试验 Automatic supply test of emergency generator.84.舵角指示器校准 Calibrating tudder angle indicator.85.舵角电动机遥控起动和报警试验 Remote starting and alarm test for steering gear motor.86.自动舵效用试验 Function test automatic pilot.87.锚机(舵机)电动机运转试验 Running test of motor for windless(steering gear).88.辅机和泵的电动机程序起动和自动转换

Sequence starting and automatic exchange of motors for auxiliary machine and pump.89.蓄电池和充电装置的充放电试验

Charge and discharge operation test for battery and charge equipment.90.机舱风、油(舱底泵)应急切断装置操作试验

Operation test of emergency switching-off device for oil pump and ventilator(bilge pump)in engine room.91.消防泵、应急消防泵遥控装置操作试验

Operation test of remote control device for fire pump and emergency fire pump.92.雾笛效用试验 Function test of fog horn.船舶制造英语日常用语

93.测深仪的换能器船台安装和水密性检查

Inspection installation and water tight transducer of echo sounder on berth.94.测深仪效用试验 Function test of echo sounder.95.计程仪水下部分船台安装和水密性检查

Inspection installation and water tight for log’s underwater parts on berth.96.航行试验中计程仪效用试验及误差调整 Function test and adjust error for log on sea trial.97.测向仪环状天线船台安装检查

Inspection installation for loop antenna of direction finder on berth.98.航行试验中测向仪效用试验及自差曲线校正

Function test and calibration self-heterodyne curve for direction finder on sea trial.99.组装报务台天线安装检查和绝缘测量

Inspection installation for antenna of radio console and measuring its insulation resistance.100.发讯机调谐表制表 Scheduling tuning chart of transmitter.101.航行试验中组装报务台效用试验 Function test of radio console on sea trial.102.航行试验中电罗经固定误差校正和效用试验 Calibration constant error and function for gyro compass on sea trial.103.航行试验(系泊试验)中雷达效用试验 Function test of radar on sea trial(mooring test).104.传感器报警设定值模拟试验 Simulating alarm test for fire detector.105.火警检测器自动报警试验 Automatic alarming test for fire detector.106.下列项目按系泊试验大纲进行系泊试验

The items are tested according to mooring test program as following as: 107.轮机员呼叫装置试验 Function test of engineer calling device.108.病室呼叫装置试验

Function test of calling device in hospital.109.超短波对讲机

Function test of ultra-short wave radio telephone.110.主机遥控系统性能试验

Function test of remote control system of main engine.111.无人机舱作4~6小时航行试验

UMS(unattended machinery space)sea trial continue 4~6 hours.112.电路绝缘电阻测量

Measuring installation resistance for circular.113.气象传真机效用试验

Function test for weather facsimile receive.船舶制造英语日常用语

6.内装

1.驾驶甲板空调、机械风管结构 A/C duct and vent duct structure of W/H Deck.2.A甲板空调、机械风管结构 A/C duct and vent duct structure of A-Deck.3.主甲板空调、机械风管结构 A/C duct and vent duct structure of Main Deck.4.救生(助)艇吊架结构和压重试验

Inspection the structure and loading test of the lifeboat(Rescue boat)davit.5.冷藏氟利昂管系密性试验 Ref.Freon piping to be done air-tightness test.6.冷藏氟利昂管系真空试验 Ref.Freon piping to be done vacuum test.7.冷藏机组保护装置试验及打冷试验

Ref.Plant to be done protection divice test and cooling-down test.8.机舱风管结构交验 E/R vent duct structure to be inspected.9.房舱空调氟利昂管系密性试验

Accommodation air-condition freon piping to be done air-tightness test.10.房舱空调氟利昂管系真空试验

Accommodation air-condition freon piping to be done vacuum test.11.房舱风量调整试验

Accommodation to be done air-flow adjustment test.12.房舱空调机组保护装置试验及冷/热效用试验 Accommodation A-C plant to be done protection device test.13.集控室单位式空调效用试验 E/C RM.Package A-C to be done function test.14.机舱空气干燥器效用试验及报警试验 E/R air drier to be done function test and alarm test.15.救生(助)艇收放试验

Lifeboat(rescue boat)to be done lowering and hoisting test.16.上层建筑水密门窗冲水试验

Superstructure water-tightness doors and windows to be done hosing test.17.房舱风机效用试验

Cabin supply fan to be done function test.18.上层建筑救生、消防设备交验

Superstructure life-saving and fire fighting equopment to be done inspection.19.厨房、洗衣间设备交验

Galley and laundry equopment to be done function.船舶制造英语日常用语

20.下甲板逃口――水密门冲水试验 Low deck escape-water-tightness doors to be hose test.21.上层建筑风雨密门窗安装后检查

Inspection water-tightness doors and windows of superstructure after fitting.22.上层建筑通风门门片安装后检查

Inspection air outlet grilles of superstructure after fitting.23.通道门操作和密性试验

Lobby doors to be done operation test and tightness test.24.冰箱效用试验

Refrigerator to be done function test.25.救助艇航行试验 Rescue boat to be done sea trial test.26.救助艇架结构完整性交验

Structure completeness of rescue boat davit to be inspected.27.救助艇架(救生筏吊架)静负荷试验

Rescue boat davit(life raft davit)to be done static loading test.28.救助艇架(救生筏吊架)动负荷试验 Rescue boat davit(life raft davit)to be done dynamic test.29.艏部舱室(舵机房)风管结构交验

Vent duct structure of bow cabin(steering gear RM.)to be inspection.30.菌形风头手动启闭试验

Mushroom outlet closing and opening by hand to be inspected.7、内装(铜工)

1.上层建筑压缩空气管系密性试验

Superstructure compressed air piping to be done air-tightness test.2.上层建筑控制空气管系密性试验

Superstructure compressed control air piping to be done air-tightness test.3.上层建筑供水管系密性试验

Superstructure water supply piping to be done air-tightness test.4.上层建筑消防管系(包括应急消防管系)密性试验

Superstructure fire fighting piping(including emergency fire fighting piping)to be done air-tightness test.5.上层建筑烟雾报警管系密性试验

Superstructure smoke detection piping to be done air-tightness test.6.厨房CO2管系密性试验

Galley CO2 piping to be done air-tightness test.7.上层建筑疏排水管系密性试验

Superstructure drainage air piping to be done air-tightness test.8.房舱凝水、落水管系畅通试验 Cabin condense piping to be done free-flowing test.9.房舱蒸汽管系密性试验

船舶制造英语日常用语

Cabin steam piping system to be done air-tightness test.10.甲板冲洗管系密性试验

Deck flushing piping system to be done air-tightness test.11.油漆间消防管系密性试验

Painting RM.Fire fighting pipe to be done air-tightness test.12.驾驶室喷淋管系效用试验 W/H jetting pipe to be done function test.8、内装(木工)13.集控室浮动地板 Floating floor of E/C RM.14.集控室绝缘 Insulation of E/C RM.15.冷库地板绝缘 Insulation of Ref.RM.floor.16.冷库围壁绝缘 Insulation of Ref.RM.wall.17.冷库平顶绝缘 Insulation of Ref.RM.ceiling.18.冷库隔墙及顶大梁处绝缘

Insulation of separate wall and beam in Ref.RM.19.驾驶室浮动地板 Floating floor of W/H.20.主甲板浮动地板 Floating floor of main deck.21.驾驶室绝缘 Insulation of W/H.22.A甲板绝缘(包括A甲板A60绝缘)Insulation of A-deck(including A60 insulation).23.主甲板绝缘

Insulation of main deck(including A60 insulation).24.应急发电机室绝缘(包括应急发电机室A60绝缘)Insulation of emergency generator room(including A60 insulation).25.CO2室绝缘 Insulation of CO2 room.26.机舱逃口绝缘(包括机舱逃口A60绝缘)Insulation of escape in E/R.(including A60 insulation).27.F11#舱壁绝缘(包括F11#舱壁A60绝缘)Insulation of F11# bulkhead in E/R.(including A60 insulation).28.应急消防泵室绝缘(包括应急消防泵室A60绝缘)Insulation of emergency fire fighting pump RM.(including A60 insulation).船舶制造英语日常用语

29.舵机房绝缘 Insulation of steering gear RM.30.A甲板流平层敷料 Something deck covering of A-deck.31.主甲板流平层敷料 Something deck covering of main deck.32.驾驶甲板流平层敷料 Something deck covering of W/H deck.33.……舱室-围壁绝缘 One wall insulation of…… 34.全船储藏室完整性提交 Completeness of all locker to be inspection.35.全船房舱完整性提交 Completeness of all cabin to be inspection.36.船长室、轮机长室(电机员室)敷板前检查隔热安装

Inspection insulation installation for master room, Chief engineer room(electrical engineer room)before panel.37.船长室(轮机长室)舱室完整性(木工和内部装饰)提交

7.船舶制造个人简历 篇七

随着知识经济和高科技产业的迅速发展, 项目管理的重要性日益被越来越多的企业及组织所认识, 以最小成本获取最大利润的指导思想下, 每个企业都要想方设法降低工程项目投资, 追求最低成本支出, 以最低价来实施项目。

2008年爆发的金融危机使全球经济遭遇重创, 即使是经济快速而平稳发展的中国, 也未能独善其身。我国船舶制造企业业发展也不可避免的遭受到金融危机的巨大影响。在金融危机背景下, 船舶制造企业如何强化项目成本管理, 是船舶制造企业必须要予以高度重视问题。

一、金融危机对造船企业项目成本管理影响

船舶是一种大宗投资品。船舶制造企业目前已是个世界性的行业, 国际化的市场。造船市场的买方和卖方并不局限于某一区域, 而是在世界范围内进行交易。世界造船业自2003年以来, 进入了高速增长期, 但自2007年下半年开始, 造船业的外部环境日益趋紧。由于发轫于美国的次贷危机愈演愈烈, 逐步演变为全球性的金融危机, 并逐步向实体经济扩展, 世界经济的发展速度已经明显放缓, 国际贸易急转直下, 融资环境日趋恶化, 反映航运业景气度的“波罗的海干散货运价值指数”大幅下跌, 从年初的11000多点, 下降到最低的600多点, 航运市场运力过剩苗头已经显现。船舶制造企业随之感受到询价的减少, 承接新船的订单速度放缓。与此同时, 受金融危机影响, 船东融资难度加大, 订船需求大幅下降。同时, 各船舶制造企业在合同执行过程中, 也会面临船东方面更多的挑剔, 更加严格的监造, 甚至可能面临船东弃船的巨大风险。

就我国来看, 随着金融危机影响的进一步深入, 新船的订单速度放缓。我国的造船业也不可避免的遭受到了巨大影响。近两年新船订单量还将进一步减少, 新船价格逐渐下降。

凡此种种都对船舶制造企业的项目成本管理产生了重大影响。金融危机背景下一些船东也纷纷要求修改合同交船期, 设备供应商也很难按新的计划提前供货, 使得新的船舶建造计划几乎无法完成。

二、当前船舶制造企业项目成本管理现状及其存在问题

船舶制造业是一项复杂的系统工程, 它具有单件、小批生产、周期紧、多工种时间有序、空间分道、产品设计及工程设计占有重要的地位等特点。改革开放以来, 我国船舶制造业市场规模不断扩大, 为了扩大企业在市场上的优势地位, 每个企业都加强了对造船项目成本的管理。主要是: (1) 进度管理。造船工程项目的进度控制是一个综合的问题, 也是影响成本管理的主要因素。企业根据船对工期和工程量的要求, 设定进度控制点, 编制进度计划, 设计进度控制管理程序图。 (2) 质量管理。质量是项目质量的保证, 没有好的质量, 再好的方案也无法实现。在项目过程中, 企业必须严格按照设计图纸进行建造, 如果发现图纸中存在问题, 必须及时与船东协商, 确定解决方案, 并最终形成符合船东要求的产品, 不允许只根据习惯和经验进行建造, 更不允许擅自修改设计方案。 (3) 费用控制。在项目进行过程中, 经常发生一些不可预见的情况, 不可预见费一般都单独开列, 约占造船总成本的3%左右, 由于各种原因, 这部分费用公司往往不能如期得到。 (4) 项目中标管理。随着我国船舶制造项目管理程序的不断完善, 越来越多的造船项目开始走向社会、甚至面向国际, 面向市场, 采用招标投标的方式来进行运作, 只有不断中标, 才能更好创造利润, 也才能实现规模经营, 从而更好节约生产成本。

(二) 我国造船企业项目管理成本管理存在的主要问题

面对经济危机, 每一个船舶制造企业都必须重视企业项目管理问题的查找和分析, 忽视这些问题显然不利于企业的长期健康发展。目前我国船舶制造企业项目管理还存在着一些问题, 主要是:

1、项目成本管理观念仍有待于进一步提高。

目前一些船舶制造企业虽然重视投项目成本管理, 也成立了项目部, 但是整体看来, 项目成本管理还被视为等同于合同管理和建造管理及项目风险防范, 对各种成本管理应对措施在事前了解不多。非专职项目管理人员参与项目管理的积极性不高。

2、项目成本管理过程中成本量化方面做得不够。

风险发生的概率为多大?项目过程中发生的成本是多少质量不符合要求要承担的损益是多少?这些都没有具体去做, 对项目部来说是值得进一步研究的问题。

3、公司的管理结构不能适应项目管理需要。

有效的企业管理结构可以确保成本被有效地控制, 因而建立和健全企业管理组织体系是实施成本管理的关键。目前很多船舶制造企业 (尤其是中小造船企业的管理模式是一种至上而下的领导型模式。由总经理领导各职能部门;各职能部门领导各专业人员分别与船东协调解决船舶建造过程中的各种问题。但由于这种管理模式以总经理为中心, 过于注重领导的意志在做出决策时往往忽略了项目关系人如船东、设备供应商等对项目的影响, 实际上, 他们意志直接影响着项目成本管理高低。

4、轻视项目管理中的沟通管理。

船舶制造业是一项复杂的系统工程, 造船业产业链很长。现阶段很多船舶制造企业的项目经理负责的范围大多主要为项目的建设阶段, 而项目的前期决策及合同签订和后期阶段的售后服务等大多由企业的其它部门负责, 在对于控制成本效果最显著的决策和设计阶段, 项目经理很少插手。这样就造成了项目成本控制的分割, 而不让项目经理参与决策和设计就对事先控制的效果大大的打了折扣。

三、金融危机背景下, 优化造船企业项目成本管理的对策

由于金融危机的爆发, 导致全球船市下行。在全球造船市场持续多年兴旺之后, 2008年下半年进入下行通道。而另一方面全球造船能力快速扩张, 能力过剩压力逐渐加大。应对金融危机, 任何一个船舶制造企业都必须高度重视企业项目成本管理, 进一步构建完善的项目成本管理体系。

1、组建专业化的项目成本管理组织。建立了一支高水平、多专业的项目成本管理团队, 从各个方面来预防和管理项目中可能遇到的其他的风险, 前期设计、后期的管理都有专业的人员来参与。严格控制项目的建设成本, 聘请专业工程师参与各种合同的谈判, 并在控制成本的同时, 严把质量与安全关。通过专业人员, 对市场情况进一步进行深入的市场调研, 以适应市场需求的变化。

2、改善造船企业管理组织的领导结构。在金融危机背景下, 船东弃船、改变合同要求以及要求延期支付情形逐渐增多, 而在目前的企业领导结构模式下, 造船项目的任何变动都需要层层上报, 决策后再层层下达。这也使得企业无法及时对变动所带来的各方面影响做出整体的评估, 进而不能对计划和成本等多方面做出及时有效的控制。因此, 需要进一步改善企业的管理的结构, 可以实施矩阵式组织结构, 在组建项目团队时, 项目经理从各个职能部门抽调项目成员, 项目团队受职能经理和项目经理的双重领导。矩阵式组织结构最大程度体现了项目管理组织柔性的特点, 项目在结束后成员回到各自所在的职能部门, 在项目进展中严格按照项目管理的方法执行和考核, 确保每个项目目标的实现。

3、高度重视项目的质量监管。项目部要以制度建设作为抓好质量的根本保证, 建立层层负责的质量责任制, 形成全过程、全方位的质量保证体系;以项目招标、项目监理、项目合同管理作为质量管理的基础性工作。在每一个项目中, 都能同时得到分别来自监理单位和建设单位的各自独立的两套质量检测与评估报成本管理。否则一旦出现质量问题, 将会进一步扩大生产成本。

4、实施战略成本管理。目前很多船舶制造企业主要实行的是目标成本管理, 在金融危机背景下, 这种成本管理方法往往仅局限于企业内部的价值耗费, 忽视外部环境对成本影响。在金融危机背景下, 船舶制造企业要改变目标成本管理法, 积极实施战略成本管理法。船舶制造企业是劳动力、资金和技术密集型制造企业, 属于单件定单小批量生产型企业, 具有建造周期长、生产过程复杂、单船造价高等特点, 这使得造船产品具有无差异性。低成本战略是我国造船企业的合理选择, 即通过实施低成本战略获得低成本竞争优势。

5、加强项目沟通管理。项目部要整合项目内外部资源, 共同为项目成本控制服务。为此, 要提高项目监理在造船项目成本管理中的作用。监理制作为科学的项目管理方法, 主要是以国家政策、造船行业技术规范、定额、合同等为依据, 跟踪控制设计过程和建造过程的投资、工期和质量, 确保标的实现。

参考文献

[1]、迈克尔.波特.竞争战略.北京:华夏出版社, 2003.

[2]、王婧.造船企业供应链的构建及特征分析[J], 交通企业管理, 2006, (6) .

8.船舶制造个人简历 篇八

关键词:成本管控;效能提升;船舶制造企业;成本控制体系

对于当前影响我国造船业的总体效益,阻碍其快速发展的最关键因素就是造船成本,为此加强对造船企业中成本的控制是实现企业经济效益的提升、提升市场力的首要工作。再全球新经济秩序下,世界上一些在造船业较为领先的国家和地区看重了我国国内发展劳动密集型产业良好的内部环境,纷纷将一些生产工艺环节放在中国进行,为此对我国本土的造船产业形成了巨大的冲击,使得我国造船企业在发展过程中不仅要与国内的同行之间进行竞争,同时还受到国外其他企业的挑战。但是从总体上看,由于国内科学技术水平相对较低,造船业的信息化水平起步较晚,使得当前国内造船企业对于其自身的成本管理还存在很多问题,不能够对企业运转的全过程加以监管,使得当前成本高、管理混乱成为我国造船企业中普遍存在的现象,为此必须通过一套科学、有效、完善的成本管理的机制,去对国内造船企业的成本控制环节加以规范,进而能够有效保证企业能够在竞争激烈的市场环境下获得一席之地。

一、船舶制造项目中的成本控制体系

根据目前我国的船舶成本控制的状况,用项目进行管理是成本管理思想的指导,应该使用新型的成本控制方法基于现在高成本的控制,形成完整的控制体系结构。鉴于目前船舶结构中的成本控制方面出现的问题,构建一系列完整的体系。船舶制造项目的成本控制体系包括以下方面。

(一)采取目标成本的制定和分解方式

依据合同款项、预期的利润等对船舶的整体的成本进行控制,又是为了更好的完成目标,可以按照中间产品的制作时间对成本总量进行分解,使船舶产品成本更加的明确具体,也可以将这些责任落实到车间、分包商等外协单位。

(二)设计阶段的成本控制

每一项产品的制造,其设计阶段都非常重要,对于船舶制期,就应该对所需要的所有东西进行价值评估,再进行成本核算,然后同预算成本进行对比,最后是设计出最佳的方案。

(三)采购阶段的成本控制

这个阶段主要是进行采购数量和采购单位的控制。在进行采购时,依据设计需要,列出采购计划表进行有序采购,采购过程中的成本控制主要集中在如何控制规范选择最好的供应商。

二、船舶企业降低成本的主要措施

(一)开拓市场,保证产品的质量

产品的成本主要有两个方面构成的,一方面试固定的成本费用,另一方面是变动的成本费用,而变动的成本费用中具有三个变动点,其一是直接材料:指生产中与产品形成直接相关的各种材料、燃料的消耗。其二是直接人工:指支付给直接生产工人的各种工资福利性支出。其三是变动的间接费用:指产品生产中发生的、各种间接性的生产消耗。

(二)合理降低采购的成本

要想合理的降低船舶企业的采购成本,首先要做的一件事就是要进行深入的市场分析,对船舶企业能够用到的材料的价格走势、市场量以及材料的质量有一个基本的判断能力,选择合适、性价比较高的材料,于此同时,还要加强谈判的力度以及还价的能力,通过集团的规模效应进行集中采购可以有效降低采购成本,增加话语权。其次要加强采购的管理,完善采购的制度,坚持订货要有根有据,要严格按照控制采购的节奏,降低存货的成本。 最后要严格执行领料的制度,建立限额卡,凭卡进行材料的领取和发放。

(三)做好设计的成本控制以及提高材料的利用率

从设计的源头进行成本的控制。要提高设计人员的素质,推广混合套料,通过先进的软件以及信息化的管理手段来减少人员设计时的算错率以及修改率,减少因修改而造成的返工浪费。第二,要优化设计,优化套料的方法,以提升钢材利用率。

(四)提高员工的劳动生产率以及控制人工的成本

劳动生产率的核心是人的劳动效率,因此,要对船舶企业的相关劳动人员进行一些必要的培训措施,以增加船舶企业员工的职业素质,由此来提高船舶企业员工的劳动生产率,其次要充分,利用有效的上班时间,合理的安排工作计划以及施工的工序。要加强生产技术管控力度,减少中间环节浪费的时间,缩短生产的周期。

(五)强化预算管理、监管力度以及过程控制

对于每项费用在支出前都要做好预算,分级考核以保证预算机制的全面性。要增强监管的力度,细化环节,指明负责人,严格按照相关的程序进行生产,以严格的奖惩制度增加各项工作的监控力度。 要强化控制的过程,做到环环相扣,在做好成本的有效管理的同时严抓各项的管理以及过程的管理。

三、结束语

综上所述,现阶段下的企业成本控制和降本增效必将成为企业日常经营管理的一项重要内容,企业的成本控制和降本增效必然会导致企业日常经营管理工作更加复杂和难以应对。但是一个企业的成本控制能否顺利开展,企业的降本增效能否顺利实现,在很大程度上取决于企业成本控制方法的全面程度、改善力度的到位程度和降本增效意识的提高程度,这一切毫无疑问会给企业的生产经营和持续发展注入新的活力和动力,从而使得企业的成本控制和降本增效的开展迈向崭新的轨道。

参考文献:

[1]马自勤.现代成本控制与管理[M].大连:大连交通大学出版社,2010,25,29.

上一篇:语文《中国建筑的特征》教学反思下一篇:学校工会经审工作总结报告书